HomeMy WebLinkAbout20201981 Ver 1_Meeting Request Review_20201217 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20201981 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 12/17/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Della Moore
Contact Email Address* drmoore2@ncdot.gov
Project Name* Durham Street Bridge Extension
Project Owner* NCDOT
Project County* Alamance
Owner Address: Street Address
P.O. Box 14996
Address Line 2
City State/Rovince/Region
Greensboro NC
Fbstal/Zip Code Country
27415 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
17.B.P.7.R.122&B-5346/SR1529
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
The North Carolina Department of Transportation (NCDOT) has
proposed to replace Alamance County Bridge No. 3 on Durham
Street(SR 1529), project B-5346 over Dry Run creek;a poorly
functioning,substandard old bridge with a new bridge. Bridge No. 3 is
located just north of the Town of Elon and City of Burlington.
Subdivision Streets intersect SR 1529 just north and south of the
existing bridge location.The existing structure is a three span
(1@17'8, 1 @17'0, 1@17'8)and is a timber deck on timber joists.The
abutments and interior bents are timber caps, posts and concrete
sills(timber bulkheads).The proposed structure is a single span
(1 @70'-24")prestressed concrete cored slab with 4'deep caps.This
structure has been designed to have as little environmental,
wetlands,and surface water impacts as possible.2:1 roadway fill
slopes shall be constructed to minimize drainage impacts in
accordance to NCDOT design standards.
Please give a couple of dates you are available for a meeting.
12/22/2020
1/5/2021
Please attach the documentation you would like to have the meeting about.
17BP7R122 Bridge No. 3 B5346 100%
13.98MB
Plans.pdf
00 0003 2017 Rev 2017 B5346 DRY CREEK
3.83MB
SR 1529.pdf
B-5346 NRTR.pdf 4.52MB
B-5346 Vic Map.pdf 219.11KB
Bridge No. 3 Site Map.pdf 1.11MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 12/17/2020
Reviewer Meeting Request Decision
......................................................................................................................................................................................................................................................................................................................................
Has a meeting been scheduled?* C Yes t: No