Loading...
HomeMy WebLinkAbout20070812 Ver 2_Meeting Minutes_20061106rl ly, bk ?1? r ? ,, (yol him) Fie ,?w.?ma I Q. (k?u?? Cwt) acv -WA f a - , v n od I??Em Fi w.e_ F ??s .T.?,. wpm. W )a,l Yadkin Project RSA Language for Water Quality 104 Subject: Yadkin Project RSA Language for Water Quality From: BLEYLVA@aol.com Date: Wed, 1 Nov 2006 15:38:00 EST To: john.dorney@ncmail.net, darlene.kucken@ncmail.net, jim.mead@ncmail.net, Steven. Reed@ncmai1.net, west. ben@epamail.epa.gov CC: mbern@ncdoj.com, gene.ellis@alcoa.com, dbenn@llgm.com, SDPADULA@aol.com John, Darlene, Jim, Steve and Ben, As we discussed during our last conference call on 10/23/06, APGI has drafted language for the water quality provisions of the Yadkin relicensing settlement agreement (RSA) that reflects the agreed upon DO Enhancement schedule for the Project. The attached draft includes both the Non-FERC provisions of the RSA with respect to water quality, as well as proposed FERC license articles. We have attached a copy of the draft language for your review in advance of our conference call scheduled for Monday November 6 at 3:00 PM. For the conference call please use the usual dial-in number 1-800-582-9029, meeting number *7044225594*. In addition to reviewing the attached RSA language, we'd also like to use the call on Monday to again review the schedule for the 401 Application with you. We look forward to talking with you on Monday. Wendy Bley Long View Associates RSAArticlesWQ110106.doc Content-Type: application/octet-stream I Content-Encoding: base64 1 of 1 11/6/2006 2:53 PM CONFIDENTIAL - Not for Distribution Outside the Negotiations Process Yadkin Project Relicensing Settlement Agreement - Draft Language DRAFT - Water Quality NON FERC PROVISIONS 1.0 Water Quality 1.1 Tailwater Dissolved Oxygen Enhancement Schedule The Licensee shall install equipment and implement measures designed to enhance Project tailwater dissolved oxygen conditions as specified in the schedule in Table WQ-1. Table WQ-1 - Dissolved Oxygen Enhancement and Monitoring Schedule Year -DO Enhancement Action Monitoring/Reporting 2007 - Continuous DO/temp monitoring 5/1-11/30 at existing stations in all four tailwaters. - File Draft DO Monitoring and QAPP with NCDWQ as part of 401 Application. 2008 Narrows Unit 2 - Addition of two - Continuous DO/temp monitoring 5/1-11/30 at existing stations aeration valves by 03/31/08. in all four tailwaters. - File Final DO Monitoring Plan and QAPP for approval by NCDWQ and FERC. 2009 Narrows Unit 1 - Addition of two - Implement NCDWQ/FERC approved DO Monitoring Plan. aeration valves by 12/31/09. - File annual DO monitoring data report with NCDWQ by March 1. 2010 Narrows Unit 3 - Addition of two - Monitoring/reporting in accordance with DO Monitoring Plan. aeration valves by 12/31/10. High Rock Unit 3 - Install "through the blade" aerating turbine b 12/31/10. 2011 High Rock Unit 2 - Install a " - Monitoring/reporting in accordance with DO Monitoring Plan. through the blade" aerating turbine by 12/31/11. - Initiate special study (up to 2 years) to evaluate the effectiveness of the aeration at Narrows on DO levels being dischar a from Falls 2011-2012 2012 High Rock Unit 1 - Install a " - Monitoring/reporting in accordance with DO Monitoring Plan. through the blade" aerating turbine by 12/31112. -Complete second year of 2-year study of effectiveness of aeration at Narrows on DO at Falls by 12/31/12 and prepare Stud Report. 2013 - Monitoring/reporting in accordance with DO Monitoring Plan. - File 2 year Narrows/Falls DO Study Report with NCDWQ by 3/1/13. - If 2-year study does not demonstrate compliance at Falls file , an Action Plan for DO enhancement at Falls with NCDWQ by 12/31/13. - Initiate special study (up to 2 years) to evaluate the effectiveness of aeration at High Rock on DO levels being dischar ed from Tuckertown (2013-2014). Revised 11/1/06 Pagel CONFIDENTIAL - Not for Distribution Outside the Negotiations Process Yadkin Project Relicensing Settlement Agreement - Draft Language Year DO` Enhancement Action ,Monitoring/Reporting: 2014 Falls Unit 1 - Install aeration - Monitoring/reporting in accordance with DO Monitoring Plan. valves or other appropriate aeration technology, if needed, in - Complete second year of 2-year study of High accordance with Falls Action Rock/Tuckertown DO by 12/31/14 and prepare Study Report. Plan b 12/31/14. 2015 Falls Unit 2 - Install aeration - Monitoring/reporting in accordance with DO Monitoring Plan. valves or other appropriate aeration technology, if needed, in - File 2 year High Rock/Tuckertown DO Study Report with accordance with Falls Action NCDWQ by 3/1/15. Plan by 12/31/15. - If 2-year study does not demonstrate compliance at Tuckertown, file an Action Plan for DO enhancement at Tuckertown b 12/31/15. 2016 Falls Unit 3 - Install aeration - Monitoring/reporting in accordance with DO Monitoring Plan. valves or other appropriate aeration technology, if needed, in accordance with Falls Action Plan by 12/31/16. Tuckertown - Install aeration technology, if needed, at Tuckertown in accordance with Tuckertown Action Plan by 12/31/16. Notes: 1 Actions to be taken under the current FERC license for the Yadkin Project 2 The schedule shown starting in 2008 assumes an effective date of the new FERC license for f the Yadkin Project of or before May 1, 2008. If the effective date of the new license is after IoR May 1, 2008, the schedule will be adjusted such that the 2008 sch d e would begin within the year following the effective date of the new license.a,4., ? " MIV ? dQ6,)- V\ ?to 1.2 Tailwater Dissolved Oxygen Enhancement Operations As dissolved oxygen enhancement equipment or measures are installed or implemented on the schedule in Table WQ-1, the Licensee shall operate the generating units with dissolved oxygen enhancement equipment added on a "first-on-last-off" basis, subject to unit availability, from no later than May 1 of each year through November 30 of each year. If at any time during the term of the new FERC license, the Licensee can demonstrate through studies and/or monitoring that dissolved oxygen conditions have improved, the Licensee may consult with NCDWQ regarding the possibility of reducing the period of dissolved oxygen enhancement operations (May 1 - November 30). Should any such consultation result in av( L')" 61- agreement between the Licensee and the NCDWQ to modify the operation of the Project for purposes of dissolved oxygen enhancement, the Licensee shall consult with the NCDWQ to develop a plan to revise dissolved oxygen enhancement operations. The Licensee shall include with the plan, an implementation schedule, documentation of consultation, copies of comments and recommendations on the plan after it has been prepared and provided to NCDWQ, and specific descriptions of how NCDWQ's comments are accommodated by the plan. The Licensee shall file the plan with the Commission within 30 days of receiving NCDWQ's approval of the plan. 1.3 Dissolved Oxygen Monitoring W[?M Revised 11/1/06 Paget CONFIDENTIAL - Not for Distribution Outside the Negotiations Process Yadkin Project Relicensing Settlement Agreement - Draft Language Within six months of the effective date of the new FERC license, the Licensee shall file with NCDWQ a dissolved oxygen monitoring plan (DO Monitoring Plan) and Quality Assurance Project Plan (QAPP) for the Project. The DO Monitoring Plan and QAPP will be developed in consultation with NCDWQ and other appropriate state and federal resource agencies. The primary component of the DO Monitoring Plan will be the operation of four (4) continuous DO/temperature monitors (one in each tailwater), for the period May 1 through November 30 of each year. The Plan shall include a schedule for preparing an annual DO and temperature data report. The annual report shall be filed with NCDWQ no later than March 31 of the following year. The Plan shall also include provisions for conducting two studies as part of the overall DO enhancement schedule (Table WQ-1) designed specifically to investigate the effectiveness of aeration technology installed and operating at Narrows, on the DO conditions in the Narrows and Falls tailwaters, and the effectiveness of aeration technology installed and operating at High Rock on DO conditions in the High Rock and Tuckertown tailwaters. At the completion of each of the two studies, the Licensee shall prepare a study report which shall be filed with NCDWQ in accordance with the schedule in the DO Monitoring Plan. If the study results demonstrate that the Falls and/or Tuckertown tailwaters do not meet state dissolved oxygen standards as a result of Project operations, the Licensee shall prepare a DO Action Plan (DOAP) for the Falls and Tuckertown developments, respectively. The resulting DOAP(s), if needed will be filed with NCDWQ in accordance with the schedule shown in Table WQ-1. The Licensee shall include with the DOAP an implementation schedule, documentation of consultation, copies of comments and recommendations on the plan after it has been prepared and provided to NCDWQ, and specific descriptions of how NCDWQ's comments are accommodated by the plan. The Licensee shall file the plan with the Commission within 30 days of receiving NCDWQ'sy?approval of the plan. wI * 1.4 Additional Dissolved Oxygen Enhancement Actions If at any time during the term of the new FERC license, after all the dissolved oxygen enhancement equipment and measures outlined in Table WQ-1 have been installed and implemented, the Licensee is notified by the NCDWQ that based on the results of monitoring under the DO Monitoring Plan, state water quality standards are not being met as a result of the Licensee's hydroelectric operations, the Licensee shall consult with the NCDWQ to develop a plan to implement corrective actions. The Licensee shall file a Dissolved Oxygen Corrective Action Plan (DOCAP) for NCDWQ approval within one year of initiating consultation with the NCDWQ. The Licensee shall include with the DOCAP an implementation schedule, documentation of consultation, copies of comments and recommendations on the plan after it has been prepared and provided to NCDWQ, and specific descriptions of how NCDWQ's comments are accommodated by the plan. The Licensee shall file the plan with the Commission within 30 days of receiving NCDWQ's approval of the plan. 1.5 TMDL Process The Licensee agrees to participate in the High Rock Total Maximum Daily Load (TMDL) process for High Rock Reservoir initiated by the State of North Carolina in 2005. The Parties agree that the Licensee will contribute up to $50,000 in in-kind services for planned water quality sampling efforts, upon notification that the Yadkin-Pee Dee River Basin Association has received federal or state grants of at least $50,000, for which the Licensee's contribution will be used as the required "matching funds". Revised 11/1/06 Page3 t . , CONFIDENTIAL - Not for Distribution Outside the Negotiations Process Yadkin Project Relicensing Settlement Agreement - Draft Language If, during the term of the new license, other TMDL processes are required for the Yadkin River or its tributaries, within the Project Boundary of the Yadkin Project, the Licensee will participate in these processes. FERC LICENSE ARTICLES COW fie- W 2.0 Water Quality 2.1 Article WQ-1 - Water Quality . ere _ The Licensee shall operate the Project in accordance with the conditions of thepater quality certification submitted by the North Carolina Division of Water Quality under section 401 of the Clean Water Act. 2.2 Article WQ-2 - Dissolved Oxygen Monitoring The Licensee shall conduct dissolved oxygen (DO) monitoring pursuant to the DO Monitoring Plan approved by the North Carolina Division of Water Quality as part of the water quality certification issued by that agency and attached to the license as an Appendix. Any subsequent amendments to the DO Monitoring Plan approved by NCDWQ shall also be approved by the Commission prior to implementation. Copies of the annual DO monitoring reports submitted to NCDWQ shall be filed with the Commission within 30 days of their filing with NCDWQ. 1 C% Revised 11/1/06 Page4