Loading...
HomeMy WebLinkAboutNCC191622_NOT Closeout Documents_20201221North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: Project Wavy River basin: Yadkin-PeeDee Person financially responsible: CARVANA, LLC - Paul Breaux, General Counsel, Project #• CABAR-2020-009 & VP Address: 1930 W. Rio Salado Parkway, Tempe, AZ 85281 1. Project Location: Roberta Road, Concord Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Steve Carro Inspection report: Sent Report 9. Corrective action needed: Title: Myers Chapman Date given/sent: November 20, 2020 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas and rills on some slopes that need to be repaired and stabilized. Silt fence needs to be removed and stabilized those areas. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. All project that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Kenny Llywelyn Others present: Date of inspection: November 18, 2020 Time arriving on site: 11:00AM Time leaving site: 12:05 AM cc: