Loading...
HomeMy WebLinkAboutU-3110A STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR Ms. Amy Euliss N.C. Division of Water Quality 585 Waughtown St. Winston-Salem, NC 27107 Re: Michael's Branch Stream Mitigation Site, Alamance County, State Project.No. 8.247200 1, TIP No. U-3110A, Action ID No. 199700602, DWQ Proj. No. 021105 Ms. Euliss: As you are aware, the Department has monitored the Michael's Branch Stream Mitigation Site since its construction in December of 2003. Located in Alamance County, adjacent to University Drive off I-40, this site provides 780 linear feet of stream mitigation for impacts associated with the U-31 l0A project. The stream relocation was revegetated with bottomland hardwood species and the streambanks must be considered stable at the end of the five year monitoring period. Per permit requirements, NCDOT was required to complete full channel stream stability monitoring for five years or until success criteria were met: hydrologic monitoring was not required for this project. Stream dimension monitoring required the use of permanent cross sections and surveying was completed in the 1", 3`d, and 5°i years after construction. During the monitoring period, monitoring reports were submitted to the appropriate regulatory agencies via the Natural Environment Unit's (NEU) website: http.1111-O tir.rzcclot or",idohim'ecoi7sii-Licr/ne/neidAlonitorrn?/Maiitorin<=Reporte litrnl After the fifth formal year of stream stability monitoring, the Michael's Branch Stream Mitigation Site indicates that the planted vegetation is surviving and the streambanks remain very stable at this time. Individual monitoring data is provided within the annual monitoring reports available on NEU's website for 2005, 2007 and 2009. Two year visual quarterly monitoring has been previously completed between 2005 and 2007 in accordance with the Anny Corps of Engineers permit conditions. September 9, 2010 LYNDO TIPPETT SECRETARY I- ADDRESS: RTMENT OF TRANSPORTATION DEVELOPMENT AND ENVIRONMENTAL ANALYSIS L SERVICE CENTER NC 27699-1598 TELEPHONE: 919-715-1334 FAX: 919-715-1501 WEBSITE' WWWNCDOLORG LOCATION: PARKER LINCOLN BUILDING 2728 CAPITAL BOULEVARD RALEIGH NC A site visit was conducted on July 29"', 2010 with the regulatory agencies and NCDOT personnel present. It was determined at that meeting that the site success criteria had been met and that no further monitoring would be required. NCDOT requests that the appropriate resource agencies provide written documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at'(919) 715-1425. Sincerely, N Philip S. Harris, III, P.E., Unit Head PDEA- Natural Environment Unit cc: Mr. Andy Williams, ACOE Mr. Travis Wilson, WRC Mr. Chris Militscher, EPA Mr. Gary Jordan, USFWS Mr. Scott McLendon, ACOE Mr. Brian Wrenn, D W Q Mr. David Harris, P.E., NCDOT-REU Mr. Jerry Parker, NCDOT-DE07 Mr. Randy Griffin; NCDOT-NEU