Loading...
HomeMy WebLinkAboutNC0071862_wasteload allocation_19930301NPDES WASTE LOAD ALLOCATION PERMIT NO.: NCO071862 PERIVIITTEE NAME: Lana Ashe Odom FACILITY NAME: Odom Associates Development Moble Home Facility Status: Existing Permit Status: Renewal Major Pipe No.: 001 Minor -I Design Capacity: 0.022 MGD Domestic (% of Flow): 100 % Industrial (% of Flow): Comments: refer: Basinwide / Streamline WLA file at front of subbasin STREAM INDEX: 6- 5-11- 5 RECEIVING STREAM: Clear Creek Class: C Sub -Basin: 0403-02 Reference USGS Quad: F9SW, Hendersonville (please attach) County. Henderson Regional Office: Asheville Regional Office Previous Exp. Date: 12/31/92 Treatment Plant Class: I?, II? Classification changes within three miles: > 3 mi Requested by: Jule Shanklin ate: 1017/92 Prepared by: L Date: zl z y 9? Reviewed by: j , Date: 1 Modeler Date Rec. # 109 qv Drainage Area (mi`) 3 9 Avg. Streamflow, (cfs): 7Q10 (cfs) Winter 7Q10 (cfs) 30Q2 (cfs) 26.5 Toxicity Limits: IWC % Acute/Chronic Instream Monitoring: Parameters Upstream Location Downstream Location Effluent Characteristics Summer Winter BOD5 (m ) NH3-N (mg/1) 30 ��✓ D.O. (mg/1) h� TSS (mg/1) F. Col. (/100 ml) pH (SU) 30 h� 6 - TF"W Comments: oboty" UNITED STATES A) 370 ' TENNESSEE VALLEY AUTHORITY MAPPING SERVICES BRANCH 4554 IV NW 1 r27130' 1 %8 3691 (FRIIV .IITLAND 202-W) 1— L - ) 371 25' 372 \x in n 0 zi Ch oa-Hill * t% X\ A iV, N, -7-: r2`160-- S� L>— Y N 0 i � v A. -toqnezer N -ores GroYe t c— cp f9k, —4, --fq o F; 7. N�- 6, % Ri 7 r a SN' it X. Ito. A f -Z. A 4- ar U lry fit Wo "OV A A X VI" # K j V..-ffAP. A fi -'�; 'Z_ " IN N, 2 COPY > -7- ;i -51 -41 K 7; t J-� N� t.", )" a i7, JbA'k t N A. 4p1 r FACT SHEET FOR WASTELOAD ALLOCATION Request # 7137 Facility Name: Odom Associates Development Mobile Home NPDES No.: NCO071862 Type of Waste: Domestic - 100% Facility Status: Existing Permit Status: Renewal Receiving Stream: Clear Creek Stream Classification: C Subbasin: 040302 County: Henderson Stream Characteristic: Regional Office: Asheville USGS # Requestor: Shanklin Date: Date of Request: 10/8/92 Drainage Area (mi2): 39 Topo Quad: F9SW Summer 7Q10 (cfs): 11.3 Winter 7Q10 (cfs): 16 Average Flow (cfs): 64.4 30Q2 (cfs): 26.5 IWC M: 0. 3% Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) Facility requesting renewal of existing NPDES permit. Tech Support recommends renewal of existing limits. Special Schedule Requirements and additional comments from Reviewers: '1 Recommended by: Reviewed by Instream Assessment: . 1 Regional Sup�No Permits & Engineering: Date:_l 1/9/92_ r//.*f1, RETURN TO TECHNICAL SERVICES BY: DEC 3 0 1992 2 Existing Limits: Wasteflow (M[GD): BODS (mg/l): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): Recommended Limits: Wasteflow (MGD): BOD5 (mg/1): N113N (mg/1): DO (mg/1): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): CONVENTIONAL PARAMETERS Monthly Average Summer Winter 0.022 30 monitor nr 30 nr 6-9 Monthly Average Summer Winter 0.022 30 monitor nr 30 nr 6-9 Limits Changes Due To: Change in 7Q10 data Change in stream classification Relocation of discharge Change in wasteflow Other (onsite toxicity study, interaction, etc.) Instream data New regulations/standards/procedures New facility information WQ or EL FSIJ Parameter(s) Affected Parameter(s) are water quality limited. For some parameters, the available load capacity of the immediate receiving water will be consumed. This may affect future water quality based effluent limitations for additional dischargers within this portion of the watershed. M _X_ No parameters are water quality limited, but this discharge may affect future allocations. MISCELLANEOUS INFORMATION & SPECIAL CONDITIONS Adequacy of Existing Treatment Has the facility demonstrated the ability to meet the proposed new limits with existing treatment facilities? Yes No If no, which parameters cannot be met? Would a "phasing in" of the new limits be appropriate? Yes No If yes, please provide a schedule (and basis for that schedule) with the regional office recommendations: If no, why not? It Nt Wasteload sent to EPA? (Major) _ _ (Y or N) (If yes, then attach schematic, toxics spreadsheet, copy of model, or, if not modeled, then old assumptions that were made, and description of how it fits into basinwide plan) Additional Information attached? (Y or N) If yes, explain with attachments. yy, 1#4,/C A t- ozz.g6;o w41Ce A 33 3.2 . D3� f Ode �`�� cJcA �.;V, A"ti�.; Axc , odum assoc. dev. mobile home AMMONIA ANALYSIS 7Q10: 11.3000 cfs NH3 Effl. Conc: 19.0000 mg/1 AL (1/1.8 mg/1): 1000.00 ug/1 Upstream NH3 Conc.: 220.0000 ug/1 Design Flow: 0.0220 MGD Predicted NH3 Downstream: 276.50 ug/1 0.276501 mg/1 NH3 Limit: 259475.0 ug/1 259.4750 mg/1 AMMONIA ANALYSIS 7Q10: 16.0000 cfs NH3 Effl. Conc: 19.0000 mg/1 AL (1/1.8 mg/1): 1800.00 ug/1 Upstream NH3 Conc.: 220.0000 ug/1 Design Flow: 0.0220 MGD Predicted NH3 Downstream: 259.94 ug/1 0.259939 mg/1 NH3 Limit: 743148.9 ug/1 743.1489 mg/l (WINTER) CHLORINE ANALYSIS 7Q10: 11.3000 cfs CL2 Effl. Conc: 0.0000 mg/l AL (17/19 ug/1): 17.0000 ug/l Upstream CL2 Conc.: 0.0000 ug/l Design Flow: 0.0220 MGD Predicted CL2 Downstream: 0.00 ug/l 0 mg/l CL2 Limit: 5650.431 ug/l 5.650431 mg/l