HomeMy WebLinkAbout20201766 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201218Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, December 18, 2020 12:00 AM
To: jlwaters@urbanengineers.com
Cc: Mairs, Robb L
Subject: Pre -Filing Time Clock has been reached for National Gypsum Wilmington
Maintenance Dredging - 20201766 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for National Gypsum
Wilmington Maintenance Dredging that you submitted on 11/17/2020. The ID number for that project is 20201766,
Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201766
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 11/17/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jennifer Waters
jlwaters@urbanengineers.com
National Gypsum Wilmington Maintenance Dredging
National Gypsum Company
New Hanover
Street Address
2001 Rexford Road
Address Line 2
aty
Charlotte
Rbstal / Zip Code
28211
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Frovince / Region
NC
Country
United State
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The proposed maintenance dredging will occur via hydraulic dredging
(cutter suction) to dredge the material to -36' MLW + 2' overdredge.
Mechanical dredging via clamshell may also be utilized in locations
within the dredge area where timber inhibits the use of hydraulic
dredging. A total of approximately 17,000 cubic yards of material will
be dredged. Dredging equipment will be stored at the berth until the
maintenance dredging is complete. The maintenance dredging is
expected to take approximately 2 weeks to complete. The
hydraulically dredged material will be pumped (booster pump) to the
CDF via a pipeline sunken down to the river bottom. The dredged
material will be discharged at the existing CDF, which is located
directly across Cape Fear River from the dredge area and the CDF
will be isolated by an earthen berm. After the dredged material is
placed in the isolated area, effluent will drain back to the river in a
controlled manner through a strategically placed weir. An excavator
or bulldozer will be used to spread dredge material during disposal.
The mechanically dredged material will be transported and stored via
barge.
National Gypsum Company uses the facility for unloading gypsum for
wallboard production at the wallboard plant across River Road. Daily
operations will be able to continue when the maintenance dredging is
complete. If the berthing area is not dredged, there will be a
significant negative impact to the operations at the National Gypsum
Wilmington facility.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/17/2020