Loading...
HomeMy WebLinkAbout20070653 Ver 1_More Info Letter_20070416~~F W A TF9Q Michael F. Easley, Governor `~ (~ William G. Ross Jr., Secretary ~ ~ North Carolina Department of Environment and Natural Resources ~ ~ O ,~ Alan W. Klimek, P.E. Director Division of Water Quality April 16, 2007 DWQ Project # 07-0653 Caldwell County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Lake Hickory Operations, LLC James W. Surane 19520 W. Catawba Avenue Cornelius, North Carolina 28031 Subject Property: Long Island Marina: Redi-Rock Wall Water Quality Certification, Impact ® REQUEST FOR MORE INFORMATION ^ PERMITTING FEE MISSING/INCORRECT ^ RETURN OF APPLICATION PACKAGE Dear Mr. Surane: On April 11, 2007, the Division of Water Quality (DWQ) received your application dated March 21, 2007 for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information and/or fee. Please provide the following information so that we may continue to review your project. Additional Information Requested: ® Water Quality Certification, See I. Processing, Item 2.. Please state which Permit (Nationwide, Regional or General) number you intend to use. You may want to contact the U.S. Army Corps of Engineers (USAGE) to determine which permit they will allow you. to use. ^ DWQ requires the name of an individual shown as "Owner/Applicant" to set up the project. ^ The PCN Application failed to contain the Applicant/Agent's Signature and Date. See last page of application. (Agent's signature is valid only if an authorization letter from applicant is provided). ^ Water Body information not stated. See III Project Information, Item 7. ® Incorrect and/or missing wetland, intermittent-perennial stream and/or buffer impacts. DWQ is unable to review this project without noted or corrected impacts reflected. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http //h2o enr state nc.uslncwetlands Noe Carolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/l0% Post Consumer Paper ^ Lack of permitting fee. Please note that beginning January 1, 1999, the N.C. General Assembly passed legislation requiring payment of a fee for all 401 applications. The fee for applications is $200 for projects impacting less than an acre of wetland and less than 150 linear feet of streams. For projects impacting one or more acres of wetland or 150 or more feet of streams, the fee is $475. ^ Incorrect permitting fee amount. Please see above item. Your check # for $ is herein enclosed for fee correction. DWQ does not retain any payment unless it is in the correct amount. ^ A request for a modification of an issued permit requires re-submission of five (5) application sets and appropriate fee. We have herein returned your modification request. ^ DWQ is making the suggestion that all associated project maps be submitted as a PDF file on a CD in addition to two (2) paper copies. DWQ does require five (5) sets of the PCN application. ® OTHER: Page 8 of submitted application reflects no wetland, stream or open water impacts; however, on page 9, it reflects 180 linear feet of stream impact. Please submit a corrected page 8 to reflect recorded impact (1 original and 4 copies). Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or Ms. Cyndi Karoly at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to disc~ss this matter. Sin rely, ' Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ljd cc: Kevin Barnett, DWQ Asheville Regional Office USACE Asheville Regulatory Field Office Permits-4-U Inc., Ann Duncan, 19721 Bethel Church Rd., Cornelius, NC 28031 File Copy Central Files Filename: 070653 LakeHickoryMarinaRed iRock W all(Caldwell)_Hold_NW#