HomeMy WebLinkAboutNCS000175_Final Permit Cover Letter_20201211ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
December 11, 2020
J.L Beck
Veolia ES Technical Solutions, LLC
2176 Will Suitt Road
Creedmoor, NC 27522
Subject: NPDES Stormwater Permit
Permit No. NCS000175
Veolia ES Technical Solutions, LLC
Granville County
Dear Mr. Beck:
The Division of Energy, Mineral, and Land Resources' Stormwater Permitting Program
acknowledges receipt of your application for coverage under NPDES Permit No.
NCS000175 on November 20, 2013. In response to your application for coverage
under NPDES Permit No. NCS000175, the Division of Energy, Mineral and Land
Resources is forwarding herewith the subject state - NPDES permit. This permit is
issued pursuant to the requirements of North Carolina General Statute 143-215.1 and
the Memorandum of Agreement between North Carolina and the U.S. Environmental
Protection Agency dated October 15, 2007 (or as subsequently amended).
This final permit includes the following changes from the draft permit sent to you
on September 5, 2019:
Part III, Section E has been updated to reflect current reporting
requirements.
Please note that analytical and qualitative monitoring is required in this permit. Failure
to complete the monitoring as required is a violation of the permit and any permit
noncompliance constitutes a violation of the Clean Water Act. Reference Part III,
Section A, Item 2 "Duty to Comply", Item 9 "Penalties for Tampering" and Item 10
"Penalties for Falsification of Reports" of your permit for further information.
If any parts, measurement frequencies or sampling requirements contained in this
permit are unacceptable to you, you have the right to an adjudicatory hearing upon
DEQ North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
_ 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA
oen=ream of Enm—mental auei� 0 ` 919.707.9200
written request within thirty (30) days following receipt of this letter. This request
must be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings, Post
Office Drawer 27447, Raleigh, North Carolina 27611-7447. Unless such demand is
made, this decision shall be final and binding.
Please take notice this permit is not transferable. Part III, B.2. addresses the
requirements to be followed in case of change in ownership or control of this discharge.
This permit does not affect the legal requirements to obtain other permits which may
be required by the Division of Energy, Mineral, and Land Resources, or permits
required by the Division of Water Resources, Coastal Area Management Act or any
other federal or local governmental permit that may be required.
If you have any questions or comments concerning this permit, please contact Aana
Gamble at (919) 707-3648, or via email at aana.gamble@ncdenr.gov.
Sincerely,
for Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
cc: J.L. Beck, Veolia ES Technical Solutions, LLC, iay.beck@veoliaes.com
Thad Valentine, DEMLR Raleigh Regional Office, thad.valentine@ncdenr.gov
Attachments:
NPDES Stormwater Permit No. NCS000175