Loading...
HomeMy WebLinkAboutWQ0020493_STFRPT_20201217State of North Carolina Department of Environmental Quality Division of Water Resources Water Quality Permitting Regional Staff Report FORM: APSRSR 04-10 Page 1 of 4 December 18, 2020 To: DWR Water Quality Permitting Section Central Office Application No.: WQ0020493 Attn: Poonam Giri Regional Login No.: From: Mikal Willmer Asheville Regional Office I. GENERAL SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or No a. Date of site visit: 12/08/2020 b. Site visit conducted by: Mikal Willmer c. Inspection report attached? Yes or No In LF d. Person contacted: David Evans, Environmental Safety Manager and their contact information: (828) 755- 5025 e. Driving directions: From Rutherfordton, take Hwy. 64 east to Parton Lumber on the right, just before crossing the Second Broad River. II. PROPOSED FACILITIES FOR NEW AND MODIFICATION APPLICATIONS 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? Yes No N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? Yes No N/A If no, please explain: 5. Is the proposed residuals management plan adequate? Yes No N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? Yes No N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? Yes No N/A If yes, attach list of sites with restrictions (Certification B) DocuSign Envelope ID: CE31BFC6-7D5C-4169-A571-F078B1043D71 FORM: APSRSR 04-10 Page 2 of 4 III. EXISTING FACILITIES FOR MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? Yes or No If no, please explain: 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? Yes or No N/A If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? Yes or No If yes, please explain: 5. Is the residuals management plan adequate? Yes or No N/A If no, please explain: Solids from the sediment trap are mixed with mulch onsite 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No N/A If no, please explain: 7. Is the existing groundwater monitoring program adequate? Yes No N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? Yes or No If no, please explain: 10. Were monitoring wells properly constructed and located? Yes No N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? Yes No N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ ○ ′ ″ - ○ ′ ″ 12. Has a review of all self-monitoring data been conducted (e.g., NDMR, NDAR, GW)? Yes or No Please summarize any findings resulting from this review: 2016 data was reviewed. There are no permit limits; however, annual monitoring data were not available for 2017, 2018 and 2019. Please see inspection report for additional details. 13. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No If yes, please explain: Facility historically had issues with leaks from the wet-deck piping due to freezing in the off-season. Staff have begun running the system more often in the wintertime to reduce the chance of breaks. Mr. Evans reports they have not had issues with breaks since the operational adjustment. 14. Check all that apply: No compliance issues Current enforcement action(s) Currently under JOC Notice(s) of violation Currently under SOC Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) Inspection NOV for failure to monitor required parameters. See inspection report in LF. DocuSign Envelope ID: CE31BFC6-7D5C-4169-A571-F078B1043D71 FORM: APSRSR 04-10 Page 3 of 4 15. Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A If no, please explain: 16. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? Yes No N/A If yes, please explain: IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? Yes or No If yes, please explain: 2. List any items that you would like Non-Discharge Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: Hold, pending receipt and review of additional information by regional office Hold, pending review of draft permit by regional office Issue upon receipt of needed additional information Issue Deny (Please state reasons: ) 6. Signature of report preparer: Signature of WQROS regional supervisor: Date: V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS The permit requires annual monitoring and submittal of the monitoring results but BIMS is still not setup to receive data for this Permit. As noted in previous inspections, the pond is unlined. The historic file indicates the Groundwater Section requested a requirement for a liner when Parton applied for a recycle permit; however, it appears this requirement never made it into the permit compliance schedule in 2002. Monitoring wells have not been requested by the ARO. The ARO in 2002 recommended effluent monitoring to monitor levels of known contaminants from wet-decking operations. Annual phenol levels in the pond have fluctuated above and below the 02L standard. Pond effluent results from 2016 were below 02L standards for TDS & Chloride. Phenol was 16 µg/L above the 02L standard. The ARO will begin splitting samples again with Parton in 2021. DocuSign Envelope ID: CE31BFC6-7D5C-4169-A571-F078B1043D71 12/18/2020 FORM: APSRSR 04-10 Page 4 of 4 Based on the 2016 results, it appears the oxygen demand of the wastewater would have the most direct acute impact on the adjacent UT, should the pond overtop the berm or significant exfiltration occur. Upstream and downstream samples of the adjacent UT will be collected by DWR to determine if additional monitoring requirements should be added to the permit in future renewals. In 2013, during the pond modification, only the height of the dam was increased. Currently Parton supplements the wet-decking recycle pond with fresh-water. It should also be noted, due to the location of the facility and the recycle pond in a low lying natural drainage area (bracketed by a UT and the Second Broad River), this area may be susceptible to flood waters during significant storm events. DocuSign Envelope ID: CE31BFC6-7D5C-4169-A571-F078B1043D71 Certificate Of Completion Envelope Id: CE31BFC67D5C4169A571F078B1043D71 Status: Completed Subject: Please DocuSign: WQ0020493_STFRPT_20201214.docx Source Envelope: Document Pages: 4 Signatures: 2 Envelope Originator: Certificate Pages: 2 Initials: 0 Mikal Willmer AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-05:00) Eastern Time (US & Canada) 217 W. Jones Street Raleigh, NC 27699 Mikal.willmer@ncdenr.gov IP Address: 149.168.204.10 Record Tracking Status: Original Dec 18, 2020 | 08:39 Holder: Mikal Willmer Mikal.willmer@ncdenr.gov Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: North Carolina Department of Environmental Quality Location: DocuSign Signer Events Signature Timestamp Mikal Willmer mikal.willmer@ncdenr.gov Environmental Specialist North Carolina Department of Environmental Quality Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 149.168.204.10 Sent: Dec 18, 2020 | 08:41 Viewed: Dec 18, 2020 | 08:41 Signed: Dec 18, 2020 | 08:41 Electronic Record and Signature Disclosure: Not Offered via DocuSign G. Landon Davidson landon.davidson@ncdenr.gov Asheville Regional Office, Regional Supervisor DEQ, Division of Water Resources, Water Quality Regional Operatoins Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 149.168.204.10 Sent: Dec 18, 2020 | 08:41 Viewed: Dec 18, 2020 | 08:42 Signed: Dec 18, 2020 | 08:44 Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted Dec 18, 2020 | 08:41 Certified Delivered Security Checked Dec 18, 2020 | 08:42 Signing Complete Security Checked Dec 18, 2020 | 08:44 Completed Security Checked Dec 18, 2020 | 08:44 Payment Events Status Timestamps