Loading...
HomeMy WebLinkAboutNCS000446_Storm Drain Inspections_20201218APS.,- `. "" PUBLIC WORKS&TRANSPORTATION DEPARTMENT Z 'y C A� STORM DRAIN INSPECTIONS 1.0 INTRODUCTION The purpose of this SOP to establish the policies and procedures related to inspections performed on the storm drain infrastructure with in the Town of Apex and to identify who the responsible party is for the execution and documentation of said policies and procedures. 2.0 SCOPE The Public Works and Transportation Operations Department will oversee and maintain the program for inspecting and collection of data. The Streets Maintenance Division will inspect, report, and perform minor maintenance to Town catch basins and flared end sections. Inspections, minor maintenance, work programming and data collection will be captured utilizing Cityworks. 3.0 ASSOCIATED DOCUMENTS • Town of Apex Storm Drain Maintenance Program July 2013 4.0 GUIDELINES 4.1 LIST OF APPROVED POSITIONS RESPONSIBLE FOR: Stormwater & Utility Engineering Manager Public Works Operations Manager Streets Maintenance Supervisor 4.2 PROCEDURES Utilizing Cityworks, the Street Maintenance Supervisor and Cityworks Administrator will determine which curb inlets and flared end sections are to be inspected. A minimum of 10% of the town assets will be identified within the calendar year. The responsible parties will create the "Inspections" and the Street Maintenance Supervisor will assign the inspections to the Maintenance Workers. TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 1 (919) 249-3400 1 www.apexnc.org 4W PQ�k PUBLIC WORKS&TRANSPORTATION DEPARTMENT 11T3 p-p�,'''T'. Ov C A- Upon assignment the Street Maintenance Workers will utilize the Cityworks Application on their town issued mobile device and go to each curb inlet/FES and complete the Inspection. The following are the necessary steps to be taken by the Streets Maintenance workers during curb inlet inspections. ✓ Clear grate/gutter of any debris ✓ Determine grate condition (serviceable or unserviceable) ✓ Visually inspect down into box. ✓ Determine if there is debris present (choices = none, minor amount, major amount, or totally blocked) ✓ Take a picture of inside of box and attach to 'Inspection' before marking it'Complete'. ✓ Maintenance Workers will complete 'Inspections' until the quota has been met. The following are the necessary steps to be taken by the Streets Maintenance workers during flared end inspections. ✓ Check overall condition —Good, minor work, major work ✓ Check for blockage to include rocks, dirt, bushes, trees etc. ✓ Check for wash out ✓ Check for visible pipe separation 4.3 AUDITS An annual audit may be performed by the Environmental Protection Agency. An audit could inspect the overall program to include a complete review of the data collected by field crews. Upon request, on an annual basis, a report will be generated from Cityworks and delivered to the Town of Apex Stormwater & Utility Engineering Manager for filing. TOWN oE., APEX The Peak of Good Living PO Box 25o Apex, NC 27502 j (919) 249-3400 1 w%vw.apexnc.org W PPEX PUBLIC WORKS & TRANSPORTATION DEPARTMENT cA� 5.0 NON-COMPLIANCE Failure to comply with this SOP could result in formal warnings. 6.0 RESPONSIBILITY FOR THIS SOP 7.0 APPROVAL Director of Public Works and Transportation 8.0 DOCUMENT MErTADATA / APPLICABILITY Selected items identify the project(s) and department(s) that this SOP applies to: 9.0 APPENDICES NONE TOWN of APEX The Peak of Good Living PO Box ago Apex, NC 27502 1 (919) 249-3400 1 wtivw.apexnc.org