HomeMy WebLinkAboutNCS000446_E&SC Inspection Report_20201218a Erosion and Sediment Control Site Ynspect ion_R�olt _ Project Name: Smith Farms Phase 3 Inspected: Entire Project Permittee: Adams Patrick Lennar Patrick.Adams@Lennar.com Jurisdiction Inspector: Inspection Completed: Report Completed: Inspection weather: Inspection Type: Current Activity: Current Site Status: Report Generated: 09-09-20 324pm Town of Apex Jimmy McClure 09-09-2020 01:50 pm 09-09-2020 01:50 pm Temperature: 78 degrees, Gaudy Compliance Inspection Active Site; Out of Compliance - Deficiencies Exist Deadline/Date for Repairs: 9/17/2020 HO FO 00,07 . III 1) Do conditions exist that prevent inspection at this time? No 2) Are all required SWPPP/NCG01 inspection and monitoring records on- Yes site or available for review? 3) Are construction entrances installed and maintained, as required? Yes 4) Are roads, gutter pans and paved areas free of excessive sediment? Open Work items Exist Maintenance Action Required- Noted 09/09/2020 Continue removing sediment from the pavement and gutter pan in front of basin 6 and along milk bottle alley. Photo 1: Continue removing sediment from the pavement and gutter pan in front of basin 6 and along milk bottle alley. Smith Farms Phase 3 inspected on 09-09-20 1:50pm Page 1 of 6 26100 4 Erosion and Sediment Control Site Inspection Report Report Generated: 09-09-20 324pm 5) Are silt fence and perimeter controls installed and maintained, as Open Work Items Exist required? r i� Maintenance Action Required- Noted 09/09/2020 Remove sediment and refresh stone at silt fence outlets on inside of wishing well near basin 6. Photo 1: Remove sediment and refresh stone at silt fence outlets on inside of wishing well near basin 6. Maintenance Action Required- Noted 09/09/2020 Numerous locations in phase 3A perimeter measures are overwhelmed or damaged including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found in the buffer that is greater than .25 inches should be removed with hand tools and covered with natural duff. E Photo 1: Numerous locations in phase 3A perimeter measures are overwhelmed or damaged including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found in the buffer that is greater than .25 Inches should be removed with hand tools and covered with natural duff. Smith Farms Ph 9e 3 inspected on 09-09-20 1:50pm Page 2 of 6 261C-D t , a Erosion and Sediment Control Site Inspection Report Report Generated; 09-09-20 3;24pm Photo 2: Numerous locations in phase 3A perimeter measures are overwhelmed or damaged including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found In the buffer that is greater than .25 inches should be removed with hand tools and covered with natural duff. Photo 3: Numerous locations in phase 3A perimeter measures are overwhelmed or damaged Including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found In the buffer that is greater than .25 Inches should be removed with hand tools and covered with natural duff. Smith Farms Phase 3 inspected on 09-09-20 1:50prn page 3 of 6 26100 Erosion and Sediment Control Site Inspection Report Report Generated: 09-09-20 3,24pm _ Photo 4: Numerous locations In phase 3A perimeter measures are overwhelmed or damaged including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found In the buffer that is greater than .25 inches should be removed with hand tools and covered with natural duff. Photo 5: Numerous locations in phase 3A perimeter measures are overwhelmed or damaged including rear of lot 140, both sides of basin 6, behind the temp basin and behind the concrete wash area. Repair all areas. Any sediment found in the buffer that is greater than .25 inches should be removed with hand tools and covered with natural duff. Maintenance Action Required- Noted 09/09/2020 Pull back sediment from overwhelmed silt fence on early planting below the construction trailer. Smith Farms Phase 3 Inspected on 09-09-20 1:50pm Page 4 of 6 26100 6) Erosion and Sediment Control Site Inspection Report Report Generated. 09-09-20 3 24pm Photo 1: Pull back sediment from overwhelmed silt fence on early planting below the construction trailer. Are inlet and catch basin protections installed and maintained, as required? 7) Are sediment basins (including outlet structures, skimmer, baffles, etc.) installed and maintained as required and functioning correctly? 8) Are diversion ditches and slope drains installed and maintained as required and functioning correctly? 9) Are trash, debris and solid wastes managed, as required? 10) Are concrete washouts located, installed and maintained, if required? 11) Are disturbed areas (e.g. slopes, stockpiles, inactive areas) stabilized and maintained, as required? 12) Are natural resource areas (e.g. streams, wetlands, riparian buffers, green spaces/RCA, etc.) free of adverse impacts and protected as required? 13) Does the site comply with dust control best management practices? 14) Are discharge points and receiving waters free of evidence of sediment deposits? 15) Are other/non-classified BMPs (if any) installed and maintained as required? 16) Is the site in compliance with the maximum disturbed area limit? Smith Farms Phase 3 Inspected on 09-09-.20 1:50pm 26100 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 5 of 6 Erosion and Sediment Control Site Inspection Report 17) General Notes & Observations Notes Recorded: Previous deficiencies have been repaired. 18) Is a Notice of Violation warranted at this time? 19) Is withholding of permits recommended as a result of this inspection? 20) Can the project be closed out with regard Soil and Erosion Requirements (permanent stability achieved, all temporary measures removed)? 21) Have you entered the Deadline for Compliance? Notes Recorded: 9/17/2020 Inspected bv: �N\ Jimmy McClure Environmental Technician Town of Apex Water Resources Jimmy.McClure@apexnc.org _ Re ort Generated- 09-09-20 3:24pm See notes No No No Yes AIL RE TO COMELY UVTii'rHE TOWN of APEX'S EFtOSDN AND SEDIMENT CO 11 NS I IJNISHIOLE WITH THE IMPOSITION OF STOP WORK ORDERS, NOTICE CIF VIOLATIONS, CIVILL ENALTIES, AND OTHEV CORRECTIVE ACTIONS. WE ENCOURAGE YOU TO CONTACT 71KF TOWN S& ERSDNNEL WITH ANY UESTIONS OR CONCERNS REGARDING YOUR REPORTi Smith Farms Phase 3 Inspected on 09-09-20 1:50pm Page 6 of 6 26100