Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5190701_D - Revised Pg1 Minor Modification Form & Attachment_20201217
DEMLR USE ONLY Date Received Fee Paid Permit Number I01IRIM "'I"'IIf;;;:IIR Ilf�llf;;;:IIRIMIII"'1"""'lII'°IIIIN IIf°°' IIRIM " M111NOIR MODIFICA noIN Standard Permitting Program — No Fee for Minor Modification Express Permitting Program — See IF plr IF Schedull Only complete applications packages will be accepted and reviewed. This form and the required items (with original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: afitp.// g q: g�✓/gc�fat qt/f g o at -offices, This form is to only to be used by the current permittee to notify the Division of a minor modification. Pursuant to .e I5 ...N.CAC 021 1, 1002a minor modification is a change to the project that. ............................................................................ 1) does not increase the net built -upon area; and/or 2) does not change the size or design of the SCM(s). A„ GIENIBRAII,,,.IINFORIMATII N 1. State Stormwater Permit Number: SW5190701 2. Current Permit Holder's Company Name/Organization: After School, LLC 3. Signing Official's Name: Richard Angino 4. Signing Official's Title: Owner 5. Mailing Address: 463'/ Carolina Circle City: Winston Salem State: NC ZIP: 27104 6. Street Address (if different): City: State: ZIP: 7. Phone: (336) 499-1963 Email: team thirdwavehousing.com 8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach additional pages or supporting tables similar to Section 1 V.10 of the original application, if needed): The original proposed stormwater system was for 2 underground storage (UGS) in two locations. The modification to the plans includes combining the UGS systems to 1 system at one of the original locations. These UGS systems were required to meet local quantity requirements and the drainage area, location or design relative to the state approved Filterra has not been modified. It should noted that upon reviewing the sizing calculations, The Filterra Reviewers opted to provide an alternate size Filterra than the one we had originally specified based on their review of our design and impervious surface ratio. See attached Emails for documentation of this. IE„ SUIBIMITTAII,,,.REQUIREMENTS Please mark "Y' to confirm the items are included with this form. Please mark 'X' if previously provided. If not applicable or not available, please mark N/A.: Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form. Y 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the originally approved plan sheets). N/A 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective covenants OR the proposed recorded deed restrictions and protective covenants documenting the changes and a signed agreement to provide the final recorded document. N/A 4. If applicable, the appropriate Express review fee. Stormwater F:'ermit I::arm 7: IMinor (Modification F:'age 1 of 2 wJUly 14, 2017 Chad Abbott From: Sutton, Rahn <RSutton@conteches.com> Sent: Wednesday, January 8, 2020 3:57 PM To: Chad Abbott Subject: Siler Square Project - Filterra Sizing Attachments: Siler School Square Filterra Sizing 1-2-20.pdf Chad, I was asked to send this to you verifying the Filterra sizing is per the MDC ratios for media surface area to drainage area. The charts in the MDC are based on 100% impervious drainage areas. All that the attached spreadsheet does is weight the C factor accordingly to determine the correct sizing. We used the info below per your 12/30/19 email: • Proposed Drainage area to the FILTERRA = +/-17,526 (0.40 acres) (MAP ATTACHED) 0 12,302 sf (0.28 acres) impervious areas 0 4,954 sf (0.113 acres) pervious/landscaped areas I'll give you a call shortly to confirm you got this and to see if you have any questions. Thanks, 1"1T1 L. Rahn Sutton, P.E. 'iiidtorm mvateviCosw leantCm'onas Contech Engineered Solutions, LLC aml 6g11, 1114nw 27606 DIIIId d:A19,948,77113 Ceflk 919,889,0878 rsutton@conteches.com ,Contea hIF:.coirmn ......................................................................................................................... This email may contain confidential and/or privileged information. If you are not the intended recipient, you are hereby notified that retention, dissemination, or copying of this communication is prohibited. If you have received this email in error, please notify the sender by reply email and permanently delete this email and any attachments. Thank you. 1 Design Engineer: Date Site Information Project Name Project State Project Location Drainage Area, Ad Impervious Area, Ai Impervious Runoff Coefficient, Ci Pervious Area, Ap Pervious Area Runoff Coefficient, Cp % Impervious Weighted Runoff Coefficient, Cw Filterra Sizing Calculations Filter Surface Area / Drainage Area Ratio Required Filterra Media Surface Area, Filterra System Filterra Configuration Filterra Model ID Filterra Sizing in North Carolina JMR Blue Cells = Input 11212020 Black Cells = Calculation Siler School Square North Carolina Siler City 0.40 ac 0.28 ac 0.90 0.12 0.30 70% 0.72 0.39% Per NCDEQ Manual, Chapter D.3, Table 1 55 ft2 Offline FT 6x10 1 10x6 ©2019 Contech Engineered Solutions ContechES.com 1 of 1