Loading...
HomeMy WebLinkAboutSW6201101_Military Working Dog SuppEZ-2018-Version-2.1.1-2-_20201217SUPPLEMENT-EZ COVER PAGE FORMS LOADED :CT INFORMATION Project Name Project Area (ac) Coastal Wetland Area (ac; Surface Water Area (ac) Is this project High or Low Does this oroiect use an o MWD 6.5 COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 1 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 Storn-Filter 0 24 Silva Cell 0 25 1 Bayfilter 0 26 IFilterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Dan Saltsman, P.E., Project Manager 28 Organization: Stantec Consulting Services 29 Street address: 801 Jones Franklin Rd, ste. 300 30 City, State, Zip: Raleigh, NC 27606 31 Phone number(s): 919-532-2331 32 Email: dan.saltsman@stantec.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CARO/ / //,. �0 oFEss/o�.� � :�. ; SEAL 44924 = Se / \\ Date 12/17/2020 DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 4 Type of SCM NA INFILTRATION BASIN 5 Total BUA in project (sq ft) 81862 sf 91731 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) 7 New BUA outside of subdivided lots (subject to permitting) (so 61544 sf 44391 sf 8 JOffsite - total area (sq ft) 96740 sf 9 Offsite BUA (sq ft) 44075 sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft) 7035 sf 7035 sf Sidewalk (sq ft) 4061 sf 4061 sf Roof (sq ft) 16700 sf 16700 sf Roadway (sq ft) 33748 sf 16595 sf Future (sq ft) Other, please specify in the comment box below (sq ft) 11 New infiltrating permeable pavement on subdivided lots (sq ft) 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) 20318 sf 3265 sf 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 12267 sf 3750 sf 16 Percent BUA 33% 17 Design storm (inches) 1 in 18 Design volume of SCM (cu ft) 8187 cf a7796 19 Calculation method or design volume SIMPLE ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): The entire site BUA is based on the entire Limit of Disturbance (LOD) due to being located on a military installation, no lot lines or parcels. The LOD is = 6.5 acres. The actual drainage areas to the SCM (also summarized in the calculations package) is 5.05 acres. DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: Parking (sq ft) Sidewalk (sq ft) Roof (sq ft) Roadway (sq ft) Future (sq ft) Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement outside of subdivided lots (sq ft) 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 19 1 Design volume of SCM (cu ft) 20 Jualculation method or cEsign volume ADDITIONAL INFORMATION 21 Please use this space to provide any additional information about the drainage area(s): INFILTRATION SYSTEM 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation (fmsl) 253.60 23 Depth to SHWT per soils report (in) 95.00 24 Ground elevation at boring in soils report (fmsl) 261.50 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? 26 Soil infiltration rate (in/hr) 0.74 27 Factor of safety (FS) (2 is recommended): 2.00 lElevations 29 Bottom elevation (fmsl) 257 ft 30 Storage elevation (fmsl) 258.16 ft 31 Bypass elevation (fmsl) 258 ft Infiltration 4 9:52 AM 12/17/2020