Loading...
HomeMy WebLinkAboutNCC191171_Annual Fee NOD Letter_20201218ROY COOPER cm MICHAEL S. REGAIN Serrilary BRIAN WRENN opme G1' BOMA North Carolina, LLC Attn: Debbie Joyce 1110-A Dover Road Greensboro, NC 27408 d. . NORTH CAROLINA EnOr inerdal Quality Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. NCC191171-2020 Dear Permittee: You are receiving a Notice of Deficiency for failure to pay the annual permit fee per the requirements of N.C. General Statute 143-215.3D(a)(4). You are receiving this notice because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid. The annual fee was billed on 11/3/2020 and was due on 12/3/2020. The annual permit fee applies to the following construction site: Amenities Center, Phase 1 Teague Lane, Kernersville, NC Forsyth County Certificate of Coverage No. NCC191171 If the project was closed out prior to the invoice date, you must submit a Notice of Termination on-line, and DEQ will determine if waiving the fee is appropriate. Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. Should you have any questions or concerns, please contact Aziza Selkane at (919) 707-3710 or me at (919) 707-3639. Thank you for your attention to this matter. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources NC Reference No. NCG01-2019-1171 Nun Carolina Qeparl menergy t of EnAmnmenral Qpalliy I BIvlslnn of En, Mnera ll and Land Resources Sit Nanh SalleburyStreet 1 1612Mall ServkeUnter I Ralelgh Nanh Carolina 27699-1612 914-707-9290