Loading...
HomeMy WebLinkAboutNCC191061_Annual Fee NOD Letter_20201218ROY COOPER cm MICHAEL S. REGAIN Serrilary BRIAN WRENN opme G1' Mattamy Carolina Corporation Attn: Brian Johnson 2025 Ayrsley Town Blvd. Charlotte, NC 28273 d. . NORTH CAROLINA EnOr inerdal Quality Subject: Notice of Deficiency- Failure to Pay Annual Fee Invoice No. NCC191061-2020 Dear Permittee: You are receiving a Notice of Deficiency for failure to pay the annual permit fee per the requirements of N.C. General Statute 143-215.3D(a)(4). You are receiving this notice because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCGO10000 for Construction Activities has not been paid. The annual fee was billed on 11/3/2020 and was due on 12/3/2020. The annual permit fee applies to the following construction site: Cheyney - Temporary Construction Access 10230 Arthur Davis Rd., City of Charlotte, NC Mecklenburg County Certificate of Coverage No. NCC191061 If the project was closed out prior to the invoice date, you must submit a Notice of Termination on-line, and DEQ will determine if waiving the fee is appropriate. Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. Should you have any questions or concerns, please contact Aziza Selkane at (919) 707-3710 or me at (919) 707-3639. Thank you for your attention to this matter. Sincerely, Annette Lucas Stormwater Program Supervisor Division of Energy, Mineral, and Land Resources NC Reference No. NCG01-2019-1061 Nun Carolina Qeparl menergy t of EnAmnmenral Qpalliy I BIvlslnn of En, Mnera ll and Land Resources Sit Nanh SalleburyStreet 1 1612Mall ServkeUnter I Ralelgh Nanh Carolina 27699-1612 914-707-9290