Loading...
HomeMy WebLinkAbout20120296_Information Letter_201010044 c CONCURRENCE MEETING INFORMATION PACKET FOR YOUR REVIEW PRIOR TO MEETING ON Tuesday October 19., 2010 PROJECT ENGINEER Olivia Farr TIP #R-2507A Please bring this packet Q12@19owl to the meeting. OCT - 4 2010 ?y nARe G . STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION -BEVERLY EAVES PERDUE GOVERNOR AGENDA Eastern Concurrence Meeting Tuesday, October 19, 2010 Board Room, Transportation Building Raleigh, North Carolina EUGENE A. CONTI, JR SECRETARY 10:30 AM to 12:00 PM, Olivia Farr, Project Planning Engineer, PDEA Branch TIP No. R-2507A, Widening of US 13-158 from US 158 near Winton in Hertford County to US 158 in Tarheel in Gates County, Hertford & Gates Counties, Division 1 Team Members: Bill Biddlecome, USACE Olivia Farr, PDEA Chris Militscher, EPA Gary Jordan, FWS Ron Sechler, NMF Travis Wilson, WRC Cathy Brittingham, DCM David Wainwright, DWQ Renee Gledhill-Earley, SHPO Sara Winslow, DMF NCDOT Technical Support Staff and Other Agency Staff: Jerry Jennings, Division 1 Bob Capehart, Division 1 Clay Willis, Div. 1 EO James Speer, Roadway Design John Lansford, Roadway Design Jay Twisdale, Hydraulics Norman Bullock, Structure Design Keith Paschal, Structure Design Chris Rivenbark, NEU Elizabeth Lusk, NEU Amy James, NEU Mary Pope Furr, HEU Jay McInnis, PDEA Rob Hanson, PDEA Ann Whitley, Peanut Belt RPO (non- signatory) Steven Lambert, Albemarle Belt RPO * The purpose of this meeting is to reach concurrence on CP 3 MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1548 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE: WWW.NCDOT.GOV LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC CONCURRENCE POINTS 3/4A LEAST ENVIRONMENTALLY DAMAGING. PRACTICABLE ALTERNATIVE (LEDPA)/AVOIDANCE & MINIMIZATION US 13/158 From US 158 from Near Winton to US 158 in Tarheel Hertford Gates Counties D f7 r TIP Project R-2507A l:f U October 19, 2010 PURPOSE OF TODAY'S MEETING The purpose of today's meeting is to discuss the preferred alternative for the project. Impacts of and public comments on the alternative presented at the design public hearing will be discussed. Concurrence on the LEDPA (Concurrence Point 3) and Avoidance and Minimization (Concurrence Point 4A) will be requested. PROJECT DESCRIPTION TIP Project R-2507A is included in the 2011-2020 Transportation Improvement Program (TIP). The project involves widening US 13-158 to a multi-lane facility from US 158 near Winton in Hertford County to US 158 in Tarheel in Gates County, a distance of approximately five miles (see the attached vicinity map). It is anticipated approximately 200 feet of right of way will be required for the project. Partial control of access will be obtained. All intersecting roadways will cross at-grade; with one exception, The exception is construction of an interchange at the intersection of US 13 and US 158/NC 45 north of Winton PROJECT PURPOSE AND NEED The purpose of the project is to reduce traffic congestion and improve travel time and safety along US 13-158 in the project area. PROJECT STATUS /SCHEDULE The last merger team meeting for the project was held March 18, 2009. The merger team concurred on Concurrence Point 2A (Bridging Decisions). Currently, one alternative is under consideration. The state Environmental Assessment for the project was completed in January 2010. One alternative was presented the public at the Design Public Hearing held on August 19, 2010 in the Hertford County Commissioners Chambers in Winton. The final environmental document is scheduled to be completed in December 2010. Right of way acquisition and construction are scheduled for May 2011 as a design build project. STUDIED/RECOMMENDED ALTERNATIVES The proposed project was been divided into eight sections. The merger team concurred on February 21, 2008 on east or west side widening for the sections. F ti. „•:,:j Team memliers concurred on the following bridge lengths: Chowan River - Length of the proposed bridge should be the same as the existing (1,121 feet). Buckhorn Creek - Dual 110 foot bridges CORRIDOR PUBLIC HEARING The Corridor Public Hearing for the project was held August 19, 2010 in the Hertford County Commissioner's Meeting Room at the Herford County Office Building in Winton. Approximately 140 citizens attended the workshop. There was one alternative presented at the hearing. Several citizens at the hearing expressed opposition to the project. One concern was that the super street design would not be safe. Another concern was that the response time for the fire and rescue department would increase. Several people were concerned about the impact to the houses and businesses. AVOIDANCE AND MINIMIZATION In order to minimize impacts to the Story Historic District the right of way will be narrowed from 200' to 150' in the area of the buildings. Section 404 Avoidance and Minimization Measures In an effort to avoid and minimize impacts to jurisdictional wetlands and streams associated with the LEDPA, NCDOT proposes to implement the following measures: Steeper side slopes (3:1) will be used in jurisdictional areas. The median width in Section 1 was reduced from 46' to 30' at the Chowan River structure. The impact to the wetlands was not reduced on the south side and was reduced by 0.4 acre on the north side by narrowing the median width. T '7 N? I ,s t I END PROJECT V 158 High BEGIN PROJECT 158 13 DNISION OF HGHMn US 13 US 13.158 WIDENING 0 0.5 1 2 nQ GATES AND HERTFORD COUNTIES v TIP PROJECT R 2507A Miles FIGURE 1 R-2507A CP3/4A JURISDICTIONAL WETLAND CLASSIFICATION Wetland Riverine/Non- Riverine NWI* Class Wetland Rating Section Impact WNEla Non-Riverine PF02B 18 l 1.92 ac WNElb Non-Riverine PEM1A 18 1 0.02 ac WSEla Non-Riverine PF01B 19 WSElb Riverine PFO1C 53 WNE1 Riverine PFO1C 69 1 6.50 ac WSE1 Riverine PFO1C 69 1 0.34 ac WSElc Non-Riverine PFOIA/PEM1F 18 WSEld Non-Riverine PFOIA/PEMIF 22 1 0.06 ac WSEle Non-Riverine PFOIA 18 WNE2a Non-Riverine PF01A 18 1 0.16 ac WNE2 Riverine PF06F 30 1 5.05 ac WSE2 Riverine PF06F 30 1 2.63 ac WSE3a Non-Riverine PF01/4A 18 2 0.02 ac WSE3c Non-Riverine PF01/4A 18 2 1.01 ac WSE3d Non-Riverine PFOIA 18 2 0.21 ac WSE3e Non-Riverine PF01A 18 2 1.87 ac WSE3f Non-Riverine PF01/4A 18 2 0.68 ac WNE3a Non-Riverine PF01/4A 18 2 0.52 ac WNE3b Non-Riverine PF06F 24 2 0.02 ac WNE3c Non-Riverine PF06F 24 2 0.51 ac WNE3d Non-Riverine PF01F 24 2 0.22 ac WB Riverine PF06C 55 2 1.19 ac WBb Non-Riverine PEM2B 18 2 0.15 ac WNE4 Riverine PF01/4C 22 3 0.59 ac WSE4 Riverine PFO1C 22 3 0.17 ac WNE5 Riverine PF06C 22 3 1.61 ac WSE5a Non-Riverine PF01/4A 18 3 0.10 ac WNE6 Riverine PSS1C 20 4 2.71 ac WSE6 Non-Riverine PF01/4C 16 4 0.61 ac WSE6a Non-Riverine PF01/4C 16 WSE6b Non-Riverine PSS1C 20 4 1.15 ac /6.6 Vat'` G Pf«r? Wetland Riverine[Non- Riverine NWI* Class Wetland Rating Section Impact WNE7 Non-Riverine PFO1F 22 WSE7 Non-Riverine PFOIA 18 6 0.30 ac WNE8 Riverine PFOIA 46 8 0.26 ac WNE9 Non-Riverine PF01/4F 22 STREAMS WITHIN THE PROJECT AREA Stream Intermittent/Perennial Status Stream Order Coverage (linear feet) S-1 Perennial/Impacted Zero 770 Chowan River Perennial 3`d or higher 500 Buckhorn Creek Perennial 2nd 400 S-2 Perennial 1St 279 Y ?`r r C ?wpti ,,. 2 Kl.? 1 . . X? . ,-, ? +Y+??. • Icy/P„ . q, LK? C .?,!?l?k? Y 7t #6L? r x ?. ly R p # ? r,?y `` '? t ? r . ?' v?r "' f s? G1P' .+;N l?'? P°+? +` ?' ?? ?, ?• adlni y '?' i? C a1 f y. 1 ? y T. .1? T ? 1T?i. S_ I. ? P xY ? , .. .* Y f sor f CORNER ?7? x r 14 • ?I ?I y IA.fjt X^ 1 x ,. ,f ! 1 L' ? S I NWU O m I?`r . A ?` 0 Z ? I ` yw[ iC U .III •'?' ?'+:P' ?' f•: ` 1 V1 ?? DO ? JAY ?? -?J w QM F$ zm n n ?z 70} ;z ?•T`?'i. 1 1 ? I r ' '1, ti h 6; y Pik E ` x Tl 0104 it R firm :d' Nix