Loading...
HomeMy WebLinkAbout20200186 Ver 2_Stormwater Letter Of Approval_20200215Apple Creek Corporate ParkProject Name Date: Location Submitted By Date Received: Watershed New Submittal Revision Sincerely, Gaston County Stormwater Control Program Responsible Party Address City, State, Zip Stormwater Administrator Gaston County Soil Erosion and Sedimentation Control Program RE: Letter Of Approval Joseph D. Alm Gaston Natural Resources Department Stormwater Control GASTON COUNTY 04/29/2020 Applewood Road, NC-279, NC-275 Alfred Benesch & Company X Long Creek 04/09/20 Alfred Benesch & Company Gaston County P.O. Box 1578 Gastonia NC 28053 000000273 Telephone: 704-922-4181 Gaston Natural Resources Department 1303 Cherryville Hwy Dallas, NC 28034 Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Dellview Gastonia High Shoals Kings Mountain Lowell McAdenville Mount Holly Ranlo Spencer Mountain Stanley Mission Statement "To provide leadership and conservation assistance to the people of Gaston County to improve and sustain their soil, water, air, plant and wildlife resources." CC1: CC2: www.co.gaston.nc.us/ NaturalResources attn: Matthew Rhoten Gaston Natural Resources Department received a complete Stormwater Control Plan for the above project . Staff review of the plans and specifications determined that the project, as proposed, will comply with Gaston County's Stormwater Ordinance. The Gaston County Your Stormwater Permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein. Please pay special attention to your Operation and Maintenance requirements. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. Section 11, As-built Plans and Specifications, of the Stormwater Ordinance shall be validated at completion of the project. Note that a Certificate of Compliance or Occupancy will not be issued without as-built plans or certification of previously submitted plans. Be advised of the annual inspection report, maintenance agreement/restrictive covenant, and record easements for access, maintenance, and inspections required under Section 18, Assurance that Improvements will be Maintained, in Gaston County's Stormwater Ordinance. If any parts, requirements, or limitations contained in this permit are unacceptable, or you need additional information concerning this permit, please contact Gaston Natural Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this project. Stormwater Permit number, This approved plan shall become null and void if no progress is realized on-site within six months after the date of approval (Section 7.p). If any parts, requirements, or limitations contained in this permit are unacceptable, or you need additional information concerning this permit, please contact Gaston Natural Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this project. CONTACT: is approved.