HomeMy WebLinkAbout20200186 Ver 2_Stormwater Letter Of Approval_20200215Apple Creek Corporate ParkProject Name
Date:
Location
Submitted By
Date Received:
Watershed
New Submittal Revision
Sincerely,
Gaston County Stormwater Control Program
Responsible Party
Address
City, State, Zip
Stormwater Administrator
Gaston County
Soil Erosion and
Sedimentation Control
Program
RE: Letter Of Approval
Joseph D. Alm
Gaston Natural Resources Department
Stormwater Control
GASTON COUNTY
04/29/2020
Applewood Road, NC-279, NC-275
Alfred Benesch & Company
X
Long Creek
04/09/20
Alfred Benesch & Company
Gaston County
P.O. Box 1578
Gastonia NC 28053
000000273
Telephone: 704-922-4181
Gaston Natural
Resources Department
1303 Cherryville Hwy
Dallas, NC 28034
Gaston County
Belmont
Bessemer City
Cherryville
Cramerton
Dallas
Dellview
Gastonia
High Shoals
Kings Mountain
Lowell
McAdenville
Mount Holly
Ranlo
Spencer Mountain
Stanley
Mission Statement
"To provide leadership
and conservation
assistance to the
people of Gaston
County to improve and
sustain their soil,
water, air, plant and
wildlife resources."
CC1:
CC2:
www.co.gaston.nc.us/
NaturalResources
attn: Matthew Rhoten
Gaston Natural Resources Department received a complete Stormwater Control Plan for the above
project . Staff review of the plans and specifications determined that the project, as proposed, will
comply with Gaston County's Stormwater Ordinance. The Gaston County
Your Stormwater Permit shall be effective from the date of issuance and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to your Operation and
Maintenance requirements. Failure to establish an adequate system for operation and maintenance of
the stormwater management system will result in future compliance problems.
Section 11, As-built Plans and Specifications, of the Stormwater Ordinance shall be validated at
completion of the project. Note that a Certificate of Compliance or Occupancy will not be issued without
as-built plans or certification of previously submitted plans.
Be advised of the annual inspection report, maintenance agreement/restrictive covenant, and record
easements for access, maintenance, and inspections required under Section 18, Assurance that
Improvements will be Maintained, in Gaston County's Stormwater Ordinance.
If any parts, requirements, or limitations contained in this permit are unacceptable, or you need
additional information concerning this permit, please contact Gaston Natural Resources Stormwater
Division at (704) 922-4181. We look forward to working with you throughout this project.
Stormwater Permit number,
This approved plan shall become null and void if no progress is realized on-site within six months after the
date of approval (Section 7.p). If any parts, requirements, or limitations contained in this permit are
unacceptable, or you need additional information concerning this permit, please contact Gaston Natural
Resources Stormwater Division at (704) 922-4181. We look forward to working with you throughout this
project.
CONTACT:
is approved.