Loading...
HomeMy WebLinkAbout20200186 Ver 2_Covenants and Restrictions_20200215Apple Creek Corporate Park DG-1 EXHIBIT B DESIGN GUIDELINES FOR APPLE CREEK CORPORATE PARK GASTONIA, NORTH CAROLINA INTRODUCTION Pursuant to the Declaration to which these Design Guidelines (the "Guidelines") are attached, the Declarant and the Architectural Review Committee have adopted these Guidelines in connection with the planning and development of the Properties. These guidelines are designed to establish several ways and means of providing for the orderly and attractive development of the Properties that are intended to aid in the preserving and enhancing the value thereof. The Architectural Review Committee is the reviewing body that interprets proposals for Plans and compatibility of various Owners’ Plans with the overall general plan of development of the Properties. It is concerned with aesthetics, maintenance, and operational aspects of the Properties and it is the responsibility and purpose of the Architectural Review Committee (ARC) to administer the development criteria and procedures, including these guidelines. PURPOSE The primary objectives in establishing these Guidelines are: • To protect property values and enhance each Owner's investment by ensuring a well- planned and maintained development within the Properties; • To provide a harmonious relationship among all structures and other improvements located within the Properties; • To minimize disturbing influences on adjacent or neighboring properties; and • To contribute to a favorable environment for the Properties and the Owners or occupants of the Properties. These Guidelines are designed to be both general and specific so that a set of standards can be identified for each lot. Not with standing anything to the contrary, nothing contained in these guidelines shall take precedence over requirements imposed by federal, state, and local laws, ordinances, and regulations applicable to the Properties and the development thereof. Apple Creek Corporate Park DG-2 DESIGN GUIDELINES FOR APPLE CREEK CORPORATE PARK GASTONIA, NORTH CAROLINA The Design Guidelines for the Apple Creek Corporate Park have been established to implement the intent, purpose, and provisions of the Development Master Plan. These guidelines establish criteria for site planning, architectural design, landscape design, signing, and lighting. These guidelines will be used by the Architectural Review Committee (ARC) established by the CC&Rs to evaluate proposed developments. They are intended to provide uniform criteria by which each proposal may be evaluated. Apple Creek Corporate Park DG-3 DESIGN GUIDELINES / TABLE OF CONTENTS 1.0 Approvals and Submittals 1.1 Plan Review Process 1.2 Schematic Plan Submittal 1.3 Preliminary Plan Submittal 1.4 Construction Document Submittal 2.0 Site Planning Guidelines 2.1 Building Site Coverage 2.2 Interior Landscape Coverage 2.3 Building Heights 2.4 Street Setbacks 2.5 Side Property Line Setback 2.6 Rear Property Line Setback 2.7 Site Access and Traffic Flow 2.8 General Parking Requirements 2.9 Sidewalks 2.10 Grading and Drainage 2.11 Roadways 2.12 Storage, Service, and Loading Areas 2.13 Refuse Collection Areas 2.14 Screening of Exterior Mechanical Equipment 2.15 Screening of Exterior Electrical Equipment and Transformers 2.16 Fences and Walls 2.17 Utilities and Communication Devices 2.18 Mailboxes 3.0 Architectural Guidelines 3.1 Objectives 3.2 Site Planning Design 3.3 Building Exterior Wall Materials 3.4 Building Roofs 3.5 Color and Texture 4.0 Landscape and Irrigation Guidelines 4.1 Landscape Standards 4.2 Interior Landscape Coverage 4.3 Landscape Easements 4.4 Parking Lot Requirements 4.5 Areas Between Building Facades and Parking 4.6 Tree Save Zones 4.7 Street Trees 4.8 Irrigation 4.9 Installation and Maintenance within the Right-of-Way and Setback 4.10 General Maintenance Standards 4.11 Maintenance of Unimproved Sites 4.12 Plant Materials 4.13 Acceptable Plant Materials List 5.0 Signage Guidelines 5.1 Objectives 5.2 Submittal 5.3 General Standards 5.4 Prohibited Signs 6.0 Lighting Guidelines 6.1 Objectives 6.2 Submittal 6.3 General Standards DG-4 Apple Creek Corporate Park 1.0 APPROVALS AND SUBMITTALS 1.1 Plan Review Process In order to ensure that the design standards for Apple Creek Corporate Park contained in these guidelines are achieved, a series of plan submissions will be required at different stages of the design process. The number of plan submissions will vary depending upon the complexity and timing of a proposed development. Plan submissions will also be required for significant revisions, alterations, additions, or changes of use for approved or existing developments. All buildings shall be designed by an architect registered in the state of North Carolina and shall bear the license number and seal when submitted for design review. The plan submission for each new development and each significant revision, alteration, addition or change of use shall include the following: • PDF Digital Copy and • Four (4) sets of plans and specifications • Rendered architectural building elevations • Rendered site plan • Architectural review fee All submitted plans are viewed by the Architectural Review Committee for acceptability of design in compliance with the CC&R's and the Design Guidelines. Upon completion of review by the Architectural Review Committee, one set of submitted plans is to be returned to the applicant along with a letter summarizing comments, recommendations, requirements, and findings. The returned plans will be marked “Approved," "Approved Subject To Conditions," or "Not approved." 1. "Approved"- Approved documents permit the applicant to proceed to the next stage of the approval process. 2. "Approved Subject To Conditions" - Documents so marked permit the applicant to proceed to the next stage of the approval process, provided the applicant complies with the conditions specified by the Architectural Review Committee. If the applicant takes exception to the specified conditions, the applicant must do so in writing by certified mail within 15 days from the date of the applicant's receipt of the returned documents. Unless such action is taken, it is assumed that all conditions are acceptable to and approved by the applicant. 3. "Not approved"- These documents will be returned to the applicant with comments, describing the basis for disapproval. Revised documents must be resubmitted if approval is sought. 4. Architectural Review Committee approval of the applicant's plans and specifications shall not constitute an implication, representation, or certification by the Architectural Review Committee that the above items are in compliance with applicable statutes, codes, ordinances, or other regulations. The applicant shall have the sole responsibility for compliance with all applicable statutes, local codes and ordinances, or other regulations for all work performed on the premises by or on behalf of the applicant. 1.2 Schematic Plan Submittal The Schematic Plan submittal is required to give an indication of the site plan, architectural character, and extent of the proposed develop- ment. The schematic plan is to be submitted and approved before preliminary plans are submitted. Schematic plan submissions shall show an indication of: Apple Creek Corporate Park DG-5 1. All major buildings and structures including: a. Building floor plan b. Sketches or architectural design concept including intended character and materials c. Building coverage d. A brief description of the use of each building or structure including an estimate of the number of employees 2. Site plan including: a. Site layout b. Vehicular circulation c. Total parking provided d. Boundary survey e. Tree save areas and buffers f. Setbacks for building and parking 3. Loading and service areas: a. Truck service and loading dock areas b. Truck and service vehicle circulation areas c. Trash enclosure areas d. Location and configuration of screening devices for truck and service areas 4. Landscape and pedestrian circulation concept including any major site design features. 5. Interfaces with off-site circulation concept including the location and design of all curb cuts and driveways. 6. Interfaces with adjacent properties, conceptual grading, drainage, and utilities. 7. Phasing plan 1.3 Preliminary Plan Submittal The preliminary plan submission is required to convey specific information about the site plan and architectural design of the proposed development. The preliminary plan package should be submitted to the Architectural Review Committee prior to or concurrent with submission of plans to the Gaston County or City of Gastonia and other governing agencies. Preliminary plans are to be submitted and approved by the ARC before construction documents are submitted. The preliminary plan submission requires each of the following exhibits: 1. Site Plan indicating the following: a. Building footprints and dimensions b. Building roof overhangs c. Configuration of parking and vehicular circulation areas d. Location of parking lot lighting e. Truck service, loading area, trash enclosures f. Lines of setbacks and easements g. Locations of on-site transformers, electrical switch gear, etc. h. Adjacent roadways including curb lines, medians, and driveways. i. Development Data Tabulation of: • Parcel area • Total building floor area • Site coverage • Building coverage • Total parking provided • Total parking required • Number of employees • The anticipated number of shifts. j. Rendered site plan 2. Grading and Drainage Plan indicating: a. Existing and proposed grades b. Site drainage systems c. Grades of existing streets d. Stormwater detention facilities e. Roof drain locations 3. Landscape Plan indicating: a. Areas to be landscaped and irrigated b. List of proposed plant materials c. Walkways and paved areas d. Other landscape design features e. Existing and proposed utilities Apple Creek Corporate Park DG-6 4. Building elevations of all buildings indicating: a. Wall and roof materials, textures, and colors b. Location of signing and lighting c. Roof parapet heights above ground-floor line d. Architectural rendering of building elevations 5. Building Floor Plan 6. Building Roof Plans indicating: a. Roof elevations above finish floor b. Heights and locations of roof- mounted mechanical equipment and associated screening c. Roof materials and color 7. Outline specifications of all building materials 8. Site utility plan showing: a. Storm drainage system b. Site lighting c. Water and sewer lines d. Backflow prevention devices e. Fire line and fire hydrant(s) locations 9. Signage a. Type b. Locations c. Designs & materials d. Colors e. Illumination f. Typography 1.4 Construction Document Submittal All applicants are required to submit copies of the same construction documents to the Gaston County or City of Gastonia for approval in order to demonstrate the precise construction details for implementing the approved preliminary plans. The construction document submission to the Architectural Review Committee requires four sets of the following: 1. Final Comprehensive Site Plan 2. Final Grading and Drainage Plan 3. Architectural, structural, mechanical, plumbing, and electrical drawings 4. Construction Specifications 5. Complete Utility Plan 6. Final Landscape and Irrigation Plan 7. Building elevations of all walls 8. Color and finishes of all exterior walls 9. Final signage package 10. Color and type of all exposed roof materials. Apple Creek Corporate Park DG-7 2.0 SITE PLANNING GUIDELINES The following Site Planning Guidelines are established in order to ensure that The Apple Creek Corporate Park is developed as a high-quality corporate park. The Site Planning Guidelines are intended to implement the intent and purpose of The Apple Creek Corporate Park Master Plan. 2.1 Building Site Coverage The maximum building footprint coverage of all buildings, including accessory buildings but not including parking structures or surface parking, shall not exceed 50 percent of the gross lot area. The maximum site coverage by building, parking lot, and all site circulation shall be limited to 75 percent of the gross lot area, excluding public street. 2.2 Interior Landscape Coverage A minimum of at least 10 percent of the lot gross area shall be devoted to interior landscape planting. These areas shall consist of parking lot interior landscape islands, landscape planting around buildings, and tree save areas interior to the developed portion of the site, and five (5) feet strips parallel to the outside edge of the parking lot. Setbacks, buffers, and future development areas shall not be considered when determining the interior landscape requirements. (See exhibits). 2.3 Building Heights Structures up to 50 feet in height are permitted in accordance with the provisions of the plan. Structures may exceed 50 feet provided that a site development plan is first submitted by the applicant and approved by the Gaston County or Gastonia Planning Commission. 2.4 Street Setbacks 1. No building, parking, or other structures shall be permitted to be constructed closer than 50 feet from the right-of- way of The Applewood Road Parkway. 2. No building, parking or other structure shall be permitted within 30 feet of the corporate park exterior property line and 50 feet along all other streets, public or private, existing and proposed. 3. Planters, walls, and sign elements not exceeding three feet in height may be permitted in the setback area with written approval of the Architectural Review Committee. 2.5 Side Property Line Setbacks No building, parking, or other structures shall be permitted to be constructed closer than 20 feet from any interior side property line, 30 feet from an external lot abutting a residential zoned district and 25 feet in the Highway Overlay District. Interior Side setback may exceed 20 feet when a buffer or grading slope is required. 2.6 Rear Property Line Setbacks No building, parking, or other structures shall be permitted to be constructed closer than 30 feet from a rear property line. Rear setback may exceed 30 feet when a buffer or grading slope is required. 2.7 Site Access and Traffic Flow 1. Direct access onto Applewood Road Parkway for individual sites is not permitted unless approved by the Architectural Review Committee, Gaston County or City of Gastonia, and NCDOT. All new driveways within the corporate park shall be connected to the new interior private and/or public roadway network. Apple Creek Corporate Park DG-8 2. Two-way driveway shall be minimum 26-foot wide (minimum, face of curb to face of curb) curbed driveway with a concrete apron. 3. One-way driveways shall be minimum 16-foot wide driveways. 4. All driveways shall have 20-foot minimum radii. 5. Drive-through facility shall allow for sufficient vehicle stacking distance and adequately screened from the public view. 6. Access drives to each site shall be limited to two (2) unless approved by the Architectural Review Committee. 7. Lots with 150 linear feet of street frontage or less are allowed 1 curb cut per street front. Lots with greater than 150 linear feet of street frontage are allowed 2 curb cuts per street front. 8. Separation between curb cuts on the same lot shall be 50’ minimum. 2.8 General Parking Requirements 1. Adequate off-street parking shall be provided to accommodate all parking needs for the site. Required off-street parking shall be provided on the site of the use served, on a contiguous site, or within 500 feet of the subject site. 2. No driveway or street connection to a public street shall be constructed, relocated or modified without an approved driveway permit. All driveway permits shall be approved by either by Gaston County or City of Gastonia and NCDOT. 3. Parking lots and drives shall be paved with asphalt or concrete. Gravel lots are not permitted. 4. No dead-end parking is allowed for multiple bay parking lots. (See exhibits). 5. No parking allowed within setbacks. 6. Parking areas and drives located in the front or side of the building structure shall be separated by 15 foot (minimum) landscape area. 7. Parking lots shall be landscaped and screened from the road right-of-way and adjacent property line(s). 8. For multiple bay parking lots, a continuous interior landscape medians with a minimum width of eight (8) feet from back of curb to back of curb shall be provided between all parking bays (See exhibits). 9. For single and multiple bay parking lots, interior landscape islands with a minimum width of eight (8) feet shall be provided at 125-foot on center and 250-foot on center, respectively. (See exhibits) 10. Perimeter of parking lot, median, landscape islands, and traffic islands shall have 18-inch concrete curb and gutter. 11. No curbs shall be closer than 15 feet from any building to back of curb to allow for landscaping between parking area and building. (See exhibits). 12. Each parking space within a surface parking lot, not including Parallel Parking or Accessible Parking Spaces shall be rectangular in nature. These spaces shall be 19 feet in length by 9 feet in width, with a 24’ wide two way drive aisle. Alternate drive aisle dimensions may be reviewed and approved by the Architectural Review Committee. 13. Parallel parking spaces shall be not less the 22 feet in length by 9 feet in width. 14. Parking lot stripping shall be white in color and four (4) inches in width. Apple Creek Corporate Park DG-9 15. Off-street parking lots shall be designed to facilitate safe and efficient movement providing appropriate access by service vehicles, emergency, etc. without posing a danger to pedestrians or impeding the function of the parking area. 16. Circulation areas shall be designed so that vehicles can proceed safely without posing a danger to pedestrians or other vehicles and without interfering with parking areas. 17. Off-street parking lots shall be designed to allow pedestrians to safely move from their vehicles to on-site buildings. Lots containing more than 100 off-street parking spaces on any one side of the building shall be designed to have at least one designated and readily identifiable corridor that channels pedestrians from their vehicles in that parking area to a nearby on-site building. 2.9 Sidewalks 1. A five-(5) foot wide concrete sidewalk shall be installed along back of curb of parking lot to provide pedestrian circulation from parking lots to buildings and between parking bays. 2. On-site pedestrian circulation systems shall be provided to meet the circulation needs of on-site users, adjacent lots, and overall development. 3. On-site pedestrian circulation systems shall be designed to provide pedestrians to safely move from their vehicles to on-site buildings. Parking lots shall provide at least one designated and readily identifiable corridor that channels pedestrians from their vehicles in that parking area to a nearby on-site building. 4. Where usage dictates, connections should be made between on-site and off-site perimeter pedestrian circulation systems, existing sidewalks, adjacent buildings, and future sidewalks and buildings. 5. Sidewalks shall be provided along public streets in accordance with zoning and subdivision ordinances. 2.10 Grading and Drainage 1. Parking lots and drives shall have a minimum slope of 0.5% and maximum slope of 5.0%. 2. Embankment slopes facing public streets of future development areas shall be graded no steeper than 3:1 stabilized and fully landscaped with evergreen shrubs and trees, and irrigated. (GRASS ???) 3. Embankment slopes not facing public streets or future development areas shall be graded no steeper than 2:1, stabilized and landscaped with ground cover and trees, and irrigated. (GRASS ???) 4. Storm drainage shall be handled through underground drainage system(s). Open ditches are not permitted without prior approval from the Architectural Review Committee. 5. Storm drainage system(s) shall be designed and sized to handle runoff for adjacent sites after development. This may require the over sizing of drainage pipes and extension of the drainage system to the property line to facilitate future extensions. 6. The purchasers of property in the park are required to meet permitting standards for Storm Water Detention, Water Quality and Total Suspended Solids removal as required by Gaston County or City of Gastonia and State of North Carolina Department of Environmental Quality. If the park developers build a common storm water detention facility users may, or could be required to connect to this Apple Creek Corporate Park DG-10 system. All storm water management plans must be submitted to the Architectural Review Committee in the addition to the State. 7. Temporary stockpiling of topsoil or surplus cut materials shall not be permitted without prior approval from the Architectural Review Committee. Permanent stockpiling is not permitted. Excess topsoil may be placed in berms with Architectural Review Committee Approval. 8. All necessary erosion control measures shall be installed and maintained per NCDEQ standards to avoid siltation onto adjacent properties, streams, and drainage systems. 9. Developers of individual sites are required to save large maturing trees within their development when possible. This may require special grading considerations, retaining walls, etc. 2.11 Roadways 1. Design and construction of roadways proposed within The Applewood Road Parkway is subject to Gaston County or City of Gastonia and NCDOT approval. 2. Right-of-way for all new public roadways shall be a minimum of 60 feet. These roadways are 33 to 40 feet wide (face of curb to face of curb) with curb and gutter, sidewalks, landscape treatments, and lighting. 3. Private joint access drives shall be wide enough for two-way traffic with 2' 6" curb and gutter, sidewalks, landscape treatments, and lighting. For setback purposes, right-of-way is assumed to be 50 feet wide. 4. All roadways shall be paved with heavy duty asphalt or concrete pavement to meet Gaston County or City of Gastonia and NCDOT Standards. 2.12 Storage, Service, and Loading Area l. Service, maintenance, and loading areas must be constructed, maintained, and used in accordance with the following conditions: a. No materials, supplies, or equipment, including trucks or other motor vehicles, shall be stored upon a site except inside, closed building and or behind a durable material wall 8’ feet in height, screening such materials, supplies, or vehicles from adjacent sites so as not to be visible from neighboring properties, streets, and buildings. Outside storage is not permitted unless written request is approved by Architectural Review Committee. b. All uses that store heavy equipment outdoors on a regular basis (eg backhoes, skid steers, graders, loaders, etc. shall be screened from adjacent properties. c. Buffering for storage areas 1 acre or less in size shall consist of any one or more of the following: (#1) 8’ wall of durable weather resistant material or opaque fence. Both options shall meet the requirements of the underlining Uniform Development Ordinance ‘Standard For Walls and Fences’, or (#2) a Type C Buffer or greater. Outside storage screening proposal shall be submitted in writing and shall be reviewed and approved by Architectural Review Committee d. If the storage area is greater than 1 acre in size, screening shall consist of Type D Buffer or greater in addition to the fence or wall as described above. Such planted strip shall be on the exterior of the wall or fence. e. Provisions shall be made on each site for any necessary vehicle loading/ unloading, and no on-street vehicular loading or maneuvering shall be permitted. 2.13 Refuse Collection Areas 1. All outdoor refuse containers shall be Apple Creek Corporate Park DG-11 screened with in a durable minimum eight (8) feet, or higher as required to totally screen, noncombustible enclosure so as not to be visible from adjacent lots or sites, neighboring properties or streets. No refuse collection areas shall be permitted between a street and the front of a building. 2. Refuse collection enclosures shall be designed of durable materials with finishes and colors that are unified and harmonious with the overall architectural theme. Chain link fence with slats is not an acceptable material. 3. Refuse collection areas should be so located upon the lot as to provide clear and convenient access to refuse collection vehicles. 4. Refuse collection areas should be designed to contain all refuse and located at the rear of the lot and shall not be visible from neighboring properties, streets, and buildings 2.14 Screening of Exterior Mechanical Equipment 1. In the case of roof mounted mechanical equipment, the building parapets must be of such a height that roof-mounted screening devices not be required. If building parapets do not provide an unobtrusive screening device that will appear as an integrated part of the overall architectural design shall screen the required screening, mechanical equipment. 2. Any devices employed to screen exterior components of plumbing, processing, heating, cooling, and ventilating systems from direct view shall appear as integrated parts of the architectural design and, as such, shall be constructed of complementary and durable materials and finished in a texture and color scheme complementary to the overall architectural design. 3. Any exterior components of plumbing, processing, heating, cooling, and ventilating systems and their screening devices which will be visible from upper floors of adjacent buildings shall be kept to a visible minimum, shall be installed in a neat and compact fashion, and shall be painted such a color as to allow their blending with their visual background. 2.15 Screening of Exterior Electrical Equipment and Transformer 1. Transformers that may be visible to public view shall be screened with either plantings or durable noncombustible enclosure. Where possible, it is recommended that refuse containers and transformers be integrated into the same enclosure. 2. Transformer enclosures should be designed of durable materials with finishes and colors that are unified and harmonious with the overall architectural design. 3. Exterior-mounted electrical equipment shall be mounted on the interior of a building wherever possible. When interior mounting is not practical, electrical equipment shall be mounted in a location where it is substantially screened from public view. In no case shall exterior electrical equipment be mounted on the street side or primary exposure side of any building. 4. Exterior-mounted electrical equipment and conduits shall be kept to a visible minimum, where visible shall be installed in a neat and orderly fashion, and shall be painted to blend with their mounting backgrounds. 2.16 Fences and Walls 1. No fence or retaining walls exceeding three 3 feet in height shall be constructed closer than 50 feet from the curb line of any fronting street and outside the required setback. 2. No fence or wall shall exceed a height of 8 feet unless otherwise approved in writing by the Architectural Review Committee. Apple Creek Corporate Park DG-12 3. Walls and fences between building and fronting streets are discouraged but when necessary will require written approval of the Architectural Review Committee. 4. Retaining walls between building and fronting streets are discouraged but when necessary written approval of the Architectural Review Committee will be obtained. All exposed faces of retaining walls in this category must be architecturally compatible to the exterior walls of the building. Timber or block retaining walls are not permitted. 5. All fences and walls shall be designed as integrated parts of the overall architectural and site design. All materials shall be durable and finished in textures and colors complementary to the overall architectural design. 6. Chain link, hog wire, split rail or other security fences shall not be permitted within the development. 2.17 Utilities and Communication Devices 1. All on-site utilities, including but not limited to drainage systems, sewers, gas lines, water lines, and electrical, telephone, and communications wires, and equipment, shall be installed and maintained underground. 2. On-site underground utilities shall be designed and installed to minimize the disruption of off-site utilities, paving, and landscape during construction and Maintenance. 2. No antenna, satellite, communication tower, or device for transmission or reception of any signals, including but not be limited to telephone, television, and radio, shall require approval from the Architectural Review Committee, and Gaston County or City of Gastonia. 3. Installation of all electrical and telecommunication equipment shall require the approval of the Architectural Review Committee. 4. Temporary overhead power and telephone facilities are permitted during construction. 5. All temporary structures must be disconnected and removed upon receiving Certificate of Occupancy. 2.18 Mailboxes Individual outdoor mailboxes or newspaper boxes are not permitted on any tract within the development without Architectural Review Committee Approval. All boxes must conform to the type and size specified by the guidelines to be provided by the Architectural Review Committee. General mailboxes and overnight boxes, such as FedEx, shall require the Architectural Review Committee's approval. Apple Creek Corporate Park DG-13 3.0 ARCHITECTURAL GUIDELINES 3.1 Objectives To provide an overall high quality and uniformity within The Apple Creek Corporate Park Special emphasis is placed upon methods that end to reduce the large- scale visual impact of buildings-to encourage tasteful, imaginative design for individual buildings while retaining an overall sense of propriety-to create a complex of buildings compatible with each other and the existing buildings of Gastonia Technology Park and Gaston College. All future property owners are encouraged to explore the creative possibilities of their sites and building programs to achieve a consistency of basic architectural elements. All buildings are to be modern and progressive in design and shall reflect institutional character. 3.2 Site Planning Design 1. Facility’s entrance drive shall be readily observable to the first-time visitor. 2. Minimum conflicts should exist between service vehicles, private automobiles, and pedestrians within the site. 3. Visitor building entries shall be readily identifiable and accessible to the first- time visitor. 4. Building entries shall be highlighted by such features as: a. Ceremonial entry porte-cocheres b. Plazas c. Special planters and plantings d. Architectural walls 3.3 Building Exterior Wall Materials 1. Architectural Review Committee shall require materials used in connection with the exteriors of buildings or other structures to be of high quality, compatible in design and materials with all other structures within the development, and of makeup that will convey premium manufacturing-type building. a. One dominant exterior building material should be selected and expressed with its own natural integrity. Exterior building materials shall convey permanence, substances, timelessness, and institutional character. b. Materials shall blend with those existing in the adjacent area of the park. c. All exterior building materials shall be of brick, stone, architectural pre-cast concrete, glass in predominance, or other materials subject to the Architectural Review Committee’s approval. d. Pre-engineered metal, concrete block, split-faced block, stucco, tilt up, metal panels, and corrugated metal-sided “Butler” type buildings are prohibited in connection with the construction of the exterior of any structures or other improvements. e. All roof drain pipes on buildings must be on the interior of the building and connected onto an underground storm drainage system. f. Submittal of proposed exterior elevations noting building material includes samples and colors is required for prior review and approval by the Architectural Review Committee 2. Exterior walls of all buildings shall have a continuous and uniform parapet to fully conceal roof materials, mechanical equipment, and all other materials and equipment. Apple Creek Corporate Park DG-14 3. Exterior canvas and metal canopies are not permitted. All other materials for fascia treatment require prior review and approval of the Architectural Review Committee. 4. Canopy attached or unattached to the building for the purpose of providing shelter to patrons or automobiles or as a decorative feature shall be subject to the same architectural requirements as the building. 3.4 Building Roofs 1. In instances where flat roof areas can be viewed from above, care should be taken that all roof vents, roof-mounted mechanical equipment, pipes, etc. are grouped together and painted to match roof color to reduce their appearance. 2. Pitched roofs with asphalt shingles, cedar shingles, standing seam metal, aluminum, or any other roof material are not permitted. 3. All roof mounted mechanical equipment shall be screened from view by parapet walls or special screening. Screens shall be attractive in appearance and compliment the architectural theme of the building. All screening shall be of height of the mechanical equipment and consideration will be given to the view plane of the adjacent developments. 3.5 Color and Texture 1. Simple and uniform texture patterns are encouraged to create shadow patterns that will reduce the high visibility of the building. 2. Variations in color shall be kept to a minimum 3. Colors shall be subdued in tone. 4. Accent colors may be used to express corporate identity. 5. All colors used for building exteriors shall be submitted for prior review and approval by the Architectural Review Committee. Apple Creek Corporate Park DG-15 4.0 LANDSCAPE AND IRRIGATION GUIDELINES The intent of these guidelines is to provide design criteria which will fulfill aesthetic considerations and help insure an image that is distinctive and understandable, and that unifies the whole development. Landscaping shall also meet the requirements of the Gaston County or City of Gastonia's Landscape Ordinance and be approved by the Architectural Review Committee. 4.1 Landscape Standards All landscaping shall be installed to accepted commercial planting procedures by qualified persons using the quality and type of plant materials indicated in the landscape plan as approved by the Architectural Review Committee. All plant materials shall meet or exceed the minimum requirements of the American Standard for Nursery Stock, latest edition. The following minimum size requirements and specifications shall be required for all plant material: 1. Evergreen Tree: 6-8 Feet High (Min), Ball and Burlap, Full Canopy 2. Canopy Tree: 3” Caliper (Min), 10-12 Ht, Ball and Burlap, Full Canopy. 3. Understory Tree: 8-10 Feet High (Min) ,2” Caliper (Min), Ball and Burlap. 4. Shrub: 3 Gallon and 3 Feet Height at time of planting, Full Canopy. 4.2 Interior Landscape Coverage A minimum of at least 10 percent of the lot gross area shall be devoted to interior landscape planting. These areas shall consist of parking lot interior landscape islands, landscape planting around buildings, and tree save areas interior to the developed portion of the site, five (5) feet strip parallel to the outside edge of the parking lot. Setbacks, buffers, and future development areas shall not be considered when determining the interior landscape requirements. 1. Street Trees required. Canopy and understory trees shall be planted, where required, as follows: a. One canopy tree for each 40 linear feet of frontage; or, b. One understory tree for each 30 feet of frontage; or, c. A combination of canopy and understory trees at the rate of one per 35 feet of frontage. d. For interior roads only, any combination of canopy trees so long as the type and spacing of trees placed can be expected to form a substantial canopy within 20 years of initial planting. 2. Internal Road Landscaping. Any internal road two hundred fifty (250) linear feet or greater in length which is used as an entryway into a parking lot for a commercial development shall be planted (on both sides) with any combination of canopy trees so long as the type and spacing of trees is such that the trees touch each other at the date of maturity. 4.3 Landscape Easements 1. Fifteen (15) feet along each side of Gastonia Technology Parkway's right- of-way. 2. Fifteen (15) feet along both sides of all other streets’ right-of-way. 4.4 Parking Lot Requirements 1. Tree Planting Requirements: a. A minimum of one 3-inch caliper Canopy Tree is required per eight 8 parking spaces, plus one Understory Tree per 10 parking spaces, plus one Shrub per 4 spaces. b. Required trees shall be located within or adjacent to parking lots as tree islands, medians, at the end of parking bays, traffic delineators or between rows or parking Apple Creek Corporate Park DG-16 spaces in a manner such that no parking space is located greater than 75 linear feet from a Canopy or Understory Tree on the subject property. Such trees may be existing trees, or proposed. c. Trees shall be planted at the center of median separating parking bays at 40- foot on center. d. Planting areas and islands shall be not less than eight feet in width and shall include a minimum of 140 square feet of open planting area for Understory Trees and 280 square feet for Canopy Trees. Shrubs or Ground Cover may be planted within the required open planting area. e. Islands at the end of the parking bays shall be landscaped with a combination of trees and grass or trees and shrubs. f. All landscaped areas called for in this section shall be protected from vehicular encroachment by concrete curb and gutter. Landscaped areas shall be covered with mulch or ground cover between shrub and tree plantings. g. Parking areas located in the front or side yards shall be separated from the exterior wall of a structure by a landscaped area of at least 15 feet in width. Shrubs shall be required within said area at a minimum of one per 6 linear feet. h. Wheel stops are not allowed in any area without written request and approval by the Architectural Review Committee. i. The use of several tree species throughout the parking area is encouraged. 3. Screening: The perimeter of all parking lot areas will be screened with an evergreen hedges, planted five-(5) feet on center, and at a minimum height of three (3) feet at time of planting. 4.5 Areas Between Building Facades and Parking 1. Those areas between building facades, and parking lot or paved areas shall be completely landscape planted and irrigated. Landscape plantings shall consist of trees, shrubs, grass, and ground covers appropriate to the building and site design. 2. The width of the planting areas between pavement and building shall be at least fifteen (15) feet, including the sidewalk. 3. Five (5) sidewalks shall be provided along back of curb to provide pedestrian circulation from parking lot to building entrances. 4.6 Tree Save Zones A reasonable effort should be made to save existing mature trees located within the setbacks of each site, and within the development envelope. This may require special grading considerations, retaining walls. etc. 4.7 Street Trees Developer is responsible for planting street trees along both sides of all new public collector streets within the development. Individual site owners are responsible for planting trees along existing streets to meet Gaston County or City of Gastonia's requirements. 4.8 Irrigation 1. Irrigation must be supplied to the developed portion of any site including the landscaped islands within each parking lot, open lawn areas, lawn areas within the setbacks and slopes. 2. Automatic irrigation systems shall be installed for each site. A minimum amount of water shall be allowed to over spray on sidewalks or other pavement. Apple Creek Corporate Park DG-17 3. Irrigation plan shall be prepared by a NC Licensed Irrigation Professional and submitted and approved by the Architectural Review Committee. 4.9 Installation and Maintenance with in the Right-of-Way and Setback 1. All landscape improvements and maintenance within the setbacks are the responsibility of the individual site owner(s). 2. The Association through a Common Area maintenance charge will provide all landscape maintenance for common areas. 3. Landscape and irrigation within the right-of- way and setback will be installed as a continuous linear system. Demolition of this system at vehicular access points will be necessary during installation of the access drives. It is the responsibility of the property owner to maintain the flow of the irrigation system during construction, and to reestablish the grading, planting, and final irrigation layout that has been altered. 4.10 General Maintenance Standards Each owner is responsible for maintaining its lot in a neat, slightly, and well-kept manner. Each lot may be subject to a lien in the event its owner, after required notice, fails to maintain the lot in accordance with uniform standards promulgated by the Architectural Review Committee 4.11 Maintenance of Unimproved Sites The property owner shall maintain sites that are not improved or built upon in a clean and neat appearance. The Apple Creek Corporate Park Association and its representatives have the right to perform the necessary maintenance and charge the individual tenant or property owner as required. 4.12 Plant Material Plant material for each site (tree, shrubs, etc) shall be selected for a list of acceptable plant species that have been prepared for The Apple Creek Corporate Park. Additional plant material may be considered and approved by the Architectural Review Committee. 4.13 Acceptable Plant Material List See Plant List Exhibit #1 Apple Creek Corporate Park DG-18 5.0 SIGNAGE GUIDELINES 5.1 Objective 1. To ensure that signs are designed constructed, installed, and maintained so that public safety and traffic safety are not compromised. 2. To minimize the distractions and the obstructing-of-view that contribute to traffic hazards and endanger public safety. 3. To encourage a high standard for signs in order that they should be appropriate to and enhance the aesthetic appearance of The Gastonia Technology Park and, further, create an aesthetic environment that contributes to the ability of the community to attract sources of economic development and growth. 4. To allow for the adequate and effective sign for communicating identification while preventing signs from dominating the visual appearance of the area in which they are located. 5.2 Submittal 1. All proposed exterior signs for each facility shall be submitted to the Architectural Review Committee as part of the preliminary plan submittal. 2. Sufficient renderings to show copy, sizes, and placements of proposed signs, materials and colors sample boards, and preliminary details of sign construction shall be submitted to the Architectural Review Committee for approval. 5.3 General Standards 1. All signs should comply with the design guidelines and standards to be developed by the Declarant for The Apple Creek Corporate Park. 2. Real estate signs shall require prior approval of Architectural Review Committee and meet the design intent of the signage guideline. 5.4 Prohibited Signs The following signs are prohibited unless otherwise approved by the Architectural Review Committee: 1. Banner and poster signs advertising commercial products 2. Campaign and/or election signs 3. Permanent construction sign 4. Flashing sign 5. Non-conforming sign 6. Outdoor advertising sign 7. Pole sign 8. Window sign 9. Roof signs 10. Signs attached to building exterior or windows advertising commercial products. Apple Creek Corporate Park DG-19 6.0 LIGHTING GUIDELINES 6.1 Objectives The objective of this section is intended to accomplish the following: 1. To contribute to the safe and efficient use of a development site. 2. To contribute to the site security 3. To complement and reinforce the architecture and site design character 4. To keep on-site parking-lot lighting fixtures and illumination levels consistent throughout the Apple Creek Corporate Park. 5. To prevent casting glare onto adjacent lots. 6. To encourage lighting design that is in conformance with energy-saving guidelines. 7. Lighting site plan shall be provided indicating type of fixture, height, and level of lighting. 6.2 Submittal 1. All proposed exterior lighting fixtures shall be submitted to the Architectural Review Committee for review and approval. 6.3 General Standards 1. All lighting potentially visible from an adjacent street, except bollard lighting less than 42 inches high, shall be indirect or shall incorporate a full cut-off shield type fixture. 2. All fixtures must be either semi- cutoff or full-cutoff fixtures. Full-cutoff light fixtures are shielded or constructed so that no light rays are emitted by the installed fixture at angles above the 90 degree horizontal plane. For semi-cutoff fixtures, no more than five percent of its light rays shall be emitted above the 90 degree horizontal plane. 3. Lighting fixtures for parking uses, assess drives, and internal vehicular circulation areas shall be a zero cutoff fixture. 4. The parking-lot illumination level shall achieve a uniform level of lighting. 5. The maximum height of the light source (light bulb), detached from a building, shall be 20 feet. (Seems Low) 6. Service area lighting shall be contained within the service yard's boundaries and enclosure walls. No light spillover should occur outside the service area. The light source should not be visible from the street. 7. Building illumination and architectural lighting shall be indirect in character. indirect wall lighting or "wall-washing" overhead down lighting or interior illumination that spills outside is encouraged. Architectural lighting should articulate and animate the particular building design, as well as provide the required functional lighting for safety and clarity of pedestrian movement. 8. Floodlights, spotlights or any other similar lighting shall not be used to illuminate buildings or other site features unless they are an integral architectural element that is designated on the development plan. When approved, exterior lighting should be integrated with the architectural character of the building. 9. The unshielded outdoor illumination of any building or landscaping is prohibited. To avoid light spillage, only semi-cutoff or full cutoff fixtures can be used. 10. External lighting fixtures used to illuminate a sign must either be by directed ground lighting sign or mounted on the top of the sign. Apple Creek Corporate Park DG-20 11. All site lighting and building exterior lighting fixtures and poles shall be of a decorative type and uniform color and height. 12. All poles shall be of a decorative, fiberglass, black in color, and installed flush with the ground. 13. All light fixtures shall be of modern shoebox style mounted at the appropriate height. 14. All exterior lighting shall be metal halide or LED. Apple Creek Corporate Park DG-21 Plant List Exhibit #1 Large /CanopyTrees Acer Rubrum Red Maple Cultivars: Autumn Blaze, Autumn Flame, October Glory, Red Sunset, Brandywine, Sun Valley Acer Saccharum Sugar Maple Cultivars: Green Mountain, Legacy Betula Nigra River Birch Celtis Occidentalis Hackberry Fagus Grandiflora American Beech Fraxinus Americana White Ash Fraxinus Pennsylvanica Green Ash Ginko Biloba Ginko (Male Only) Gymnocladus Dioicus Kentucky Coffeetree Liquidambar Styraciflua Sweetgum (Only Fruitless or Slender) Liriodendron Tulipifera Tulip Poplar Nyssa Sylvatica Blackgum Quercus Acutissima Sawtooth Oak Quercus Alba White Oak Quercus Bicolor Swamp White Oak Quercus Falcata Southern Red Oak Quercus Lyrata Overcup Oak Quercus Nuttalli Nuttall Oak Quercus Phellos Willow Oak Cultivars: Hightower, Wynstar Quercus Shumardii Shumard Oak Quercus Virginiana Live Oak Taxodium Distichum Bald Cypress Tilia Cordata Little Leaf Linden Ulmus Parvifolia Lacebark Elm Cultivars: Allee, Athena, Bosque, Drake Small/Understory Trees Acer Buergeranum Trident Maple Acer Campestre Hedge Maple Acer Griseum Paperbark Maple Acer Palmatum Japanese Maple Acer Truncatum Shantung Maple Amalanchier Arborea Serviceberry Amalanchier x Grandiflora Autumn Brilliance Serviceberry Cercis Canadensis Eastern Redbud Cultivars: Forest Pansy, Eastern White, Oklahoma Chionanthus Retusus Chinese Fringetree Chionanthus Virginiana Fringe Tree Cladrastis Kentukea Yellowwood Cornus Florida Flowering Dogwood Cornus Kousa Kousa Dogwood Crategus Phaenopyrum Washington Hawthorne Halesia Carolina Carolina Silverbell Lagerstroemia spp. Crape Myrtle Cultivars: Tuscarora, Miami, Biloxi, Choctaw, Muskogee, Natchez, Fantasy, Fauriei, Apple Creek Corporate Park DG-22 Small/Understory Trees (Small/Understory Trees that may be planted under and within 25’overhead power lines, final approval from owner of power line) Lagerstroemia spp. Crape Myrtle Cultivars: Acoma, Comanchee, Lipan, Osage, Sioux, Uma, Seminole, Tuskeegee, Potomac, Catawba, Conestoga, Apalachee, Townhouse, Powhatan Magnolia Liliflora Lily Flowered Magnolia Magnolia Stellate Star Magnolia Magnolia x Soulangiana Saucer Magnolia Oxydendrum Arboretum Sourwood Pistachia Chinensis Chinese Pistache Prunus Cerasifera Purple leaf Plum Prunus Flowering Cherry Cultivars: Okame, Snowgoose, Autumnalis Rosea, Kwansan, Yoshino Evergreen Screen/Buffer Trees (* Indicates may be planted under and within 25’overhead power lines, final approval from owner of power line) Camellia Sasanqua * Camellia Sasanqua Cedrus Deodara Deodar Cedar Cryptomeria Japonica Japanese Cryptomeria Cupressus Sempervirens Italian Cypress Ilex Cornuta Burfordii Burford Holly Ilex Vomitoria * Yaupon Holly Ilex x ‘Nellie R Stevens’ * Nellie Stevens Holly Ilex x Attenuata ‘Fosterii #2’ Foster’s Holly #2 Juniperus Virginiana Eastern Red Cedar Loropetalum Chinense * Chinese Fringe Flower Magnolia Grandiflora ‘Little Gem’ * Little Gem Magnolia Pinus Taeda Loblolly Pine Pinus Virginiana Virginia Pine Podocarpus Macrophyllus Maki Podocarpus Prunus Caroliniana * Carolina Cherrylaurel Thuja Occidentalis Arborvitae Cultivars: Green Giant, Emerald Green Tsuga Canadensis Eastern Hemlock Osmanthus Fragrans * Tea Olives Elaeagnus Angustifolia * Elaeagnus Ligustrum Japonicum * Japanese Ligustrum Ligustrum Lucidum * Waxleaf Ligustrum Shrubs Abelia Chinesis Chinese Abelia Abelia Hybrids Abelia Cultivars; Edward Goucher, Little Richard, etc. Abelia x Grandiflora Glossy Abelia Berberis Julianae Wintergreen Barberry Apple Creek Corporate Park DG-23 Berberis Thunbergii ‘Atropurpurea’ Atropurpurea Nana Barberry Berberis x Chenaultii Chenault Barberry Callicarpa Americana American Beautyberry Camellia Sasanqua Sasanqua Camellia Camellia sinensis Tea Camellia Deutzia Gracilis Slender Deutzia Elaeagnus Angustifolia Russian Olive Elaeagnus Pungens Thorny Elaeagnus Forsythia Forsythia Cultivars; Beatrix, Lynwood Gold,Spring Glory, etc. Forsythia x Intermedia Border Forsythia Ilex Cornuta Chinese Holly Cultivars; Carissa, Burford, Rotunda, Needlepoint, etc Ilex Crenata Japanese Holly Cultivars; Hetz, Helleri, Convexa, Stokes, etc. Ilex Decidua Possomhaw Holly Ilex Glabra Inkberry Holly Ilex Latifolia Lusterleaf Holly Ilex Vomitoria Yaupon Holly Cultivars; Condeaux, Schillings, Stokes, Nana, Ilex x 'Nellie R. Stevens' Nellie Stevens Holly Ilex x 'Emily Bruner' Emily Bruner Holly Ilex x 'Mary Nell' Mary Nell Holly Itea Virginica Virginia Sweetspire Juniperus Chinensis (Dwarf Varieties) Chinese Juniper Cultivars; Procumbens Nana, Sargenti, Hetzi, etc Juniperus Davurica Parsons Juniper Juniperus Horizontalis Creeping Juniper Cultivars; Blue Chip, Wiltonii, Blue Rug, etc Ligustrum Japonicum Japanese Ligustrum Ligustrum Lucidum Waxleaf Ligustrum Lindera Benzoin Spice Bush Loropetalum Chinensis Loropetalum Loropetalum Cultivars Loropetalum Cultivars; Plum Delight, Ruby, Fire Dance, etc. Myrica Cerifera Southern Waxmyrtle Myrica Pensylvanica Northern Bayberry Nandina Domestica (Dwarf Varieties) Nandina Cultivars; Harbour Dwarf, Fire Power, Gulfstream, etc Rhaphiolepis Umbellate Indian Hawthorn Cultivars; Yeddo, Gulfgreen, Minor, Snow White, Majestic Beauty, etc. Rhaphiolepis x Delacourii Indian Hawthorn Cultivars; Wilco Spiraea Thunbergii Thunberg Spirea Spiraea x Bumalda Bumalda Spirea Viburnum Acerifolium Maple-Leaf Viburnum Viburnum Tinus Laurustinus Viburnum Apple Creek Corporate Park DG-24 Apple Creek Corporate Park DG-25 Apple Creek Corporate Park DG-26