Loading...
HomeMy WebLinkAbout20050688 Ver 2_Staff Comments_20070413East Alamance Quarry Issues 1) DWQ and COE stream calls a) DWQ- Perennial from property line to property line b) COE- Unimportant from Property line to below road, Important from call point to property line Mitigation Needs a) DWQ- requirement for 1:1 mitigation for entire stream Excluding segment within existing pipe- length = b) COE- requirements of DWQ sufficient to meet COE Requirements down to the power line, COE -requirement for 2:1 from power line to southern Property line; length = c) Total length of mitigation payment = 2) Stormwater System a) Stormwater diversion from pond to southwest area This is not a treatment proposal but is offered only as a means of carrying water from the pond to a lower elevation and provide hydration for the wetland system outside of the berm area. 3) Road/Stream crossing a) Bridge crossing estimate = $375,000 b) Culvert crossing estimate = $1,500"0 4) Public Meeting MMM has discussed the meeting and has determined that the local Community building close to the quarry is available for the public meeting. MMM will attend and participate in discussion in the meeting. MMM request the meeting be held within the time frame of the reissued public notice as require Eby the COE r ~ 1~ C~ ~~,~