Loading...
HomeMy WebLinkAboutWQCSD0529_NOV-2020-DV-0447 Response_20201210In t� awater December 10, 2020 Tom Tharrington, Asst. Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Re: Notice of Violation & Intent to Issue Civil Penalty Tracking No: NOV-2020-DV-0447 Sanitary Sewer Overflows —July 2020 Collection System Permit No WQCSD0529 Majestic Oaks Deemed Collection System Pender County Dear Mr. Tharrington, I am in receipt of the above referenced NOV dated September 30, 2020 and wanted to apologize in advance for not responding sooner. As you are aware, Old North State Water terminated its relationship with Envirolink, Inc. for contract operations the last week in September 2020. As you could imagine, we had a lot on our plate fixing the deferred maintenance left behind from Envirolink. During this transition, I was making contact with many people with in NCDEQ to make introductions and notifying them of the Envirolink change. One of the many reasons we terminated Envirolink is regarding NOV's. It was brought to our attention from NCDEQ that Old North State had outstanding violation penalties that were unpaid. Since Envirolink (Mike Myers) was listed as the owner, all the NOV's were going to his address in NC and we were never notified in our Birmingham, Alabama office. To make things worse Mike Myers never told us about any violations or paid for many violations. On October 2, 2020, 1 had a phone conversation with Dean Hankele as I was trying to get the contact names and addresses changes within your data base so we would receive notification and not Envirolink for such things as NOV's. In that October 2n0 conversation, Dean told me that Envirolink (Mike Myers) had not responded to the above referenced NOV. Being as it may, this was the first NOV we had received in the office and since it was from July 2020 and something Mike Myers should have responded to, we did not think we needed to anything. It was not until a few weeks ago that our owner John McDonald was on a conference call with your Wilmington group that Dean had brought up this NOV. Again, I apologize for the misunderstanding and not responding. In regards to the reference NOV, we have installed all new HOMA Vortex pump in each lift station in Majestic Oaks (see attached). Unbeknownst to us, Envirolink was operating Majestic Oaks lift stations with only one pump. Somewhere along the way, pumps failed in the lift stations and they did not make the repairs. It was not until we receive this NOV on October 2"° that we investigated this violation and that is when we found that the lift stations only had one working pump. As you know, with a lift station only having one working pump and that pump fails it can create a major issue. It is our assumption that is what occurred on 7/16/20 at the Mae Drive pump station. After receiving this NOV, we made the immediate decision to install new pumps so each lift station has two working pumps. We continue to work with our operator at Majestic Oaks to provide him the support needed to operate Majestic Oaks. Please reconsider the enforcement of the civil penalty, as we are working diligently to solve the issues. We are under contract to sell the Majestic Oaks WWTP but are waiting on the Utilities Commission, as they must approve a utility acquisition and transfer. We have filed our seller Docket number W-1300- Sub 69 with the Utilities Commission and purchaser has filed their purchaser docket number W-1305- Sub 29 all of which is public record. In a perfect world, we are hoping this is approved and sold by the end of February. SincWely, Sean McMillan Vice President OLD NORTH STATE WATER COMPANY, LLC Requisition Client: Old North State Water Company Date Requested 10/9/2020 Date Approved System: Majestic Oaks Date Issued 10/9/2020 Vendor: Ben Aragona Delivery Date: Budgeted? YIN Deliver to: Majestic Oaks Project Budget % Budget Authorized Terms: Net 30 from reciept of invoice PO Number:1009-ONSW-400.00 Line Quantity Unit Description Unit Cost Ext Cost 1 1 LS#1 10 hp single phase HOMA Vortex pump $ 6,386.00 $ 6,386.00 2 1 LS#2 5 hp Liberty High Head pump w/slotted flange $ 5,999.00 $ 5,999,00 3 to fit existing rail system $ _ 4 1 LS#3 5 hp Liberty High Head pump w/slotted flange $ 5,999.00 $ 5,999.00 5 1 LS#4 5 hp Homa Vortex pump $ 5,000.00 $ 5,000.00 6 SUBMIT INVOICE TO THE FOLLOWING $ _ 7 ONSWC,LLC $ 8 P.O. BOX 10127 $ 9 BIRMINGHAM , AL 35202 $ 10 $ 11 EMAIL: ap@integrawater.com $ 12 $ 13 $ 14 $ 15 $ 16 $ 17 $ 18 Total $ 23,384.00 Hpprovai argnaturer Need? StoCk J Office Supply Ci "� Tools Eq/Auto Repair Plant Repair Plant R&R or CU Plant 08M Justification replacement pump for Majestic Oaks lift stations H