HomeMy WebLinkAboutWQ0041992_Application (FTSE)_20200918McDAVIDAsSOCIATES, INC.
CORPORATE OFFICE
Engineers • Planners • Land Surveyors
(252) 753-2139 • Fax (252) 753-7220
E-mail: mai0mcdavid-inc.com
3714 N. Main Street • P.O. Drawer 49
Farmville, NC 27828
NC Department of Environmental Quality
Water Quality Section
943 Washington Square Mall
Washington, NC 27889
ATTN: Allen Clark
Dear Mr. Clark:
GOLDSBORO OFFICE
Engineers • Planners
(919) 736-7630 • Fax (919) 735-7351
E-mail: maigold0mcdavid-inc.com
109 E. Walnut Street • P.O. Box 1776
Goldsboro, NC 27533
AFC
September 14, 2020 �4Zb
SFp18 %119�
20?0
%C�
Subject: Fast Track Sewer System Extension
Application
2018 CDBG Infrastructure Sewer
Project
Contract No. 4 - 64A and Meeks Road
Sanitary Sewer Improvements
Town of Parmele
We are submitting the following fast track sewer system extension application for the Town of
Parmele 2018 CDBG Infrastructure Sewer Project. The purpose of this project is to install sanitary
sewer collection systems along 64A and Meeks Road in Parmele, NC. This project consists of the
following:
1. Two (2) duplex sewer pump stations
2. Approximately 3,387 LF of 8" gravity sewer
Approximately 601 LF of 4" sewer force main.
We are submitting the following in this application:
1. Town of Parmele check # 3302, dated September 2, 2020 in the amount of $480.00, payable
to NC Department of Environmental Quality for the application fee.
2. Two (2) copies of the completed Fast Track Sewer System Extension (Form: FTA 04-16)
Application.
3. Two (2) copies of the completed Flow Tracking/Acceptance Form (Form FTSE 10-18) for
both Pump Station No. 2 and Pump Station No. 3.
4. Two (2) color copies of a USGS Topographic Map and street level map showing the project
areas
D805DFW20 1 10:47 AM
PARMELE-I8-CDBG-CN4-FAST-TRACK-COVER-LTR-003.wpd 200914
The combined average daily flow for the 2 sewer pump stations is 12,060 GPD. The project shall
provide a portable backup generator on a dual axle trailer. Pump Station No. 2 is located approximately
1.3 miles from Pump Station No. 3 (less then 5 minute drive). Pump Station No. 3 shall provide a
generator plug and an automatic transfer switch that will exercise the portable generator once per week.
Pump Station No. 2 shall provide a manual transfer switch with a generator plug. The portable generator
will be provided with a 200 gallon fuel tank capable of supplying the generator with enough fuel to
sufficiently operate the engine generator system continuously for a minimum of 24 hours at full rated
load without having to refuel.
Pump Station No. 2 has an average daily flow of 7,020 GPD. The high water alarm is set at
elevation 44.50 which allows the pump station and sanitary sewer collection to hold approximately 6,100
gallons (20 hours) of sewer above the high water float before a sewer spill.
Pump Station No 3 has an average daily flow of 5,040 GPD. The high water alarm is set at
elevation 56.50 which allows the pump station and sanitary sewer collection system to store
approximately 16,000 gallons (3.17 days) of sewage above the high water alarm before a sewer spill.
Please review the documents and issue permit at your earliest convenience. If you have any
questions please contact me.
Sincerely,
AaviF'.3Weir.
's ciates, Inc.
Jr., P.E.
Farmville Office
DFW/djb
Enclosures
cc: Jerry M. McCrary, Mayor, Town of Parmele
D805DFW20 2
PARMELE-I8-CDBG-CN4-FAST-TRACK-COVER-LTR-003.wpd
M
INC
I �4AM
200914
"This disbursement has been approved as required
by the Local Government Budget and Fiscal Control Act"
TOWN OF PARMELE
WATER ACCOUNT
PAY r u
TO THE r !
ORDER OF
Neils Fargo sank N.A.
North Carolina
w.ftfarg-
�rf /
i
3302
66-21/530 10129
DATE M-G�
P"aro
T .DlDL1ARS O sofa
0
State of North Carolina
11WR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A
NCAC 02T, 15A NCAC 02T .0300, Division policies and zood engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process (must be submitted for full technical review):
➢ Projects that require an environmental assessment in accordance with 15A NCAC I .0100;
➢ Projects that do not meet any part of the minimum design criteria (MDC) document;
➢ Projects that involve a variance from the requirements of 15A NCAC 2T;
➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinder pumps;
➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
➢ Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required ifems
are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and
reduce the amount of requested additional information. Failure to submit all required items will necessitate additional
processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit
one original and one copy of the application and supporting documentation.
A. One Original and One Copy of Application and Supporting Documents
® Required unless otherwise noted
B. Cover Letter (Required for All Application Packages):
® List all items included in the application package, as well as a brief description of the requested permitting action.
➢ Be specific as to the system type, number of homes served, flow allocation required, etc.
➢ If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Major Modification Application Packages):
® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal.
➢ Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages):
® Submit the completed and appropriately executed application.
➢ If necessary for clarity or due to space restrictions, attachments to the application may be made.
❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with
the North Carolina Secretary of State.
❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of
Deeds in the county of business.
® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
IS The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North
Carolina licensed Professional Engineer.
® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b).
Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is
provided from a person who meets the criteria in 15A NCAC 02T .0106(b).
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Pagel of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable):
® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one
year prior to the application date.
➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-
215.67(a).
➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project
area and closest surface waters.
➢ Location of the project (gravity sewer, pump stations & force main)
➢ Downstream connection points and permit number (if known) for the receiving sewer
® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field.
G. Existing Permit (All Modification Packages):
❑ Submit the most recently issued existing permit.
® Provide a list of any items within the permit the Applicant would like the Division to address during the permit
modification (i.e., permit description, flow allocation, treatment facility, etc.).
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
® Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations.
➢ This alternative is only available for average daily flows less than 15,000 gallons per day
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible
with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed
contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated
appurtenances and personnel are available for distribution and operation of this pump station."
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump
stations' storage capacities and the rotation schedule of the portable power source or pump, including travel
timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification)
I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina
Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by
the sewer extension, or
❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an
application for a franchise has been received and that the service area is contiguous to an existing franchised area or that
franchise approval is expected.
J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
❑ Home/Property Owners' Associations
❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA).
❑ Per 15A NCAC 02T.01 15(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
❑ Developers of lots to be sold
❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Regional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778
Clay, Graham, Haywood, Henderson, Jackson,
(828) 296-4500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Favetteville Regional Office
225 Green Street Suite 714
Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section
Fayetteville, North Carolina 28301-5094
Montgomery, Moore, Robeson, Richmond,
(910) 433-3300
Sampson, Scotland
(910) 486-0707 Fax
Mooresville Regional Office
610 E. Center Avenue
Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704) 663-1699
Stanly, Union
(704) 663-6040 Fax
Raleigh Regional Office
1628 Mail Service Center
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27699-1628
Granville, Halifax, Johnston, Lee, Nash,
(919) 791-4200
Northampton, Orange, Person, Vance, Wake,
(919) 788-7159 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Pender
(910)796-7215
(910) 350-2004 Fax
Winston-Salem Regional Office
450 W. Hanes Mill Road
Suite 300
Alamance, Alleghany, Ashe, Caswell, Davidson,
Davie, Forsyth, Guilford, Rockingham, Randolph,
Water Quality Section
Winston-Salem, North Carolina 27105
Stokes, Surry, Watauga, Wilkes, Yadkin
(336) 776-9800
INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3
DWR
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number:
(to be completed by DWR)
All items must be completed or the auulication will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Parmele (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Jerry McCraU per 15A NCAC 02T .0106(b)
Title: Mgyor_
4. Applicant's mailing address: PO Box 98
City: Parmele State: NC Zip: 27861
5. Applicant's contact information:
Phone number: 252 795-4600 Email Address: parmelecityhall(a-)suddenlinkmail.com
II. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
1. Project name: 2018 CDBG Infrastructure Sewer Project
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit(Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Martin
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.8225' Longitude:-77.2963'
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: David Frank Weir, Jr. License Number: 39099
Firm: McDavid Associates, Inc.
Mailing address: PO Drawer 49
City: Farmville State: NC Zip: 27828
Phone number: 2( 52) 753-2139 Email Address: dfw(a)mcdavid-inc.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Robersonville WWTP Permit Number: NCO026042
Owner Name: Town of Robersonville
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 04-16 Page I of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes [-]No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
[-]Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached?
[-]Yes [-]No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ® Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See 15A NCAC 02T .0103(20))
1Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No
➢ If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 021.01140
Daily Design Flow °"
No. of Units
Flow
Residential (Pump Station No. 2)
360 gal/day
4
1440 GPD
Church (Pump Station No. 2)
300 gal/day
1
300 GPD
Non Residential Land (Pump Station No. 2)
880 gal/acre
6
5280 GPD
Residential (Pump Station No. 3)
360 gal/day
14
5040 GPD
gal/
GPD
gal/
GPD
Total 1
12060 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 12060 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
90
DIP, Class 51
8
165
DIP, Class 53
8
3132
PVC, SDR 26
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VHI. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Pump Station No. 2
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.8233' Longitude:-77.2938'
3. Design flow of the pump station: 0.1584 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 110 gallons per minute at 72 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
4
24
DIP, Class 53
4
70
DIP, Class 51
4
150
PVC, SDR 21
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
® Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1 XC):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Pump Station No. 3
2. ' Approximate Coordinates (Decimal Degrees): Latitude: 35.8150' Longitude:-77.30360
3. Design flow of the pump station: 0.1584 millions gallons per day (fum capacity)
4. Operational point(s) of the pump(s): 110 gallons per minute at 20 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
Material
4
27
DIP, Class 53
4
110
DIP, Class 51
4
220
PVC, SDR 21
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(hx 1)(B);
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
® Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305 ft l)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations, storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ® Yes [:]No
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall he provided fnr sewer SvzfPmc-
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaQe
➢ If noncompliance with 02T.0305(f) or (Q), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [-]No
Per 15A NCAC 02T. 0 105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ❑ No ® N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
2.
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents
I,
Certification:
(Professional Engineer's name from Application Item III.1.)
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. _
North Carolina Professional Engineer's seal, signature, and date: A R
Q�. Oy 2
:a SEAL 7'; -
%Lid•.. GINE�.� \�
4,`O�
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, Jerry McCrary ----Mayor attest that this application for
(Signature Authority's name & title from Application Item I.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:
Date:
FORM: FTA 04-16 Page 5 of 5
Cl
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Parmele
Project Name for which flow is being requested: 2018 CDBG Infrastructure Sewer Project
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastesvaterflow.
I. Complete this section only if you are the owner of the wastewater treatment plant.,,
a.
WWTP Facility Name: Robersonville WWTP
w'e
b.
WWTP Facility Permit #: NCO026042
S�ep
c.
WWTP facility's permitted flow
All flows are in MGA
1.8 �a9fO�ar��d,,r@� <27
d.
Estimated obligated flow not yet tributary to the WWTP
0.00702
�o'�a o�ai,�
e.
WWTP facility's actual avg. flow
0.5333 (2018)
6yo �s
f.
Total flow for this specific request
0.00504
g.
Total actual and obligated flows to the facility
0.54536
h.
Percent of permitted flow used
30%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=r(A-D)
Design
Average
Approx.
Obligated,
Pump
Pump
Daily
Current
Not Yet
Total Current
Station
Station
Firm
Flow**
Avg. Daily
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / pf),
Flow,
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
MGD
MGD
Flow
Capacity***
Parmele
DQ ,
WQ0017304
0,3312
0.16385
0.0176
0
0.0176
0.14625
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
* * Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Pace I of 6
4 II1. Certification Statement:
I James Pittman certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I
ant the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
4
le of Signing Official
PAQP. ? of A
/y/ZO
Date
f �i Vl�:inri nS 1l,:ri;•t 'fir •. n+i r-. r•`
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Parmele
Project Name for which flow is being requested: 2018 CDBG Infrastructure Sewer Project
More than one FTSE may be required for a shigle project if die owner of the WWTP is not responsible for ali pump
stations along the roule of the proposed wastewater flow.
yt
I. Complete this section only if you are the owner of the wastewater treatment plant.
a.
WWTP Facility Name: Robersonville WWTP
`SE'pl
b.
WWTP Facility Permit #: NCO026042
All flows are in MGL4-, 9/qo. 4k.
e.
WWTP facility's permitted flow
1.8
h��� q�� p�a�
d.
Estimated obligated flow not yet tributary to the WWTP
0.00504
�9 at'o�
e.
WWTP facility's actual avg. flow
0.5333 (2018)
f.
Total flow for this specific request
0.00702
g.
Total actual and obligated flows to the facility
0.54536
h.
Percent of permitted flow used
30%
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm Daily Flow"
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, * (Firm / po,
Avg. Daily
Daily Flow,
Obligated Available
Number)
No.
MGD MGD
Flow, MGD
MGD
Flow Capacity***
The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Psue 1 of 6
III. Certification Statement:
I James Pittman certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Official Signature
l4wT'P 0 RC
Tide of Signing Official
Aorrn ? of A
T/lV/za
Date
tA
VRIV 1D3rOad
r,
13
(14
� •ram.` l � � � , ��
_
&
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting AIlocation: Town of Parmele
Project Name for which flow is being requested: 2018 CDBG Infrastructure Sewer Project
More than one FTSE may be required for a single project iftlte owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Robersonvilie WWTP
y
�cF�L
b. WWTP Facility Permit #: NC0026042 sFA
All flows are in MGD l
e.
WWTP facility's permitted flow
1.8
y e9i,, a
'' ��ZD
d,
Estimated obligated flow not yet tributary to the WWTP
0.00702
g ri�Laro
h.' p "
e.
WWTP facility's actual avg. flow
0.5333 (2018)
o,y ko°'�7y
f.
Total flow for this specific request
0.00504
e9iO aVse°r.
g.
Total actual and obligated flows to the facility
0.54536�b''
h.
Percent of permitted flow used
30%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP,,
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Average
Approx.
Obligated,
Pump
Pump
Daily
Current
Not Yet
Total Current
Station
Station
Firm
Flow**
Avg. Daily
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Finn / pf),
Flow,
Daily FIow,
Obligated
Available
Number)
No.
MGD
MGD
MGD
MGD
Flow
Capacity***
Parmele
DQ 1
WQ0017304
0.3312
0.16385
0.0176
0
0.0176
0,14625
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
* * Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer):
Downstream Permit Number:
Pace 1 of 6
III. Certification Statement:
I James Pittman certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
OR C.
Signing Official
PaaP') of A
Date
1164
N �-
T
PROJECT AREA
1161
Z