Loading...
HomeMy WebLinkAbout20081754 Ver 1_Information Letter_20101019 Eaves Perdue North Carolina Coleen H. Sullins Director October 19, 2010 J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection US Highway 25 DWQ Project 08-1754 TIP No. R-505 Henderson County Setzer: October 7, 2010, 1 inspected the construction work on US Highway 25 between Interstate 26 and NC hway 225 in Henderson County. Most all of the work is taking place at the south end of the project. Dee Freeman Secretary view of the sediment and erosion control program found that the program appeared to be in good shape. ase ensure that all sediment and erosion control structures are maintained and that seeding and mulching are formed as needed to protect downstream waters. Please refer to the attached copy of the inspection report additional comments regarding the inspection. you have questions, please call me at 828-296-4500. Sincerely, ' xz' " " ? F. A4-- Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental -Transportation Permitting Unit Mike Parker, Asheville Regional Office US 25 Inspection Letter October 2010 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 Customer Service: 1 A77623.6748 Internet: www.ncwaterguaiity.org An Equal Opportunity \ Affirmative Action Employer - r Q?? NCDENR Department of Environment and Natural Resources Division of Water Quality NorthCarolina Naturallb( DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: October 7. 2010 County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 08-1754 NW Permit # IP #: Project Name: Location of Project U S Highway 25-1-26 Connector R-505 U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited r Name of Waterway(s): Basin/ Subbasin: DWQ Site Visits for DOT Projects Background Info Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek, Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch, Jones Creek Broad 030501 Wetland Type: ?Isolated x?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-1l ?WS-V ?SB X?Class C ?ORW X?Trout ?WS-111 ?NSW X?HQW ?WS-I ?WS-fv ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts Authorized Stream Impacts Additional comments: X00 - 1110th acre ? UP to 1.0 acre ?< 150 linear feet ? in ill to 113 rd acre ?> 1.0 acre X?> 150 linear feet 1,346 linear feet Most all of the construction is on the south end of the project Maintain all sediment and erosion control devices. Please continue with seeding and matting as required to protect State surface waters. U5 Highway 25 Inspection October 2010