Loading...
HomeMy WebLinkAbout20201529 Ver 1_ePCN Application_20201214DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned * Version#* 20201529 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received IT $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office * Winston-Salem Regional Office - (336) 776- Select Project Reviewer* 9800 Sue Homevmod:eads\slhomewood Information for Initial Review 1a. Name of project: Rich Fork Heights 1a. Who is the Primary Contact?* Chuck Truby 1b. Primary Contact Email:* 1c. Primary Contact Phone:* chuckt@cptengineering.com (336)812-8800 Date Submitted 12/14/2020 Nearest Body of Water Rich Fork Basin Yadkin -Pee Dee Water Classification C Site Coordinates Latitude: Longitude: 36.018778-80.05547 Pre -Filing Meeting Information ID# Version 20201529 1 Pre -fling Meeting or Request Date* 11/4/2020 Attach documentation of Pre -Filing Meeting Request here:* DWR Pre -Filing Meeting Request Form.pdf 51.87KB A. Processing Information v County (or Counties) where the project is located: Forsyth Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: P Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): Ild. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 29 - Residential Developments Ile. Is this notification solelyfor the record because written approval is not required? For the record onlyfor DWR 401 Certification: For the record onlyfor Corps Permit: r 401 Water Quality Certification - E)press W Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: HPT Investment Holdings, LLC 2b. Deed book and page no.: DB 3511 PG 1504 2c. Responsible party: Andy Dondero 2d.Address r Yes r No r Yes r No Street Address 455 2nd Street S.E. 5th Floor Address tine 2 city State / Province / tegim Charlotesville Va Postal / Zip Code Country 22902 US 2e. Telephone Number: 2f. Fax Number: (434)245-4905 2g. Email Address:* andy.dondero@redlightmanagement.com C. Project Information and Prior Project History l^� 1. Project Information 1b. Subdivision name: (d appropriate) Rich Fork Heights 1c. Nearest municipality/ town: Forsyth F- 2. Project Identification 2a. Property Identification Number: 2b. Property size: 6882-77-3453 41.665 2c. Project Address Street Address 4024 N Main ST Address Line 2 city State / Province / Pagion High Point NC Postal / Zip Code Country Forsyth 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Rich Fork 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401030203 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Wooded Land surrounded by interstate highway to the north. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 1612-19 USGS MAP.pdf 219.2KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) SOILS MAP.pdf 1001.69KB 4f. List the total estimated acreage of all existing wetlands on the property: 3.23 4g. List the total estimated linear feet of all existing streams on the property: 2,826 4h. Explain the purpose of the proposed project:* Residential Subdivision 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The development of a 164 lot subdivision with streets, utilities, storm sewer and wet detention ponds. Equipment Used: Track Hoes, Bull Dozers , Pans, Dump Trucks 4j. Please upload project drawings for the proposed project. PCN-4.pdf 1.31 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2018-01914 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jay Lawson Agency/Consultant Company: Progress Environmental Group Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 11/7/2018 5d1. Jurisdictional determination upload SAW-2018-01914 (signed PJD).pdf 544.03KB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Open Waters F Pond Construction 2. Wetland Impacts r Buffers 2a1 Reason (?) 2b. Impact type * M 2c. Type of W.* 2d. W. name * 2e. Forested * 2f. Type of Impact Jurisdicition*(?)]2g. area W1 Fill P Headwater Forest W1 Yes Corps 0.059 (acres) W2 Sewer Line ��T Headwater Forest �W2 Yes Corps 0.030 (acres) 2g. Total Temporary Wetland Impact 0.030 2g. Total Wetland Impact 0.089 2h. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.059 3a. Reason for impact (?) 3b.lmpact type" 3c. Type of impact" 3d. S. name" 3e. Stream Type" 3f. Type of 3g. S. width 3h. Impact (?) Jurisdiction* i length* S1 Sanitary Sewer Temporary Other S1 Perennial Corps 13 Average (feet) 28 (lir�rfeet) S2 Coffer Dam Tem orar p y Other S2 Perennial Corps p 13 Average (feet) 10 (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 0 3i. Total stream and ditch impacts: 38 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 31. Total temporary stream impacts: 38 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The slopes are proposed to be 2:1 which is the steepest allowed. The pipe length is as short as possible to keep wetland impacts to the minimum amount possible. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Silt Fence will be installed to prevent erosion from entering wetlands 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SMWT) r Wetland Swale (higher SMWT) 9 Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: W Local Government r State Local Government Stormwater Programs W Phase II W NSW r USMP W Water Supply Please identify which local government stormwater program you are using. Greensboro Comments: v G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes f• No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website with verification by USACE. https://ecos.fws.gov/ecp0/reports/species-by-current-range-county?fps-37081 and https://ecos.fvvs.gov/ecp/ Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* http://mm.fws.gov/raleigh/species/cntylist/county.html with verification by USACE. Site is not near salt marsh, oyster reef, or sea grass beds. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* State Historic Preservation Office http://mm,hpo.dcr.state.nc.us/ with verification from the USACE 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * r Yes r No 8b. If yes, explain how project meets FEMA requirements: The sanitary sewer is underground and will have no impact on the flood elevation 8c. What source(s) did you use to make the floodplain determination?* FEMA Map No. 371010688200K, Dated March 16, 2009 Miscellaneous Comments Miscellaneous attachments not previously requested. SAW-2020-01620 (signed NWP).pdf 1.87MB Signature u * rJ By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Andy Dondero Signature Date 12/14/2020 REFi U%S MAD MAfX' KERNERWILLE, NG 201Q EN& I NEERI N& AND SURVEY I N S, INC kz LAND DEVELOPMENT GON5ULTINCG NGBEL5 FIRM LIGE*E NO, G-I315 4400 TYNIN& 5TREET HIGH POINT, NORTH CAROLINA 2-7265 PHONE: (336) 8I2-8800 - FAX: (336) SI2-S180 PROP05ED 5ANITARY 5ENER EXI5TIN6 5ANITARY 5ENER Rich Pork H®ights U565 QUAD MAP HIGH POINT, NO 5GALE: I" = 400' M sun 3EP r27N W3Yn Custom Soil Resource Report Soil Map E&M skKma 5�Elw 9aesaa 9M%M 5EM 7 p 5�U4 �114 0 50 100 200 3C0 4 240 400 900 12fl0 Map p 'NeG Matra CM -Er OxAdru&r.: wc584 B* Dm: UN Mm 17N nIMM 6 # 3P r27N1 3m T l' N �- , v 1v y i / �� vv��� v �v �� vv y v� vv T, glaa � AAV AAVA @"P�IRKSFORMILry r ITENf2 �/ 1 TUAAt1E L30' EASE A xoT sPA Rn wRMwLv > v v A eoLL THE oEl 1s, PAcessR'/ \ewE=Tow /xE \ ' - V V AA K7 T a aETUPL P MENrr T / \ \ \ \ �I \ \\ \ / I �EOEooK%UL,PoL'E1'. PER/ v vv 1 b/1 /iA / �9 \ V vv vvvvvvvv I V✓ li - 1 / / `a � / I Ilal ( / v �/ � y ice/ / / 1 v v ♦v v vv � yA`LL .�v v vvv vvvT A - / , vv - / luier=� vv of"o �"�,a��:`w�� =�E�� ® zs o"'a�.. / 6 a / _ 1 / /� p V �''�/ f �� U / / ✓ /O o vw v A A A T, Vv V AV / / f vvv A V A A /' A L, v v ♦vvv A�� v �m.�R�v /I y�;" o✓ � / / / / // / / / v, ' � � I w _/ m" Y / � A I / I � / � � '� vvv �� / VICINITY MAP 7- -A za'�, _ vwv V v V A I xas w,��K,ory / \ \�\\ \ \\ I \ \ — \ \ OWNER: / // / AvA A \ HO/4 eOi+D ///ice eves v y 1 k at °S vvvvv♦ v VI A� v�� v v v CDT /MPk'OIiED/LITV — — / / / ��VA AA \ V A / ��� :d V �� V V A A xvrlxvranrfxr xDmlNG&uc / / ' v Ramon %/ / I / / /� //I \ 1 •� i / _ ) \ v VAA \ �\ V� V A A A I 1 \ awunmsnur�vAaamz SITE INFORMATION: — — — _ ��'*o I. — — yr' 1 >(\ / / / /� / /' V y\� vA \ V QV A 1 T axoxeisaus4uos \ _ /" �� V vmxrncr:uu+GowExo SITEADDNESSES:�� / 4W4NMNn BT / // � �.s,(i \?y1 \\\O\\\ \\\ 1 \ \ \\ \ / \� / \� GSe m. DR R v // �� /�� /,�` !'%ri' v ov vvv A A y«<vvv �� l A v v vA L, v�r DEVELOPER PIN:6882AT-sir, eeszaa-m,s, / �r A mw xwes.Lm N. A /// zalsexEcxoxRDGF Dn ,eeezaamal, � V \ \\ \ \ \ \ MDNRGE .FlG DEED REFERENCE: / I IDh \ Fy \ O \\ \\ \� \�F \ \ \ / \\•.�� WN,A4T:,EFFGIIDd1EA 1083358PGase, DB33B8PGa4N,DB3 IPGZT55, l l \ l ` 'No I: / / / / \ / / �/ - / \ �,'���• \ \ \\ \\ \Ti \ / / Px0Ne396151lMx _ i t ��x \ \\ \ \M \ \ \\\ l -08 seas Pc mse, DB sles Pc 181s, De sno Pc lae. \ \ �ii i� \ / / / I/ / i� 1 f \ _ \ \ \\ \\\ `�, \ \ \ I / IDS 3511 PG 15Da b / \ /1l5 3 I / / '\`� / \ /\ y \ \ma �\�i� \ \\\ \ \\\ l I\ ' V ENGINEER: TarALTRACr AREA _ 1 J > ( <� < i ppQ� — / / / c 0 11 '� \ \\ \\\\\ \ 2 \ \ \ \ \ \ \ l \ \ TRacraawl ACS I 1 V I / V�V S / / ' "= 1 / //—/ A ! V �ya" y� �_+ ,ia ( \vvVA \ \� t� 'sl*, V A VA V v A �A \ V A urosrrxxosrtaErsumEnxc,ixc. TRACT B: 21.112 AQt �\ — / r / \mow \ �u�� \ ` I '�\\ \ \ C \ \ \ \ TRACT C: 35.TI4 ACi `J _ ��\ ( - I I �� I✓ �! 'C' / z L,\ •\ ° / \ \\\ \\ \ \ 11 \� L xiGx wixr, xexrsss \ / I g, _ / </ /rb EXISTING \ \ \ TRACT D: z3eG ACt \ / r(' ��e ,/�— / / /� �o \ 1 \\ \ \ \ \\ \ \ \ \ 8T vl ( v \ % / f' `s b�S0�n 3, \\� ���.� \\� �\ 1\\ \\ \ \�\ \\\ \\ \\ \\\ \ \ \ \ \ Fnz1s111mame0 PxosE nREn: �.� PxABE 4,8.83, ac _—.. / / / I^ / / / // /r\1 .\\\ \\�\\ \ 1 PxABEx:1,.101AG /I r / // / ' I / zz \ „G / �G�G \ 3 \ \ \ `� \ \\S1, TEMP. STREAM IMPACT i �l PxosEa,,.e3znc ,� 1 / A -� ( —�7 _� \ / �t v`a"aTME,Me TEL `LENGTH: 26 LF'�� �` �` J A Y V A A v \ / � vv v v�� A Ins /�, '� A � \ �.. vvim � v Av v / PREUMINARYBUBDMSIONBITEAAFJv41.855 AC! / l Q) RAY E3TATE� \\�\ 4 \ \\ \ \ TRACT A: T.553 AC3 /� \ ❑ ` ,? �1 �(1aVA A v \ � AAA REVISIONS \\ \\ \\ \\ \c1 'Z NUMBER OF LOTBINPINSE,: Be NUMBER OF LOTS IN PNASE x: 48 \ T u /r\\\\ \ \\\ \ \ \\ \ NUMBER OF LOTS IN PN E3: 48 / T.Em _1oE"s, 'vcnce,r — v \ \ �` \\\ '63q \ \ "� \ \ \ \ ytea _�--�) J v �, �rr�� y AREA= 1,327 SF pvvvvvv /` v e v v v v v v v v vvvv 149 4 I �VA VAS ,. 9�, maxV V A vv A v vvv p: 1as84 To'ru DENSlrn feaur.ee5•aeaow \ t�\ -- — 1 1 A ,zT� A A Av 7—f � ,/ �, --- V > I37 I I / A V v vvv_ EXISTNG VJID USE: SINGLE FAMLV l \ i / I /� // PROPOSED USE: SINGLE FAMLV (PHASE 1-9). MULhFAMILV (PHASE d) / I / � i / / FXI3TNGZ NING CZ RNY,8(ZA 1P18) (OUTBIDE CORE CITY) / / —� / / / / / �\ ( \ \ \ /( 1 \ I / \ `— 108 / ,� �. `. \ \\ \ \ \\\ \\ \TT, I /) / TH15 OPEA. ro BE IOEEoeP To — �/ A � � 1 A © / �r`1 / / / . / . IA � � wv A� ,�A�(M V �U o _ Ia I � I I v v vv vvVv SUBJECT PROPERTY IS LOCATEDMnHINAFL000 ZONE II \ ftONALD B.d SARAH N. / x.. dz-n�wxmry \ MAP / i 6 I / (/�J9 "� I 1 1 yi' �' / \ ,B/ / / \\\. \ \`� ` ACCORDINGTOFEMA MAP N0.D 0111114A L OATEOMARCH 18, 2009- 1 / MARTIN / r�z��i \ 6EH 5 T \ Q99� \\ \\ �� \V A "T v♦ �� BOUNDMYINFORMATON WAS PROVIDED BYCPT ENGINEERINGIWD IIO.a IH Ac.1 / \ \ �. — / 134 O 0 / 5$ / \, 106 \ \\ SURYEYING,INC. \ 'Y I \ Z EYIS f� \ \ \{ \ / v � � V �t �y vA v/Q�/ �� vv �. y vv v l RA XtIL E-IrATE O/NN R A I V AA v I vw 1 1 IaD v / / � A A\ TOTAL�oF ETB: aeoa'LF:lMteuc)(PpasE,l4) I / / / v i ✓� ' /A / 63 Xis \11 / —rEl A AdW _ 1 \ VA TOTALAREA DED TED ly R1BUI� RMf. B. AC (P 1 3) 4 Ol}L�R Z /511 S-A S�f�.� / / ^ o� \ \ \ _ �\ I 135 13p (� / J 61 \ /� �/ / I I \ / \ \ \\ I \ UIEROIDE OF N� � / \ \\ \ \ �i _zo���� V \ V 'r I.: ZONING CONDITION NOTES: / TASSITE G—MEETZONINGCONDI110NSOFC2 RICZA-8) TNISLOT ISA NON &IILDABLE TRncTn. lAT srnNonnos Tor ane SHOULD ee 8 \ �- I / ( \ /�� ' 65 Il ^yq \ K I ✓ l r j i Irv,a ! J 1 — 136 w/ \\/ — / •31 I• gill, I\\ I \I \T \ I \ \ TRACT BANDG RM-183TANOPA03 �cOMBIMED WITH RONALD 8.8 ) T / 4 I\ / \ I ��/ i / �\ / �i'i T 1 \�\\\ \ \ \\\ i� / \ s A eeR,; �.q RTY �R v `v A v ,11vv�v����vv `y v y v / /vvv ��� o _ l I c V \ t\ Q v I \ �KF rI>v ✓eai oF� /Y/j' _ ry I V v v �.66g / V A y 1 / I I ia��' was Q vvv — � � I AA/ � ' � �VI 1 11 AVA AA�AA 1 1�� �. I I � lI � � A AV I l l.l.. � h I \ / \ lias laa O `��� li� �-, � � \ \\ \.'� 1 1 "� \ \ 1 \ \ ss _ _ — ^ ^�15,T„I / / \ O� J ,-� 1 1\ \\ \\ \ \ \ \ Y� £«..� 8m \ / 1 tI \ \ Z \\ \ \ \ \ \ Isz I ISI I \ 1 �— (� \ \ 67 /� \ � I I \ \ \\�� \ \ $A\�� I 7� b \ I \ I 1 / \ �2p� sTe• m O56, \ �� \ \ / 1 A vA, 3 K l \\ COMMON ELEMENT o,p Pc� Ise / �°` \ _ ^^°\ \\ 85 \ � y \ \ \\ 4l \ �O� (]— w / VQ eiR -}�(' / —I 11 RK I I 36 I I I C \/ /'\ \O RV \ \\\\ ,/' \� \ \ _ E TO AcauIRE'L P�TOw2✓NR / / ISI \ Rv \ 70 „83 1 I \ \ \\ N iss ///---��� aN JR Tl _L \� H�0 I� �I,ZZ' 23 I ^V_ ( �/ Q / �:(\ A A A'\� �� t4 v ✓ �,� me Easr sI�E � A ,� AVEILLBEREM VT W1 WETLAND IMPACT 1�� v� vv Y 1 'A - AREA E VE WILL BE REMovFTDR�WITry / V I I � � � I I 35 I �}- rf rvew RE,uIeN ENT I 1 � (I , / s s-atevv�P / 1 v v m �4i Ft / a � v� � I `• ; v A 31 1 v vv ,1 � � � � / v91 o��� v /30 �I I � I v as (% � 76 77 � �{ !► - � � � I v v 0r I < 11 r bE've✓aEME T sdPLL REA ePUEw WeTRAr CALL N oO T AL ANB �msTAu An ensTeouNo TEST \ a / Q �, / 1 / �� �^ \ 1 A A V / / / �9 ,�, ✓ -- ruRN LAN oN ry. VAIN 5TREET. vv v / / r n 1 ' �• / / II A / /A V v v / (/�,/ I I ur�Ac�e P,4,e°r cc v III A _ K T - v �� // � o � P.,..bo� v I I ��`�/ � I � I' I I 1 I V� A AVA I�:�a��---� — � �v� —�� / / / I v o�. iea� -�i� � I I I ✓� I I I � ) �\I IvI /� / ) � y�J I/i/I / Ala Imo' �.: ♦ _ _ // I v I I A AV\.w.a-;� -�r�._ 7-- --�_ / �l-so� / _ _/ I/ ISCALE: I�� = 100' /4// 4 5\ \ 6 ��— l / \ i = // / �CSi O �F �/ �v) V / - �_ v� / ��y o / i �v >o > /vim ��L DATE )v,/y7V v am' e[-///// / 9/OI/20 ���`�®� GRAPHIC SCALE I I �` it v i�1 v vv w v I v�v v% / vv n �rl/ /' PROJECT: 1612-19 v 1V A 'Q11 A / vv� I A Vv v — �v 'v vA A o I VI �VI v /r ///�/ -�/ / //yy A 11 1 AV -VA\�-C�A v ��O_ !"7' //- v vC=%v v A A v vvV Av v\ VA J q+,b,�VV/ A Y DRAWN i�Y: TGL / A VCC��--ll•/ �n //, a ( IN FEET) SHEET I inch = 100 ft. ID#* 20201529 Version* 1 Regional Office * Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 10/20/2020 Contact Name* Chuck Truby Contact Email Address* chuckt@cptengineering.com Project Name* Rich Fork Heights Project Owner* HPT Investment Holdings Project County* Forsyth Owner Address: Street Address 455 2nd St. SE 5th Floor Address Line 2 aty State / Province / Region Charlottesville VA Postal / Zip axle Country 22902 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification Regular Express F- Individual Permit F- Modification F Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below.* Propose 0.059 acres of wetland impacts and temporay wetland impact of 0.03 acres for a sewer line and 38' of temporary stream impacts for a sewer line crossing. Please give a couple of dates you are available for a meeting. 10/28/2020 10/29/2020 11 /4/2020 Please attach the documentation you would like to have the meeting about. PCN revised exhibits 9-22-20.pdf 329.39KB PCN Submittal Package 9-14-2020.pdf 8.55MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/20/2020