HomeMy WebLinkAbout20201951 Ver 1_ePCN Application_20201216 I I DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
October 26,2020 Ver 3.3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6 Yes
✓ No
Is this project a public transportation project?*
0 Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20201951 1
Is a payment required for this project?*
✓ No payment required
6 Fee received Reviewing Office*
✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
1a.Name of project:
Cascade Lake Road,Slide Repair
1a.Who is the Primary Contact?*
Kevin Barnett
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
khbarnett@ncdot.gov (828)333-1188
Date Submitted
12/16/2020
Nearest Body of Water
Little River
Basin
French Broad
Water Classification
C
Site Coordinates
Latitude: Longitude:
35.223114 -82.636398
Pre-Filing Meeting Information
ID# Version
Pre-fling Meeting or Request Date*
11/2/2020
Attach documentation of Pre-Filing Meeting Request here:*
Pre-notification.pdf 37.71KB
A. Processing Information C^U
County(or Counties)where the project is located:
Transylvania
Is this a NCDMS Project
✓ Yes r No
Is this project a public transportation project?*
✓ Yes r No
Is this a NCDOT Project?*
✓ Yes r No
(NCDOT only)T.I.P.or state project number:
WBS#(2)
DF 17014.2088011
1a.Type(s)of approval sought from the Corps:
fJ Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
r No
lb.What type(s)of permit(s)do you wish to seek authorization?
fJ Nationwide Permit(NWP)
r Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
C Yes rNo
Nationwide Permit(NWP)Number: 03-Maintenance
NWP Numbers(for multiple NWPS):
Id.Type(s)of approval sought from the DWR:
17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual Permit
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes r No
For the record only for Corps Permit: r Yes r No
If.Is this an after-the-fact permit application?*
✓ Yes r No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
CYes rNo
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
lh.Is the project located in any of NC's twenty coastal counties?
CYes rNo
1j.Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
Id.Who is applying for the permit?
r Owner 17 Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes r No
2.Owner Information
2a.Name(s)on recorded deed:
NC Department of Transportation
2b.Deed book and page no.:
2c.Responsible party:
2d.Address
Street Address
253 Webster Rd
Address Line 2
Oty State/Rovince/Pegion
Sylva North Carolina
Postal/Zip Code Country
28779 US
2e.Telephone Number: 2f.Fax Number:
(828)586-2141 (828)586-4043
2g.Email Address:*
khbarnett@ncdot.gov
3.Applicant Information(if different from owner)
3a.Name:
Kevin Barnett
3b.Business Name:
3c.Address
Street Address
253 Webster Rd
Address Line 2
Qly State/Rovince/R3gion
Sylva North Carolina
Fbstal/Zip Code Country
28779 US
3d.Telephone Number: 3e.Fax Number:
(828)333-1188 (828)586-4043
3f.Email Address:*
khbarnett@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
lb.Subdivision name:
(if appropriate)
1c.Nearest municipality/town:
Etowah
2. Project Identification
2a.Property Identification Number: 2b.Property size:
9515-61-1020-000
2c.Project Address
Street Address
Cascade Lake Road
Address Line 2
(Sty State/Bovine/legion
Brevard North Carolina
Fbstal/Zip Code Country
28768 US
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Little River
3b.Water Resources Classification of nearest receiving water:*
C
3c. What river basin(s)is your project located in?*
French Broad
3d.Please provide the 12-digit HUC in which the project is located.
060101050205
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Cascade Lake Rd.is a connector from the Brevard area to South of Dupont State Forest.The NC DOT maintains this road from edge of road to edge of road.In late October,2020,
about a third of this 18'wide road slid making passage unavailable.Due to the narrow work area and lack of proerty access off out maintained ROW,we will have to temp divert a
stream across Cascade Lake Rd above the soil nail activity,and fill the stream channel(road side ditch/perennial stream)with clean railroad ballast to have a platform for the
equipment to sit on.An existing 20 LF 30"cmp that has failed will be replaced with the same,and the outlet(now falling onto a bedrock slab)will outlet through the newly constructed
retaining wall onto the same rock slope.
In summary,the impacts will be temporary in nature.XX LF of dewatered channel,filled with railroad ballast,which will be cleared of stone at the end of the project,and the replacement
of a 20 LF 30"cmp(all in an unnamed trib to the Little River)
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
✓ Yes r No r Unknown
4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR)
USGS.Topo.pdf 732.17KB
4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR)
SoilSurvey.pdf 3.01MB
4f.List the total estimated acreage of all existing wetlands on the property:
None at this specific site
4g.List the total estimated linear feet of all existing streams on the property:
150'
4h.Explain the purpose of the proposed project:*
To rebuild Cascade Lake Rd.and return it to a safe travel condition.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
Direction bore rig,2 track-hoes,and miscellaneous small equipment.
4j.Please upload project drawings for the proposed project.
200626NC01-C-DT.pdf 1.38MB
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
✓ Yes G No r Unknown
Comments:
Onsite determinations made by qualified staff.
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
✓ Preliminary f Approved r Not Verified C Unknown C N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known): Kevin Barnett
Agency/Consultant Company: NC DOT
Other:
5d1.Jurisdictional determination upload
6. Future Project Plans
6a.Is this a phased project?*
✓ Yes f No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
None are anticipated.
D. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
r Wetlands fJ Streams-tributaries r Buffers
r Open Waters r Pond Construction
3.Stream Impacts
3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
Si dewatering Temporary Dewatering UT to Little River Perennial Both 1 100
Average(feet) (linear feet)
32 culvert replacement Temporary Culvert UT to Little River Perennial Both 1 0
Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
0 100
3i.Total stream and ditch impacts:
100
3j.Comments:
E. Impact Justification and Mitigation
1.Avoidance and Minimization
la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The dewatering was the minimum necessary to provide a safe work footprint for the equipment necessary to repair the road failure.The culvert
replacement was necessary due to the bottom of the culvert being rotten and to prevent future failures.
1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
This is the absolute minimum amount of impact necessary to put the road back.
2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
✓ Yes ( No
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Impacts are temporary in nature.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
✓ Yes R No
If no,explain why:
There will be no increase in impervious surface.Stormwater will be handled as was pre-project.
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
6 Yes C No
Comments:
Due to a lack or property access,all measure that were possible were installed.The overall project does not increase impervious area,and contributes no more storm-water than pre-
project.The current design will cant to road to drain towards the existing stream/roadside ditch to keep it off the newly completed work.
G. Supplementary Information
1. Environmental Documentation
1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
( Yes r No
1b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPAISEPA)?*
✓ Yes a No
Comments:*
Due to amount of expenditure,further review not required.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
✓ Yes f No
2b Provide an explanation of the violation(s):
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
✓ Yes a No
3b.If you answered"no,"provide a short narrative description.
All impacts are temporary to return travel to pre-project conditions.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes r No 6' N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
( Yes r No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
( Yes r No
5c.If yes,indicate the USFWS Field Office you have contacted.
Asheville
5d.Is another Federal agency involved?*
✓ Yes (' No r Unknown
5e.Is this a DOT project located within Division's 1-8?
✓ Yes 6- No
5f.Will you cut any trees in order to conduct the work in waters of the U.S.?
c Yes r No
5g.Does this project involve bridge maintenance or removal?
✓ Yes 6- No
5h.Does this project involve the construction/installation of a wind turbine(s)?*
✓ Yes allo
5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.?
6 Yes r No
If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property.
Proposal Cascade Lake Road.pdf 284.7KB
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Consultation with Ms.Holland Youngman was performed to determine what measures were necessary.
Consultation Documentation Upload
21-071_DOT_Cascade Lake Rd slide Conc_Transylvania.pdf 282.66KB
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes 6.
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA website
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes f No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCSHPO
7c.Historic or Prehistoric Information Upload
NCSHPO.comments.pdf 789.18KB
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-yearfloodplain?*
r Yes ( No
8c.What source(s)did you use to make the floodplain determination?*
Website provided.County GIS Maps
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature u
*
fJ By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Kevin H Barnett
Signature
hfr rr
Date
12/16/2020