HomeMy WebLinkAbout820269_Sludge Survey (Testing Dates)_20191031 .Jnu`Ir,r�
12:1
ROY COOPER ; ,.
Governor .� � t:��`��� ,,
.µ. . REGEWED
MICI�iAEL S.REGAN � .�'�� -- �` ®EQ1DV1F�
Secretary �aw�v�_
LINDA CULPEPPER NORTH CAROLINA
Director Environmental Quality I v A�O V 04 2019
October 31, 2019
FAYETrEUI( RO REGIONAL OFFICE
Anthony E. Darden
PED Finishing Farm
306 Timberlake Dr
Clinton,NC 28328
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS820269
PED Finishing-Farm
Animal Waste Management System
Sampson County
Dear Anthony E. Darden:
The Division of Water Resources (Division)received your sludge survey information on
September 20, 2019. With the survey results, you requested an extension of the sludge survey
requirement for Lagoon 3 only at PED Finishing Farm. Due to the amount of treatment volume
available, and the rate of sludge accumulation for the lagoon;the Division agrees that a sludge
survey is not needed until December 31,2024.
The next sludge survey for Lagoon 3 at PED Finishing Farm should be performed before
December 31,2024.Please retain this letter and keep it with your farm records for reference:
Please call me at(919) 707-3702 if you have any questions.
Sincerely,
P "
Ramesh Ravella
Animal Feeding Operations Program
cc: Fa-y tt t le egta al c Of , Water Quality Regional Operations Section
Permit File AWS8220269�
D
E North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11636 Mail Service Center I Raleigh,North Carolina 27699-1636
o +d< - ono er' 919.707.9000