Loading...
HomeMy WebLinkAbout820250_Structure Evaluation Inspection_20180926 • •, -Structure Evaluation inspection • Facility Nurnb'er: Date:._ Time in: JO 45-7 Time out: Farm Name: //we'll Farm 911 address: Owner Name • ._ Phone - - -• Facility Contact: _ • . Onsite Representative: , IntegratOrt , Certified Operator; Cert. Number Is storage capacity less than adequate? Yes ,Nlo •• '. • ' - If yes is waste level into the structural freeboard? -Yes Was non-compliant level reported to DWR POA received ' Structure: 1 2 ' 4 5 6 Identifier: Spillway? Designed Freeboard (in.): /9 ' • Observed Freeboard (in.): /lr / .• Are there any immediate threats to the integrity of any of tbe'structUrg • observed? Yes No • Do any structures lack adequate markers as required by the perthit? NO • Does any part of the waste,„rbahagement system nee-cl repair Y e's - No ' • — Condition of field's „.. • . . - Condition of receiving crop Comments: •