Loading...
HomeMy WebLinkAbout820250_Structure Evaluation Inspection_20180927 /- • Structure‘Evaluation InSpection Ae!Facility Number: . Date: • Time in: V-((c Time out: /,'/f Farm Name: /7"P:77d/ • Farm 91.1 address: Owner Name: • Phone • Facility Contact: Onsite Representative: , Integrator': -Certified Operator: . Cert. Number' Is storage capacity less than adequate? Yes , No If yes is waste level into the structural freeboard? Yes No • Was non-compliant level reported to DWR - POA received Structure: 1 .2 3 • 4- 5 6 • Identifier: Spillway? • Designed Freeboard (in.): Observed Freeboard (in.): / 67 /ey - - Are there any immediate threats to the integrity of of the structures • observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No •• , Does any part of the Wast ...17jahagementsystem need repair-Yes' • No Condition of field's • Condition of receiving crop Comments: • •