HomeMy WebLinkAbout820242_Structure Evaluation Inspection_20181001 Structure Evaluation Inspection
Facility Number: I --
A_ • Date.: te,—7
Time in: /,`5D Time out:
Farm Name: F1 ///q6Aii,-;;;Atni Farm 911 address:
Owner Name: .5'fici7 Phone
Facility Contact:
Onsite Representative: Integrator:
• Certified Operator: Cert. NuMber
Is storage capacity less than adequate? Yes •--. No • •
,..Atelete7 IL e, /049A-.1-
If yes is waste level into the structuralfreeboard? Yes - No /
Was non-compliant level reported to DWR ry-cs POA received
Structure: 1 2 3 4 - 5 6
Identifier: hiacA)4-y 0,4
Spillway?
d`, Designed Freeboard (in.): /9—
Observed Freeboard (in.): L2_, /;.; a•2 If
) Are there any immediate threats to the integrity of any of the structures vr,
observed? Yes
No
• 73/4#,„7./(...r,k,r/
Do a'ny structures lack adequate markers as required by the permit? Yes:/ No
6-r-0,
Does any part of the waste,:r46hagement system need repair Yes No
Condition of field's
Condition of receiving crop tu )9-2'.1A -- 4,D fry Lie)(Jo qJ
Comments: itiall.-01 th • tt)62 . //'fb/17j
.1,31•7/47,0re, a ,,jbo •:::-•
• ••
•