Loading...
HomeMy WebLinkAbout820242_Structure Evaluation Inspection_20181001 Structure Evaluation Inspection Facility Number: I -- A_ • Date.: te,—7 Time in: /,`5D Time out: Farm Name: F1 ///q6Aii,-;;;Atni Farm 911 address: Owner Name: .5'fici7 Phone Facility Contact: Onsite Representative: Integrator: • Certified Operator: Cert. NuMber Is storage capacity less than adequate? Yes •--. No • • ,..Atelete7 IL e, /049A-.1- If yes is waste level into the structuralfreeboard? Yes - No / Was non-compliant level reported to DWR ry-cs POA received Structure: 1 2 3 4 - 5 6 Identifier: hiacA)4-y 0,4 Spillway? d`, Designed Freeboard (in.): /9— Observed Freeboard (in.): L2_, /;.; a•2 If ) Are there any immediate threats to the integrity of any of the structures vr, observed? Yes No • 73/4#,„7./(...r,k,r/ Do a'ny structures lack adequate markers as required by the permit? Yes:/ No 6-r-0, Does any part of the waste,:r46hagement system need repair Yes No Condition of field's Condition of receiving crop tu )9-2'.1A -- 4,D fry Lie)(Jo qJ Comments: itiall.-01 th • tt)62 . //'fb/17j .1,31•7/47,0re, a ,,jbo •:::-• • •• •