Loading...
HomeMy WebLinkAbout820242_Plan of Action (POA)_20180806 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82 - 242. County: Sckm ..acility'Name: De t-cleU . Hotkle.berr 1Jt;ll, F ve. i)011\ 5 Certified Operator Name: Sidfi v Be imA . Operator# ac 5ZIA- 1. Current liquid-level(s) in inches as measured from the current liquid level In the lagoon to the lowest point on the top of the darn for lagoons without.spiliways; and from the current liquid level - • in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 i let,ern-j Fwe. Lagoon Name/Identifier(ID): DeerC4A 1.1;11' ' Spillway(Yes or No): lyo At" Level (inches): is . ' ' 15 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to-off site locations.- Volume and PAN content of waste to pumped and`hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number'acres and receiving crop information. C. and d secure approval.from the Division of Water Quality,prior to transfer of waste " to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated: -attach a complete schedule with corresponding animal,units and dates for depopulation -if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8- i I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct. StcsuNcl Phone: e110- 3 5-6622, Facility Owner/Manager(print) • - vke - Date: 8-6-i Fa Owner/ ana er(signature)Y 9 ( 9 ) PoA Cover Page 2121100 T e " PLAN.OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY(30) DAY DRAW DOWN PERIOD • 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Stricture Name/Identifier(1D): C e r$i e,\A 2. Current liquid volume in 25.yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker I a inches b. designed 25 yr./24 hr. storm & structural freeboard 2°,9i inches c. line b.- line a '(inches in red zone) = . .2 n inches d. -top of dike surface area according to design , 24,00 b ft2 (area at below structural freeboard elevation) e_ line c x line d x 7.48 gallons =. 433 gallons • 12 • ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 eO days g. volume of waste produced according to structural design 191046 ft3 h. actual waste produced = current herd # x line g = 19 O' ft3 2� gtg s . certified herd# - ' B- i. volume of wash water according to structural design O ft3 j. excess rainfall over evaporation according to design ' 14,000 • ft3 k. (lines h + i +) x 7.48 x '30 days = 44.1 2OO gallons line f . . 4. Total PAN to be land applied during draw down period C-r.1 I... current waste analysis dated 6- 5- 16 2.28 - lb/1000 gal. m. (lines e + k) x line I = l lb PAN 1000 acE tva 4e. scam pke Submpiled it, SCAw.1 &Ll COOu4j 4 $tbiA c,�eve 6A IS ZEPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE al. TOTAL POUNDS OF PAN STORED'WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY(30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(1D): IA ue..0,)e.r r R t` 2. Current liquid volume in 25 yr.124 hr: storm storage & structural freeboard a. current liquid level according to marker 1 inches b. designed 25 yr./24 hr. storm & structural freeboard ao.a1 inches c. line b - line a (inches in red zone) = 5. \. inches d. top of dike surface area according to design 2, oOO ft2 (area at below structural freeboard elevation). ` e. line c x line d x 7.48 gallons = - 88 Zla� gallons 12 ft3 1 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design l gO days g. volume of waste produced according to structural design _n,645 . ft3 h. actual waste produced =, current herd # x line g = 10/'18 i ft3 a i 5 6° 0.S certified herd# i. volurne of wash water according to structural design Cs - ft3 • j. excess rainfall over evaporation according to design 3 1115 ft3 k. (lines h + i 1) x 7.48 x 30 days = ' 311153 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6-5-l6 • Z.: Ib/1000 gal. m. (lines e+ k) x line 1 = 281A lb PAN 100__0i p NOTE . w45'te Saw\Pk st,Sw6 \e 10 5c C�,1A el.-Ievat-o Do i,t. _ f 1 can 8-1 1e:, ?EPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR-FACILITY PoA (30 Day) 2121/00 PLAN OF ACTION,(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY(30).DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. •Structure Name/Identifier(ID): F 1(,) c S 2. Current liquid:volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker n inches b. designed 25 yr./24 hr: storm & structural freeboard 19 inches c. line b-dine a (inches in red zone) = 2_ inches d_ top of dike surface area according to design' 23 drI.5 ft2. (area at below structural freeboard elevation) e. line c x line d x 7:48 gallons = Z9 BSc\ gallons 12 ' ft3 J ' 3_ Projected volume of waste liquid.produced during'draw down period f. temporary storage period according to structural design l 8O days g. volume of waste produced according to structural design 1 q)OL4 ft3 • h. actual waste produced = current herd # x line g CAB ft3 z6b° 0.9 s certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design I 13r 000 ft3 k. (fines h + i +O x 7.48 x 30 days =, • Ali ZOO gallons .�� line f 4. ..Total PAN to be land applied during draw down period' I. current waste anal sis:dated 6_5 - -. �- Y Ib/1000 gal m. (lines e+ k) x line l = ' ' 10 cA lb PAN 1000 �bTE saw pies- ob e� '� S01%1)56� CoL>AA �� ei��Fo�n ,Er/eiA ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE J. TOTAL POUNDS OF PAN STORED;WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY . PoA (30 Day) 2/21/00 1.. structure ID: D ee,-f,e\A line m = 1 9'a lb PAN 2: structure ID: H ockteb'err t ; l k line m = Z.8 {- lb PAN 3. structure ID: Ft e Fesi vnks - line m = l CVc'1 lb PAN 4. structure ID:. line m = lb PAN • 5.. structure ID: ' line m _ lb PAN 6. structure ID: line m = lb PAN n. tines1 + 2+3 +4 + 5+ 6 = , - 586 lb PAN III. TOTAL PAN 'BALANCE REMAINING FOR AVAILABLE CROPS DURING30 DAYDRAW DOWN • PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE_ APPLIES DURING THIS 30 DAY PERIOD. o. tract# ' p. field # q. crop r. acres . s. remaining t TOTAL PAN 'u. IRR-2 PAN BALANCE application balance FOR FIELD window' (lb/acre) (lbs.) column r x s 131 SOybeethS 1 .45 132.12. l 91. as So be ws 2.et 2 ' q 1.'36 ?6,6,11 33 siy s- 2,1):2 1O5, 12. ' SO .95 - H l Soybeans 2•a►5 '(O6,.s6 315.2.1A- - 14 2. Say be 4 ns -a,25 106.4 2 345,s-7. , 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = ' I4-2.6 lb. PAN IV. FACILITY'S"PoA OVERALL PAN BALANCE PoA(30 Day) 2/21/00 r a w. Total PAN to be land applied (line n from section II) = SBA lb. PAN x. Crop's remaining=PAN balance (line v from section III) = 1.L4 2,6 lb. PAN y. Overall PAN balance .(w -x) = 8L4® lb. PAN piney must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be. included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: • • PoA(30'Day) 2/21/00