HomeMy WebLinkAbout820242_Plan of Action (POA)_20180806 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82 - 242. County: Sckm
..acility'Name: De t-cleU . Hotkle.berr 1Jt;ll, F ve. i)011\ 5
Certified Operator Name: Sidfi v Be imA . Operator# ac 5ZIA-
1. Current liquid-level(s) in inches as measured from the current liquid level In the lagoon to the
lowest point on the top of the darn for lagoons without.spiliways; and from the current liquid level
- • in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
i let,ern-j Fwe.
Lagoon Name/Identifier(ID): DeerC4A 1.1;11' '
Spillway(Yes or No): lyo At"
Level (inches): is . ' ' 15 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to-off site locations.- Volume and PAN content of waste to
pumped and`hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number'acres and receiving crop information.
C. and
d secure approval.from the Division of Water Quality,prior to transfer of waste "
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated:
-attach a complete schedule with corresponding animal,units and dates for depopulation
-if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 8- i
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability,the information is accurate and correct.
StcsuNcl Phone: e110- 3 5-6622,
Facility Owner/Manager(print)
• - vke - Date: 8-6-i
Fa Owner/ ana er(signature)Y 9 ( 9 )
PoA Cover Page 2121100
T e "
PLAN.OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY(30) DAY DRAW DOWN PERIOD
•
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Stricture Name/Identifier(1D): C e r$i e,\A
2. Current liquid volume in 25.yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker I a inches
b. designed 25 yr./24 hr. storm & structural freeboard 2°,9i inches
c. line b.- line a '(inches in red zone) = . .2 n inches
d. -top of dike surface area according to design , 24,00 b ft2
(area at below structural freeboard elevation)
e_ line c x line d x 7.48 gallons =. 433 gallons
• 12 •
ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 1 eO days
g. volume of waste produced according to structural design 191046 ft3
h. actual waste produced = current herd # x line g = 19 O' ft3
2� gtg s . certified herd# - ' B-
i. volume of wash water according to structural design O ft3
j. excess rainfall over evaporation according to design ' 14,000 • ft3
k. (lines h + i +) x 7.48 x '30 days = 44.1 2OO gallons
line f . .
4. Total PAN to be land applied during draw down period
C-r.1
I... current waste analysis dated 6- 5- 16 2.28 - lb/1000 gal.
m. (lines e + k) x line I = l lb PAN
1000
acE tva 4e. scam pke Submpiled it, SCAw.1 &Ll COOu4j 4 $tbiA c,�eve
6A IS
ZEPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
al. TOTAL POUNDS OF PAN STORED'WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY(30) DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(1D): IA ue..0,)e.r r R t`
2. Current liquid volume in 25 yr.124 hr: storm storage & structural freeboard
a. current liquid level according to marker 1 inches
b. designed 25 yr./24 hr. storm & structural freeboard ao.a1 inches
c. line b - line a (inches in red zone) = 5. \. inches
d. top of dike surface area according to design 2, oOO ft2
(area at below structural freeboard elevation). `
e. line c x line d x 7.48 gallons = - 88 Zla� gallons
12 ft3 1
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design l gO days
g. volume of waste produced according to structural design _n,645 . ft3
h. actual waste produced =, current herd # x line g = 10/'18 i ft3
a i 5 6° 0.S certified herd#
i. volurne of wash water according to structural design Cs - ft3
•
j. excess rainfall over evaporation according to design 3 1115 ft3
k. (lines h + i 1) x 7.48 x 30 days = ' 311153 gallons
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6-5-l6 • Z.: Ib/1000 gal.
m. (lines e+ k) x line 1 = 281A lb PAN
100__0i p
NOTE . w45'te Saw\Pk st,Sw6 \e 10 5c C�,1A el.-Ievat-o Do i,t.
_ f 1 can 8-1 1e:,
?EPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE
il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR-FACILITY
PoA (30 Day) 2121/00
PLAN OF ACTION,(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY(30).DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. •Structure Name/Identifier(ID): F 1(,) c S
2. Current liquid:volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker n inches
b. designed 25 yr./24 hr: storm & structural freeboard 19 inches
c. line b-dine a (inches in red zone) = 2_ inches
d_ top of dike surface area according to design' 23 drI.5 ft2.
(area at below structural freeboard elevation)
e. line c x line d x 7:48 gallons = Z9 BSc\ gallons
12 ' ft3 J '
3_ Projected volume of waste liquid.produced during'draw down period
f. temporary storage period according to structural design l 8O days
g. volume of waste produced according to structural design 1 q)OL4 ft3
•
h. actual waste produced = current herd # x line g CAB ft3
z6b° 0.9 s certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design I 13r 000 ft3
k. (fines h + i +O x 7.48 x 30 days =, • Ali ZOO gallons
.�� line f
4. ..Total PAN to be land applied during draw down period'
I. current waste anal sis:dated 6_5 - -. �-
Y Ib/1000 gal
m. (lines e+ k) x line l = ' ' 10 cA lb PAN
1000
�bTE saw pies- ob e� '� S01%1)56� CoL>AA �� ei��Fo�n ,Er/eiA
?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
J. TOTAL POUNDS OF PAN STORED;WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY .
PoA (30 Day) 2/21/00
1.. structure ID: D ee,-f,e\A line m = 1 9'a lb PAN
2: structure ID: H ockteb'err t ; l k line m = Z.8 {- lb PAN
3. structure ID: Ft e Fesi vnks - line m = l CVc'1 lb PAN
4. structure ID:. line m = lb PAN
•
5.. structure ID: ' line m _ lb PAN
6. structure ID: line m = lb PAN
n. tines1 + 2+3 +4 + 5+ 6 = , - 586 lb PAN
III. TOTAL PAN 'BALANCE REMAINING FOR AVAILABLE CROPS DURING30 DAYDRAW DOWN •
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE_ APPLIES DURING THIS 30 DAY PERIOD.
o. tract# ' p. field # q. crop r. acres . s. remaining t TOTAL PAN 'u.
IRR-2 PAN BALANCE application
balance FOR FIELD window'
(lb/acre) (lbs.)
column r x s
131 SOybeethS 1 .45 132.12. l 91.
as So be ws 2.et 2 ' q 1.'36 ?6,6,11
33 siy s- 2,1):2 1O5, 12. ' SO .95 -
H l Soybeans 2•a►5 '(O6,.s6 315.2.1A- -
14 2. Say be 4 ns -a,25 106.4 2 345,s-7. ,
'State current crop ending application date or next crop application beginning date for available receiving crops
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = ' I4-2.6 lb. PAN
IV. FACILITY'S"PoA OVERALL PAN BALANCE
PoA(30 Day) 2/21/00
r a
w. Total PAN to be land applied (line n from section II) = SBA lb. PAN
x. Crop's remaining=PAN balance (line v from section III) = 1.L4 2,6 lb. PAN
y. Overall PAN balance .(w -x) = 8L4® lb. PAN
piney must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be.
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
•
•
PoA(30'Day) 2/21/00