Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820242_Plan of Action (POA)_20180917
PLAN OF ACTION (PoA) FOR HIGH,FREEBOARD AT ANIMAL FACILITIES Facility Number: S 2- - Z.*2- County: 5Gq IA P.50t'1 .•acility Name: 0 e.e.rct��� t �uc.k`e c rcj C1',1\ Fhle POI►? S Certified Operator Name: S tf9Tleti Operator# 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 lio�►;IP .rrl Five Lagoon Name/Identifier(ID): Over ielg 1I Pc,)Kk5 Spillway (Yes or No): hL o go g O Level (inches): 2 a . 2. Check all applicable items • Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within / acceptable ranges. V Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval.from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. -attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: q- 2.1-- 1 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 1 ` • StArReq lgrA51. Phone: (A 5- 6622 Facility Owner/Manager(print) C - ?J t u Date: °I- 11- 18 Fadilityy Owner/Manager(signature) PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES • THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): t eerc-` 2. Current liquid volume in 25 yr.24 hr. storm storage & structural freeboard a. current liquid level according to marker 2_ inches b. designed 25 yr./24 hr. storm & structural freeboard 20 pc% inches c. line b - line a (inches in red zone) = 18.`\ inches d_ top of dike surface area according to design 24,000 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48gallons '= ,2S 2. 7144 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 80 days g_ volume of waste produced according to structural design 19 04-S ft3 h. actual waste produced = current herd # .x line g = 19 04B ft3 e Z600 Oqs. certified herd # I i. volume of wash water according to structural design 0 r ft3 j. excess rainfall over evaporation according to design _ 1 boo ft3 k. (lines h +.i +j).x 7.48 x 30 days = 41 2.60 gallons - line f cai8 7C'-1.46 71/4.3o/ie.o 4. Total PAN to be land applied during draw down period 6-7- is I. current waste analysis dated alb (.b'* lb/1000 gal. m. (lines e + k) x line I = 5 1 lb PAN 1000 ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE it. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND.APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): H uckteberr \ . 1k 2.` Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a current liquid level according to marker 1 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.c1 inches c. line b - line a (inches in red zone) = �.ck inches d. top of dike surface area according to design 24 000 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 2.511 '10 4. gallons 12 ft3 • 2.4,oce, yl-PAS 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural.design I SO days g_ volume of waste produced according to structural design .-19 j 646 ft3 h. actual waste produced = current herd # x line g = 19)O 48 ft3 certified herd # i. volume of wash water according to structural design d . ft3 • j. excess rainfall over evaporation according to design . it-k,00® ft3 k. (lines h + i +3).x 7.48 x 30 days = - 41, Zoo - gallons line f (tq,o481, 0 {-tut,t60l (1:4,8).G3®/r eA 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8-.7- l8 . 1.14-0 lb/1000 gal. m. (lines e + k) x line I = P1'4 lb PAN 1000 - ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE .I. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY P.o4 (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD: I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): F hre. P®►,��s • 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker S inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b -.line a (inches in red zone) = V t I inches d. top of dike surface area according to design' V 2 3115 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = " (o' 'Fcl gallons 12 ft3 1 (i2 .z31g15X-1.4c3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural designISO days g_ volume of waste produced according to structural design IQ, 0'48 ft3 h. actual waste produced = current herd # x line g = 141 oi-V6 ft3 " certified herd # i. volume of wash water according to structural design 0 - ft3 -_ j. excess rainfall over evaporation according to design 1'i},000 ft3 k. (lines h + i +)x 7.48 x 30 days = IAA,2150 gallons . line f - Cict,aNb ÷a t 14100°)C 7AS1(3`9/iBo\ = " 4. Total PAN to be land applied during draw down period I. current waste analysis dated S -7- I 1.12. lb/1000 gal. m. (lines e + k) x line I = 2-30 lb PAN 1000 ?EPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY V PoA (30 Day) 2/21100 1. structure ID: 10 eerc1 elc . line m = 5 3\ lb PAN 2. structure ID: 1-1 vcl:leb err y H 111 line m = Lk-14 lb PAN 3. structure ID: l'eye. ?e,o nos line m.= 2-ZO lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines + 2 + 3 + 4 + 5 + 6 = 1235 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING-30 DAYDRAW.DOWN PERIOD.. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract# p. field # q. crop r. acres s. remaining t.TOTAL PAN u. IRR-2 PAN BALANCE application balance FOR FIELD window (lb/acre) (1bs.) column r x s Cr 1 IN heak 2.b Z 12.5.3S 328 Sept -Isvr;1 1,c., C 2 \!J heat 2,76 139.7 1 3 S�0 . c- ; > c 3 \N h ea t 2.7b 1 Iii-k . 3c1.-1 Cs- I V/In eat 2.P 2 I • 6_<?> , G 2 lNhecck 2.,62 132.g3 '315 ', 0 3 1 , \i\Nea`t 2.41 144 - 35G Ni' 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 2(c)2.-1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA(30.Day) 2/21/00 w. Total PAN to be land applied (line n from section II) = I2 3 5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 26 2.-7 lb. PAN y. Overall PAN balance (w -x) = 13i 2 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving.facility. NARRATIVE: lJ 174, 1;)e. �"` ,A �6k,sesi of\ lelcisqn Salm 0e,s ,V-ezt ket" oh 8— -18 I 4oe,Iz Icicsc,tn sau\?\ers a g er NLorir tcc v\e LolA ck 51,ke,A \ less . rkeu-dike PAN ( . aiY eg Sk o, l� b e. I ess CD7. lco\ To F,qv- gvllvlekiv%ca1 A® cz1a\5 (AA 5® -1-hoL.A l ca ?\�w`� c\ covey- crici, `}Ams ct.W 4© cc4' \e4 C o rN to i k\ 1 eLt& k a n e- 5 P'i uq V s t u i\\ \fie 1V1 e; qq A-to tn� I 1 P IS+ PoA(30 Day) 2/21/00