Loading...
HomeMy WebLinkAbout20201723 Ver 1_Corps email_20201215 Wanucha, Dave From:Euliss, Amy Sent:Tuesday, December 15, 2020 7:43 AM To:Wanucha, Dave Subject:FW: \[External\] RE: NWP 13/33 verification -Mussel relocation requirement RE: SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9) Dave, Eric permitted 149’ of bank stabilization and 100’ of temporary fill for the causeway since they overlapped. His explanation is below. Can I get you to revise the 401 to match what he did? Give me a call if you would like to discuss. Thanks! Amy From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Monday, December 14, 2020 3:33 PM To: Euliss, Amy <aeuliss@ncdot.gov> Subject: \[External\] RE: NWP 13/33 verification -Mussel relocation requirement RE: SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: I probably should have called you about the impact numbers before I did the verification, but I thought I could give you what you asked for the way I did it. The impact numbers aren’t as important as the drawings, since the drawings override, unless the impact numbers are close to thresholds. The way I looked at this is that although the permanent and temporary impacts overlap as far as linearly along the stream banks, the temporary have a greater footprint of impact since they cover the stream bottom past the permanent riprap. The impact numbers I put in the verification cover all the footprint the temporary impact has, including the part that overlaps the permanent riprap. I know that this is different than the way we handle temporary impact from dewatering, but this make sense to me for construction access impacts. The bottom line for me is that I am satisfied that the verification I issued covers the impacts you requested. If you want me to change it so it is more clear, give me a call and we’ll talk about the best way to do that. Thanks! Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. 1 Eric Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Monday, December 14, 2020 12:49 PM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Subject: \[Non-DoD Source\] RE: \[External\] NWP 13/33 verification -Mussel relocation requirement RE: SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9) Hi Eric. Our impact numbers don’t match up. You permitted 149’ of permanent impacts and 100’ of temporary impacts. We requested 149’ of permanent and 10’ of temporary that was outside of the limits of the permanent. Thanks! From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Tuesday, November 24, 2020 10:41 AM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Youngman, Holland J <holland_youngman@fws.gov> Subject: \[External\] NWP 13/33 verification -Mussel relocation requirement RE: SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Amy: Attached to this message is your requested Section 404 permit authorization for the following project: DA# SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9). NOTE: The US Fish and Wildlife (USFWS) Biological Opinion (BO) for the Dan spinymussel, dated 11/1/2019, requires NCDOT to remove James spinymussels from the impact site and relocate them to suitable locations upstream of the impacted areas, prior to construction. The BO also has other terms and conditions, including that a USFWS biologist will be present at the preconstruction meeting to explain permit conditions and discuss any questions the contractor has regarding implementation of this project. Also attached are the corresponding regional and general conditions, and a copy of the permit compliance certification. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Please note that the general and special conditions must be strictly adhered to in order for this permit authorization to remain valid and that the compliance certification must be returned to this office when the work is completed. 2 Your 11/12/2020 PCN included the boundaries of an aquatic resource delineation. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e-mail, are confirming that the aquatic resources delineation has been verified by the Corps to be sufficiently accurate and reliable for permitting actions and the determination of compensatory mitigation requirements. The boundaries of these aquatic resources are shown in the “WETLAND AND SURFACE WATER IMPACTS PERMIT DRAWINGS”, SHEETS 1-6, submitted on 11/12/2020. At this time we are only verifying the delineation. This delineation may be relied upon for use in the permit evaluation process, including determining compensatory mitigation. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an AJD, which is an appealable action. If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD)please respond accordingly, otherwise nothing further is required and we will not provide any additional documentation. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. Please reply or call if you have any questions or if I may serve you in any other way. Eric Eric Alsmeyer Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: NCDOT_REG <NCDOT_REG@usace.army.mil> Sent: Friday, November 13, 2020 1:09 PM To: Amy, Euliss <aeuliss@ncdot.gov> Cc: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Matthews, Monte K CIV USARMY CESAW (USA) <Monte.K.Matthews@usace.army.mil> Subject: SAW-2020-01998 (NCDOT / Bridge No 8 Replacement on NC 704 over Dan River / Stokes County / Div 9) Good Afternoon, We have received your Pre-Construction Notification on 12 November 2020. We have assigned the request file number SAW-2020-01998 and forwarded it to Mr. Eric Alsmeyer for further processing. Please refer to this number on all correspondence. Thank you, Josephine Schaffer Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3