Loading...
HomeMy WebLinkAboutNC0063762_Permit change_20201214Strickland, Bev From: dmetwater@aol.com Sent: Monday, December 14, 2020 4:32 PM To: Scheller, Roberto Cc: derk.denard@ncdenr.gov; Emmett Conneely Subject: [External] Re: Carolina Village Request Permit Modification CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Roberto, I know you asked me to follow up on this ... I apologize for the delay. I did, however, call Derk this afternoon and he is researching the permit. I explained to him that I have been ORC for CVMHP NPDES#0063672 for many years now and have never recorded E/U/D temperatures daily. (7 days / week) We have always (at least 2014 or thereabouts) recorded effluent temperature 5 days per week excluding holidays and the up and down stream temperatures once per week with the fecal sample and dissolved oxygen reading. The stream sites are not easy to access normally, both requiring sure footing and a keen eye for snakes. The upstream is somewhat more accessible than the down and is within walking distance from the site. The downstream site is 20 feet below the bridge on HWY 29 near the race track .... 3 to 5 miles from the site and occasionally requires advanced notice to the speedways security officer. This has never been an issue at time of inspection nor have we ever received violation for not reporting these parameters. It was my understanding after taking over ORC from Jimmy Allison, that although the facility needed attention, the monthly data he was submitting (DMR's) was adequate. It was only after I had been using the on-line EDMR process did I become aware of this issue but again, no one ever questioned (until now) and we have never received violation. My concerns: Daily = 7 days a week? Daily temperature readings of the surface water / receiving stream really necessary? I am including Derk in this email so that he can contact me regarding his file search and to keep my client representative, Emmett Conneely, up to date as well. Respectfully, Dusty Metreyeon Metwater, Inc. 704.506.4255 Sent from Windows Mail From: roberto.scheller@ncdenr.gov Sent: Wednesday, November 18, 2020 4:06 PM To: dmetwater Dustin: If you recall we talked about requesting a permit modification for Carolina Village MHP on temperature to change from Daily to Weekly monitoring. Derk Denard contact Phone number is Office (919) 707-3618; Cell 336-407-7366 and email: dek.denard@ncdenr.gov Roberto L. Scheller NC Dept. of Environmental Quality Division of Water Resources Water Quality Regional Operations Section 610 E. Center Ave., Sute 301 Mooresville, NC 28115 Ph:704-235-2204 Fax:704-663-6040