Loading...
HomeMy WebLinkAbout820218_Structure Evaluation Inspection_20180925 Structure Evaluation 9ns ecti' .. -b N •n . Facility Number: 6 -- -25-' Date: Time in: /-'3O Time out: LD cD Farm Name: Farm 911 address: Owner Name: /7/4 /Su Phone Facility Contact: Onsite Representative: Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes r/ No If yes is waste level into the structural freeboard? Yes Z-No Was non-compliant level reported to DWR - POA received Structure: 1 2 3 4 5 6 �J_ 1 Identifier: ti ;Spillway? • � S Designed Freeboard (in:): : Observed Freeboard (in.): Are there any immediate threats to the integrity of any of he structures observed? Yes No • Do any structures lack adequate markers as required by the permit? Yes No— Does any part of the waste,management system need repair Yes No Condition of field's ( sr), Condition of receiving crop. f;i0J''' Comments: