HomeMy WebLinkAbout820217_Plan of Action (POA)_20200204 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-217 County: Sampson
Facility Name: Brewer Hog Farm (1-8)
Certified Operator Name: 17804 Operator Number: Ronnie Brewer
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon,to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: #1 #2
Spillway(Y or N): N N
Level(inches): 17 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 6/5/20 Weather Permiting.
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action,and to the best of my knowledge and ability,the information is
accurate and correct.
Ronnie Brewer 910-590-6229
Phone:
Facility Owner/Manager(print)
Date:
Facility Owner/Manager(signature)
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Parham Farms J
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr.storm&structural freeboard 19.0 inches
c. line b-line a(inches in red zone)= 2.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 57000 ft2
e. line c/12 x lined x 7.48 gallons/ft3 71060 gallons •
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 65112 ft3
h. current herd# 1975 certified herd# 1975
actual waste produced = current herd# x line g = 65112 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 33250 ft3
k. (lines h+i+j)x 7.48 x 30 days/line f= 122625 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 2/4/2020 1.63
m. ((lines e+k)/1000)x line I= 316 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
•