HomeMy WebLinkAbout20201732 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201212Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, December 12, 2020 12:00 AM
To: dpoore@west-consultants.com
Cc: Annino, Amy M
Subject: Pre -Filing Time Clock has been reached for Larson Pond Pipe Repair - 20201732 Ver
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Larson Pond Pipe
Repair that you submitted on 11/11/2020. The ID number for that project is 20201732, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored
ID#* 20201732
Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Amy Annino
Pre -Filing Meeting Request submitted 11/11/2020
.............................................................................................................................................................................................................................................................................................
Contact Name * David W. Poore, PE, CPESC
Contact Email Address* dpoore@west-consultants.com
Project Name* Larson Pond Pipe Repair
Project Owner* David and Susan Larson
Project County* Mitchell
Owner Address: Street Address
PO Box 98
Address Line 2
50 Walnut Straight Road
City
State / Province / Fegion
Spruce Pine
NC
Postal / Zip Code
Country
28777
USA
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit F Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Amy Annino
Please give a brief project description below.
The Larsons have a pond that was constructed on their property in
the mid 70's through the Soil Conservation Service. The pond has a
6" galvanized steel pipe discharge pipe that has rusted through and
is in need of repair. The plan is to drain the pond down to the existing
sediment level, install an HDPE drain pipe structure through the
earthen dam, grout the existing 6" corrugated pipe closed, then start
impounding water again.
Please give a couple of dates you are available for a meeting.
11 /16/2020
11 /17/2020
11 /18/2020
11 /20/2020
11 /23/2020
Please attach the documentation you would like to have the meeting about.
TAX MAP.pdf 465.18KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
. lam
Submittal Date 11/11/2020