Loading...
HomeMy WebLinkAbout20201732 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201212Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, December 12, 2020 12:00 AM To: dpoore@west-consultants.com Cc: Annino, Amy M Subject: Pre -Filing Time Clock has been reached for Larson Pond Pipe Repair - 20201732 Ver Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Larson Pond Pipe Repair that you submitted on 11/11/2020. The ID number for that project is 20201732, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201732 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Amy Annino Pre -Filing Meeting Request submitted 11/11/2020 ............................................................................................................................................................................................................................................................................................. Contact Name * David W. Poore, PE, CPESC Contact Email Address* dpoore@west-consultants.com Project Name* Larson Pond Pipe Repair Project Owner* David and Susan Larson Project County* Mitchell Owner Address: Street Address PO Box 98 Address Line 2 50 Walnut Straight Road City State / Province / Fegion Spruce Pine NC Postal / Zip Code Country 28777 USA Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Amy Annino Please give a brief project description below. The Larsons have a pond that was constructed on their property in the mid 70's through the Soil Conservation Service. The pond has a 6" galvanized steel pipe discharge pipe that has rusted through and is in need of repair. The plan is to drain the pond down to the existing sediment level, install an HDPE drain pipe structure through the earthen dam, grout the existing 6" corrugated pipe closed, then start impounding water again. Please give a couple of dates you are available for a meeting. 11 /16/2020 11 /17/2020 11 /18/2020 11 /20/2020 11 /23/2020 Please attach the documentation you would like to have the meeting about. TAX MAP.pdf 465.18KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature . lam Submittal Date 11/11/2020