Loading...
HomeMy WebLinkAbout20201734 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201212Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, December 12, 2020 12:01 AM To: MBramblett@harthickman.com / Cc: Johnson, Alan Subject: Pre -Filing Time Clock has been reached for Lane Street Industrial - 20201734 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Lane Street Industrial that you submitted on 11/11/2020. The ID number for that project is 20201734, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201734 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 11/11/2020 Contact Name* Matt Bramblett / Dan McCauley Contact Email Address* MBramblett@harthickman.com/ dmccauley@harthickman.com Project Name* Lane Street Industrial Project Owner* Trammell Crow Company Project County* Cabarrus Owner Address: Street Address 3700 Glenwood Avenue, Suite 510 Address Line 2 City State / Rovince / Fbgion Raleigh NC Fbstal / Zip Code Country 27612 Wake Is this a transportation project?* Yes o No Type(s) of approval sought from the DWR: 141 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express • Individual Permit F Modification • Shoreline Stabilization Does this project have an existing project ID#?* �' Yes C No Please list all existing project ID's associated with this projects.* SAW-2020-01712 Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* The property developer is proposing the construction of an industrial development. Stream, wetland and buffer impacts are proposed for a road crossing, and to facilitate grading on -Site. The planned development area will be graded with heavy equipment to prepare level building pads, roadways, and stormwater BMPs. The owner has allowed for extensive avoidance and minimization of impacts to Waters of the US. Dan McCauley with Hart & Hickman spoke to Alan Johnson on November 2, 2020 to discuss the preliminary development plan. Please give a couple of dates you are available for a meeting. 11 /16/2020 11 /17/2020 Please attach the documentation you would like to have the meeting about. Lane Street SP9-TCC 750.pdf 1.43MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/11/2020