HomeMy WebLinkAbout20201720 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201211Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, December 11, 2020 12:01 AM
To: sbrandwood@ecepower.com
Cc: Mairs, Robb L
Subject: Pre -Filing Time Clock has been reached for Chinquapin Radial Transmission Line -
20201720 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Chinquapin Radial
Transmission Line that you submitted on 11/10/2020. The ID number for that project is 20201720, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201720
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 11/10/2020
Contact Name * Shane Brandwood
Contact Email Address* sbrandwood@ecepower.com
Project Name* Chinquapin Radial Transmission Line
Project Owner* Four County Electric Membership Corporation
Project County* Duplin
Owner Address: Street Address
1822 NC-53
Address Line 2
aty
State / Frovince / Region
Burgaw
NC
Rbstal/Zip Code
Country
28425
us
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.
This project consists of the upgrade of approximately 1.5 mile of an
existing 69kV transmission line with a new 115kV transmission line
with new associated poles. The project starts at approximately Hwy 50
and continues for 1.5 miles and ends just short of Durwood Evans
Road.
Please give a couple of dates you are available for a meeting.
11 /24/2020
12/1 /2020
Please attach the documentation you would like to have the meeting about.
Chinquapin Radial Transmission Line.pdf 177.71<13
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
f
Submittal Date 11/10/2020