Loading...
HomeMy WebLinkAbout20201747 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201213Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, December 13, 2020 12:01 AM To: tking@awck.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Cherry Lane Sanitary Sewer Outfall - 20201747 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Cherry Lane Sanitary Sewer Outfall that you submitted on 11/12/2020. The ID number for that project is 20201747, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201747 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 11/12/2020 Contact Name* Troy King, P.E. Contact Email Address* tking@awck.com Project Name* Cherry Lane Sanitary Sewer Outfall Project Owner* City of Graham Project County* Alamance Owner Address: Street Address 201 South Main Street Address Line 2 PO Drawer 357 aty State / Province / Region Graham North Carolina Fbstal / Zip Code Country 27253 United States Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below. The project is divided into two phases and will be constructed to the extent that funding allows. Phase I is the portion of outfall from Cherry Lane Pump Station to Manhole #8, immediately upstream of Dosing Siphon #1. This phase consists of 18" gravity sanitary sewer outfall, 12" gravity sanitary sewer outfall, a 10" inverted dual siphon creek crossing, and a second creek crossing. The depth of the line at the second creek crossing allows it to be installed without the need for an inverted siphon. A major portion of this outfall is expected to be installed below the rock elevation, so construction equipment required will include large excavators, rock drills, blasting equipment, and other equipment typical of pipeline installation where rock blasting is required. Phase 11 is the portion of outfall that extends from Manhole #8 to Back Creek Pump Station #1. This phase consists of 12" gravity sanitary sewer outfall, 8" gravity sanitary sewer outfall, and an 8" inverted dual siphon creek crossing. Construction equipment for this portion of outfall w411 be very similar to Phase 1. Buffer impacts include areas where current forestland w411 be cleared for permanent access easements, as well as areas that are currently cleared but w411 require a change of use. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. D.6i. 18141 - Buffer Impacts - 11-11-20.pdf 1003.21KB 4283 Back Creek Sewer Outfall Wet 1.59MB Report_12.13.18.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/12/2020