HomeMy WebLinkAbout820423_Plan of Action (POA)_20200603 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-423 County: Sampson Facility Name: McCullen Farms 5&6 Certified operator Name: Zack McCullen IV Operator Number: 996418 1. Current liquid level(s)in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom,of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 5&6 ' Spillway(Y or N): N Level(inches): 17 2. Check all applicable items • Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers,number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site • not covered in the facility's CAWMP. • Operation will be partially or fully depopulated. *Aftach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/3/20 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action,and to the best of my knowledge and ability,the information is accurate and correct Zack McCullen III Phone: 910-385-6100 Facility Ow er/Manager(print) /V io4rn f'° Date: /Facility Owner/Manager(signature) ll PLAN OF ACTION(PoA).FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 5&6 2. Current liquid volume in 25 yr./24 hr.storm storage&structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm&structural freeboard 19.0 inches c. line b-line a(inches in red zone)= 2.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 36666 ft2 e. line c/12 x line d x 7.48 gallons/ft3 45710 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days • g. volume of waste produced according to structural design 40880 ft3 • h. current herd# 1240 certified herd# 1240 actual waste produced = current herd# x line g = 40880 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 22869 ft3 k. (lines h+i+j)x 7.48 x 30 days/line f= 79474 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1/6/2020 1.02 lbs/1000 gal. m. ((lines e+k)/1000)x line I= 128 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 5&6 line m= 127.7 lb PAN 2. Structure ID: line m= lb PAN 3. Structure ID: line m= lb PAN • 4. Structure ID: line m= lb PAN • 5. Structure ID: line m= lb PAN 6. Structure ID: line m= lb PAN n. 11nes1 +2+3+4+5+6= 127.7lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o.tract# p.field# q, crop r.acres s.remaining IRR-t.TOTAL PAN u.application window' • 2 PAN balance BALANCE FOR (Ib/acre) FIELD(lbs.) • column r x s 9851 1 Millet 4.53 129.00_ 584.4 MAR15-AUG 9851 2 Millet 4.53 135.00 611:6 MAR15-AUG • • ' I v.Total PAN available for all fields(sum of column t)= 1195.9 lb. PAN IV.FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= 127.7 lb. PAN x. Crop's remaining PAN balance(line v from section Ill)= 1195.9 lb. PAN y. Overall PAN balance(w-x)_ -1068 lb. PAN • Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Self reported to DWR on 5/30/20.