Loading...
HomeMy WebLinkAboutNCC205691_NOI Application_20201215Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 12/8/2020 6:11:55 PM (NCG01 NOI Submission) Approve by Gamble, Aana C 12/9/2020 12:11:20 PM (Review- Construction NOI 38676) • The task was assigned to Gamble, Aana C by round robin distribution 12/8/2020 6:12 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: December 10, 2020 5:00 PM 12/8/2020 6:12 PM Submit by Selkane, Aziza 12/15/2020 3:48:01 PM (Payment Verification for NCC205691) * Justin R Trepper Carla Olive Trepper • Selkane, Aziza assigned the task to Selkane, Aziza 12/15/2020 3:46 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 20, 2021 5:00 PM 12/9/2020 12:11 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * JC Powder coating 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 1 c. Parcel ID List all Ait associated w ith this project. Number(s) (PIN) 2. County* Harnett 3. Highway or Street 220 progress drive Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* fuquay varina 5. State * NC 6. Zip Code* 27526 7. Latitude* Enter the latitude in decinal degrees 35.5650 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -78.8670 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/10/2020 Estinated Construction Project Start Rate 10. Date to End* 07/01/2021 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 2.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 2.24 (acres) * 14. Post- 1.21 construction (Estimated) impervious area (acres) * NCC Project NCC-HARNE-2020-JC Powder coating Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Buckhorn Creek Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody 18-7-(2) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Justin Trepper It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Justin IF Corporation, enter Faegistered Agent First Wre 3. Last Name* Trepper It Corporation, enter F;bgistered Agent Last %rre 3b. Title owner 4. Permitee E-mail jcpowdercoating922@gmail.com Address* 5. Permittee 919-625-4656 Telephone No.* 6. Permittee Mailing Street Address Address* 9016 Barker Road Address Line 2 City State / Frovince / Fbgion New Hill NC Fbstal / Zip Code Country 27562 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 9016 Barker Road Address Line 2 City State / Frovince / Faegion New Hill Road NC Fbstal / Zip Code Country 27562 us 8. Type of C wnership is only individual if an individual is naned in B.1. above. Ownership* Individual C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Justin Contact - First Name * 2. Primary Site Trepper Contact - Last Name * 3. Title owner 4. Site Contact E- jcpowdercoating922@gmail.com mail Address* 5. Site Contact 919-625-4656 Telephone No. 6. Organization JC Powder Coating Name 7. Site Contact Street Address Mailing Address* 9016 Barker Road Address Line 2 city New Hill Fbstal / Zip Code 27562 8. Consultant Name (Optional) Spaulding Group First and Last nacre 9. Consultant E-mail tom@spaulding-group.com This person will be copied on all correspondence. 10. Consultant 919-854-7990 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/16/2020 Approved * 2. E&SC Plan Project Harne-2021-060 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan harne-2021-060apMod.pdf 779.78KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Mast be RDFfornat (lint 20IVB) 968-20 - C-0000 - Erosion Control Submittal-C- 1.08MB O.O.pdf Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 8. NOI Certification NCG01.pdf 811.04KB Form Mast be FDFfornat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Justin Trepper Title owner Organization Legally Responsible Entity JC Powder Coating Date * 12/08/2020 F. Tracking and COC Info NOI Tracking No. 38676 NC Reference No. NCG01-2020-5691 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205691 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5691 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205691-2020 Invoice Due Date 1/8/2021 Initial Fee $ 100.00 Invoice Status OPEN