HomeMy WebLinkAbout820194_Certificate of Coverage (COC)_20191023 pl;rtq,
RECEWED
ROY COOPER ia" ,)� ` ` - DEQIDWR
Governor ti � C6'
MICHAEL S.REGAN % "`�,4."
Secretary .- , . 0 C T 2019
LINDA CULPEPPER NORTH CAROLINA
Director Environmental Quality
Q YAMS_�F-1Pi��'hll C'!�r—i 1d 1J•IN URCE
October 23, 2019
Cumbo Farms LLC
C&R Finishing
49 Cross Way Ln
Clinton NC 28328
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS820194
C&R Finishing
Animal Waste Management System
Sampson County
Dear Reid H. Cumbo:
The Division of Water Resources (Division)received your sludge survey information on
September 20, 2019. With the survey results, you requested an extension of the sludge survey
requirement for Lagoon 1 at the C&R Finishing facility. Due to the amount of treatment volume
available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge
survey is not needed until December 31, 2021.
The next sludge survey for Lagoon 1 at C&R Finishing should be performed before December
31, 2021.Please retain this letter and keep it with your farm records for reference.
Please call me at(919) 707-3702 if you have any questions.
Sincerely,
. p em„.4244,
Ramesh Ravella
Animal Feeding Operations Program
cc: Fayetteval'e Reg1�o altaffice ater Quality Regional Operations Section
Permit File AWS820194
DE 4 North Carolina Department of Environmental Quality I Division of Water Resources
') 512 North Salisbury Street 11636 Mall Service Center I Raleigh,North Carolina 27699-1636
.e i= are a/•' 919.707.9000