Loading...
HomeMy WebLinkAboutNC0024406_Transmittal of Updated Combined Waste Formula Calculation_20201214 DUKE Duke Energy Environmental Services ENERGY® 410 S.Wilmington Street Raleigh,NC 27601 December 4, 2020 Sergei Chernikov, Ph.D. RECEIVED North Carolina Department of Environmental Quality Division of Water Resources DEC 14 2020 1617 Mail Service Center Raleigh, NC 27699-1617 NCDEQ/DWRINPDES Subject: Transmittal of updated combined waste formula calculation Belews Creek Steam Electric station NC0024406 Stokes County Dear Dr. Chernikov: Attached please find an updated combined waste formula calculation for the subject facility. This update calculates categorical limits based on the limits for FGD wastewater published in the Federal Register on October 13, 2020. This is being provided as requested by the Department when FGD landfill leachate was directed to the FGD wastewater treatment system in 2019. Please incorporate into your review of our active permit modification request as you determine appropriate. Duke Energy is using the flow scenario identified as "Scenario#1" in the attached. We do not anticipate use of or request any changes to the permit related to "scenario#2". Sincerely, E, Shannon Langley Principal Environmental Specialist Attachment December 3, 2020 Addendum No. 1 from Dewberry Engineers Cc: Lori Tollie/FileNet - via email Brenda Johnson - via email www.duke-energy.com IN Dewberry ADDENDUM NO. 1 Date: December 3, 2020 To: Derek Henderson From: Amber Greune Subject: Addendum No. 1 to Belews Creek FGD Treatment System Capacity Analysis Memorandum, submitted December 13, 2019 Comments: In the memorandum submitted to Duke on December 13, 2019, Dewberry calculated anticipated numerical limits at the Belews Creek internal Outfall 002 based on the addition of leachate from the FGD Landfill and Craig's Road Landfill and on the proposed Effluent Limitations Guidelines (ELGs)for Steam Electric Power Generators published November 22, 2019 (Table 13). The ELGs were revised and the 2020 Reconsideration Rule was published October 13, 2020. Per Duke's request, Dewberry updated the anticipated numerical limits at the Belews Creek internal Outfall 002 based on the numerical limitations for FGD wastewater in the 2020 Reconsideration Rule. The updated anticipated limits are summarized in Table 1. Table 1.Anticipated FGD Concentration Limits and Calculated Alternative Concentration Limits Based on ELGs •ublished October 13,2020. Selenium Nitrate/Nitrite-N Arsenic Mercury Scenario (µg/L) (mg/L) (µg/L) (ng/L) Monthly Daily Monthly Daily Monthly Daily Monthly Daily Avera•e Maximum Avera•e Maximum Avera•e Maximum Avera•e Maximum Anticipated Outfall 002 Limits based on 2020 29 70 3 4 8 18 34 103 ELG revision Speculative Scenario 1 Limits(FGD Landfill+ 25 61 2.6 3.5 7 16 30 89 FGD Blowdown) Speculative Scenario 2 Limits(FGD and Craig's 23 55 2.4 3.2 6 14 27 81 Road Landfill+FGD Blowdown) Addendum No.1 11 of 1