Loading...
HomeMy WebLinkAbout20080915 Ver 2_Staff Report_20100908Staff Report Project Num: 20080915 Version: 2 Name: Linville Dam Embankment Seismic Stability Improvements (Catawba-Wateree) County: Burke Location: Latitude: SW Plan Location: Owner: Wise, Jonathan R. Contact Person: Wise, Jonathan R Inspection Date: 09/08/2010 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Kevin H Barnett Secondary Inspector(s): Question Areas: M Site Visit Inspection Summary: Title: Entry Time: 02:30 PM Status: Received Project Type: Other Region: Asheville Longitude: Phone: 828-391-6754 Exit Time: 02:45 PM Inspection Type: Staff Report Phone: 828-296-4500 Ext.4657 Based on additional info submitted (dated Aug 27, 2010), issue with turbidity and fish relocation additional requirements. Page: 1 Project Num: 20080915 Owner: Wise, Jonathan R. Inspection Date: 09/08/2010 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Yes No NA NE Do impacts described in the application differ those seen in the field? ? ? ? ? If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ? ? ? ? if yes please describe differences and how raidigabon Patios are affected Are there additional impacts not described in the application? ? ? ? ? If yes.. please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ? ? ? ? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? ? ? ? ? Are there additional stromwater conditions that should be required due to the following classifications: ? ? ? ? # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ? ? ? ? # If yes, what phase is this? Are there prior impacts from prior phases? ? ? ? ? If yes. what are the cumulative imacts for this project) Possible secondary impacts noted. Comment: Page: 2