HomeMy WebLinkAboutSW8970531_Historical File_19970702State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
A. Preston Howard, Jr., P.E., Director
Mr. Douglas J. 'Wood
Carrera Corporation
600 Depot Street
Latrobe, Pennsylvania 15650
Dear Mr. Wood:
I IL ".M
qT'W 0-
�EHNR
July 2, 1997
Subject: Permit No. SW8 970531
Carrera Corporation(Leland, N.C.)
Low Density Stormwater Project
Brunswick County
The Wilmington Regional Office received the Stormwater Management Permit Application for Carrera
Corporation on May 19, 1997, with final information on July 1, 1997. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set
forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 970531 dated July 2, 1997, to Carrera
Corporation.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions
and limitations as specified therein, and does not supercede any other agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina
General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC
27611-7447. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact either Greg
Stutts or me at (910) 395-3900.
Sincerely,
Rick Shiver, P.G.
Acting Regional Water Quality Supervisor
RS/ges: S:1WQSISTORMWATIPERNIM970531.JUL
cc: 1. Phillip Norris, P.E. , Andrew & Kuske
Delaney Aycock, Brunswick County Inspections
Wilmington Regional Office, Central Files
Greg Stuffs
Division of Coastal Management
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer
State Stormwater Management Systems
Permit No.SW8 970531
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERWr
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,
and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Carrera Corporation
Carrera Corporation(Leland, N.C.)
Brunswick County
FOR THE
construction, operation and maintenance of a 30 % low density development in compliance with the provisions
of 15A NCAC 2H .1000 (hereafter referred to as the "stonnwater rules ") and the approved stormwater
management plans and specifications, and other supporting data as attached and on file with and approved by
the Division of Water Quality and considered a part of this permit for Camera Corporation.
The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following
specific conditions and limitations:
I. DESIGN STANDARDS
1. The total allowable built -upon area for the tract is 73,572 square. feet. This permit covers the
construction of 59,677 square feet of built -upon area.
2. The overall tract built -upon area percentage for the project must be maintained at 30 %, as required by
Section 1005 of the stormwater rules.
3. Approved plans and specifications for projects covered by this permit are incorporated by reference and
are enforceable parts of the permit.
4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with
minimum side slopes of 3:1 (H: V) or curb outlet systems as defined in the stormwater rules and
approved by the Division.
State Stormwater Management Systems
Permit No.SW8 970531
5. No piping shall be allowed except:
a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road.
b. That minimum amount needed under driveways to provide access to lots.
6. Projects covered by this permit will maintain a minimum 30 foot wide vegetative buffer between all
impervious areas and surface waters.
7. The tract will be limited to the amount of built -upon area indicated in the approved plans.
S. The permittee is responsible for verifying that the proposed built -upon area does not exceed the
allowable built -upon area.
9. The Bngineer/Owner/Developer/Permittee must certify in writing that the project's stormwater controls,
and impervious surfaces have been constructed within substantial intent of the approved plans and
specifications. Any deviation from the approved plans must be noted on the Certification.
10. The Director may notify the penmittee when the permitted site does not meet one or more of the
minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall
submit a written time schedule to the Director for modifying the site to meet minimum requirements.
The permittee shall provide copies of revised plans and certification in writing to the Director that the
changes have been made.
11. Deed restrictions are incorporated into this permit by reference and must be recorded with the Office
of the Register of Deeds prior to construction. A copy'of the recorded restrictions must be received by
this Office within 30 days of the date of recording. Recorded deed restrictions must include, as a
minimum, the following statements related to stormwater management:
"The maximum built -upon area is 73,572 square feet, inclusive of that portion of the
right-of-way between the front lot line and the edge of the pavement, structures, pavement,
walkways of brick, stone, slate, but not including wood decking. "
"Construction of additional impervious area will require a permit modification."
"The covenants pertaining to stormwater regulations may not be changed or deleted without
concurrence of the State. "
"Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the
development except for average driveway crossings, is strictly prohibited by any persons. it
"Projects within CAMA's Area of Environmental Concern (AEC) are subject to a reduction of
the permitted amount of built -upon area due to LAMA jurisdiction within the AEC."
State Stormwater Management Systems
Permit No.SW8 970531
12. The following items will require a modification to the permit. Revised plans, specifications and
calculations must be permitted prior to the permittee beginning construction on the modification:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision of the project area.
L Filling in, altering or piping any vegetative conveyance shown on the approved plan.
In addition, the Director may determine that other revisions to the project should require a modification
to the permit.
H. SCHEDULE OF COMPLIANCE
1. The permittee shall comply with the following schedule for construction and maintenance of the Low
Density Option stormwater systems:
a. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be
operational for their intended use prior to the construction of any built -upon surface except
roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or
other vegetated conveyances will be repaired immediately.
2. The permittee shall at all times provide the operation and maintenance necessary to operate the
permitted stormwater management systems at optimum efficiency to include:
a. Inspections
b Sediment removal.
C. Mowing, and revegetating of the side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
3, The permittee shall submit recorded deed restrictions limiting builtuponared within 30 days of the date
of recording.
4. The permittee shall submit the Engineer/Owner/Designer/Permittee Certification within 30 days of
completion of the project.
5. The permittee shall submit all information requested by the Director or his representative within the
time frame specified in the written information request.
State Stormwater Management Systems
Perm t No.SW8 970531
M. GENERAL CONDITIONS
1. Failure to abide by the conditions and limitations contained in this permit may subject the Penmittee to
an enforcement action by the Division of Water Quality, in accordance with North Carolina General
Statutes 143-215.6A to 143-215.6C.
2. The permit issued shall continue in force and effect until revoked or terminated.
3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for
a permit modification, revocation and reissuance, or termination does not. stay any permit condition.
4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit,
revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and
regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000;
and North Carolina General Statute 143-215.1 et. al.
5. The permit is not transferable to any person except after notice to and approval by the Director. The
Director may require modification or revocation and reissuance of the permit to change the name and
incorporate such other requirements as may be necessary. A formal permit request must be submitted
to the Division of Water Quality accompanied by the' appropriate fee, documentation from both parties
involved, and other supporting materials as may be appropriate. The approval of this request will be
considered on its merits, and may or may not be approved.
6. The permittee grants permission to DEHNR Staff to enter the property for the purpose of inspecting
all components of the stormwater management facility.
7. The issuance of this permit does not preclude the Permittee from complying with any and all statutes,
rules, regulations, or ordinances which may be imposed by other government agencies (local, state and
federal) which have jurisdiction.
Permit issued this the 2nd day of July, 1997
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
----------�-_� -r-------------------
=0 A. Preston Howard, Jr., P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW8 970531
is
DIVISION OF WATER QUALITY
A&K 97140
NORTH CAROLINA STORMWATER MANAGEMENT PERMIT APPLICATION
I. GENERAL INFORMATION
(Please print clearly or type)
1. Project Name: Camera
2. Locatio.JL, du•-ectio-is to project (inc'iude Cowily, Address, State Road) Attach map. Brunswick County
Industrial Blvd. in Leland Industrial Park
3. Owner's Name: Carrera Phone: 412-539-6999
4.Owner's Mailing Address: 600 Depot Street
City Latrobe State PA Zip 15650
G
5. Nearest Receiving Stream iq L.1-r � R Class C Swamp
6. Project description Manufacturing facility with paved access and varking
II. PERMIT INFORMATION
Q
1. Permit No.(To be filled in by DWQ)
2. Application Date 5/5/97 Fee enclosed $ $225.00
3. Permit Type X Ncw Renewal Modification(existing Permit No.)
4. Proj Type X Low Density Detention Infiltration Redevelop General Alter Offsite
5. Other State/Federal Permits/Approvals Required (Check appropriate blanks)
CAMA Major Sedimentation/Erosion Control X 404 Permit
III. BUILT UPON AREA (Please see NCAC 2H.1005 thru .1007 for applicable density limits)
Drainage Drainage Breakdown of Impervious Area
Basin Basin (Please indicate below the design impervious area)
Classification C-Swamp Buildings 26,341 SF
Existing Built -upon Area N/A
Proposed Built -upon Area 1.37 Ac
Total Project Area 5.63 Ac
% Impervious Area 0.24
Streets 23,911 SF
Parking/SW 9,425 SF
Other
Totals 59,677 SF or 1.37 Ac.
IV. STORMWATER TREATMENT (Describe how the runoff will be treated)
Improvements are less than 30% of site area. Low density design w/swales. No curb & gutter.
V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
VI.
U' _I_9
Deed restrictions and protective covenants are required to be recorded for all low density projects and all
subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded for
the type of project applied for.
By your signature below, you certify that the recorded deed restrictions and protective ccvenants i;r this projeoi
shall include all the items required by the permit, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the covenant cannot be changed or deleted without
concurrence from the State, and that they will be recorded prior to the sale of any lot.
OWNER'S CERTIFICATION
I. Douglas J . wood certify that the information included on this permit
(Please print or type name clearly)
application form is correct, that the project will be constructed in conformance with the approved plans, that the
deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the
proposed project complies with the requirements of 15A NCAC 2H.1000.
I authorize the below a person or ubmit stormwater plans on my behalf.
V
Owner/A on Agent Signature and Title
AGENT AUTHORIZATION (musTSE compmmp)
Person or firm name J. Phillip Norris, P.E. / Andrew & Kuske Consulting Engineers, Inc.
Mailing Address 902 Market Street
City Wilmington State NC Zip 28401
Date
Phone 910-343-9653
Please submit application, fee, plans and calculations to the appropriate Regional Office.
cc: Applicant/WiRO//Central Files
Office Use Only
MAY 19 1997
ATTACHMENT A
LOW DENSITY AND SUBDIVISION PROJECTS
GENERAL STTBWTT.A.L REQ1L4REMENTS
A completed stormwater permit application.
2. Two sets of plans showing north arrow, scale, revision date, property/project boundaries, lot lines,
proposed and existing contours, drainage areas, mean high water line, wetlands, easements, the 30'
minimum vegetated buffer between impervious areas and surface waters, proposed impervious areas, and
road cross -sections.
3. Calculations of the built -upon area, for subdivision, please show the methodology for arriving at the per lot
built -upon area. For non -subdivision projects, please break down the calculation into buildings, roads,
parking and other (include all impervious areas).
4. Low density projects with curb and gutter will require:
a. Drainage area delineation and swale locations shown on the plans.
b. Detail of the Swale, showing minimum 5:1 side slope.
C. Velocity calculations, indicating a non -erosive flow for the 10 yr storm.
d. Inlet and outlet elevations. Maximum longitudinal slope is 5%.
e. The type of vegetated cover specified on the plans.
f. A flow spreader mechanism located at the swale entrance.
g. A signed Operation and Maintenance Plan.
DEED RESTRICTIONS REQUIREMENTS
The following statements must be included for all low density projects, and for all subdivisions:
No more than 73.570 square feet of any lot, including that portion of the right-of-way between the edge of
pavement and the front lot line, shall be covered by impervious structures, including asphalt, gravel, concrete,
brick stone, slate or similar material, not including wood decking or the water surface of swimming pools.
This covenant is intended to ensure continued compliance with the stormwater permit issued by the State of
North Carolina. The covenant may not be changed or deleted without the consent of the State.
No one may fill in or pipe any roadside or lot -line swale, except as necessary to provide a minimum driveway
crossing.
For curb and gutter projects, no one may pipe, fill in, or alter any lot line swale used to meet North Carolina
Stormwater Management Permit requirements.
NOTE: If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size,
and the allowable built -upon area for each lot.
Date Design Andrew and Kuske >SheetA902 Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401
Check Job �,Q/�-jw�. For ��q��Job No.
0510iJ 10tiTYML. �;-7i1/n
7-z)r*t, lmP, _ /, 37 1,4e-
/v
No Gv►2a Gv r- i2 / 51�r FC e Pj s w
55 r
OvT&67- re�olr 79t/6,P- w�L
nlnr X LO,BZ/,Y-= 3,1X5Cr-
>, 21
7-tJPc tf ,2rP P
o oTZ-LET
�l 15 �►7�P _ �, �f FTf 5� Z a 0<
/Nbrx�-c-� jai'-nP. ���T T2 -ram @ 0L,,jme-7-
4e- lte00 GF 0o0 C.,O=
w/ 1 'Z F T lNEr i2 C _�t,C�7
z CAI
• �e
� �/ ••fib V � Itl � �e�•• �„\ ova
p,, PL h..e • OQ ,,�
I,-,071 L #11118OM I �� S°°°.
John R. Andrew, P.E.
Andrew & Kuske J.A. Kuske, P.E.
CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E.
902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604
May 16, 1997
NC DEHNR
Division of Water Quality
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Attn: Ms. Linda Lewis
Re: Carrera
Brunswick County
A&K Project No. 97140
Dear Ms. Lewis:
MAY 19 1997
Enclosed are three sets of plans for the subject project, calculations, the Division
of Water Quality stormwater management permit application and a $225.00
check for the processing fee.
Please review this information for approval and contact us with any questions or
comments you may have. Thank you for your assistance on this project.
Sincerely,
ANDRE & KUSKE
CONS L ING ENGINEER
J. Phillip Norris, P.
JPN/sbs
enclosures
cc: Bruce McGuire/Miller Bldg.
97,408,A