Loading...
HomeMy WebLinkAbout20190210 Ver 2_Site Inspection Non Compliant_20201214Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 12/14/2020 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted on December 14, 2020 by Kevin Mitchell with the Asheville Regional Office. Reid Whitehead and Jason Chastain were present during the inspection. The following are items that need attention. - ~ Station L 28+30 LT (Site 1) - Stabilize between silt fence and headwall. This was pointed out during the last 2 inspections in October and November. Add stone to silt fence outlet. - ~ Station L 80+00 LT & L 83+00 LT (Site 4) - Remove coir logs from JS. These were approved as a temporary measure to collect residual sediment in the culverts. - ~ Station L 95+00 LT (Coleman Creek) - Remove silt fence from stream. - ~ Station L 96+00 LT - Stabilize slopes. - ~ Station L 117+50 RT (Site 8) - Remove sediment in jurisdictional stream. Remove coir fiber from stream bed. Needs immediate attention. - ~ Station L 147+00 RT - Stabilize area with temporary groundcover. - ~ Station L 179+00 LT (Blair Creek) - Work area inundated due to high water. Improve impervious dike with additional sand bags. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 12/14/2020 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? In-stream sediment was observed in a jurisdictional stream at ~ Station 117+50 R (Site 8).Comment: page:2