Loading...
HomeMy WebLinkAbout820160_Plan of Action (POA)_20200625 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-160 County: Sampson Facility Name: Darden Farms Nursery Certified Operator Name: Andy Darden Operator Number: 18370 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 1 'Spillway(Y or N): N N Level(inches): 17 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/17/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct. Anthony Darden Phone: 910-214-0092 Facility Owner/Manager(print) Date: 6/25/2020 Facility Owner/Manager(signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker _ 17.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b- line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 87906 ft2 e. line c/12 x line d x 7.48 gallons/ft3 109589 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd# 3520 certified herd# 3520 actual waste produced = current herd# x line g = 116329 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 53375 ft3 k. (lines h + i +j)x 7.48 x 30 days/line f= 211564 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 2/6/2020 2.24 Ibs/1000 gal. m. ((lines e+ k)/1000) x line I = 719.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2 line I= 48774 gallons 2. structure ID: 3 line I = 136141 gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2+ 3 +4+ 5+ 6= 184915 gallons o. line n/27154= 6.81 acre-inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract# q. field# r. soil type s. crop t. acres u.remaining v.maximum. w.maximum IRR-2 PAN application rate application balance (in/hr) amount(inches) (lb/acre) 3059 10 Norfolk corn 3.65 128.75 0.5 1 3059 11 Norfolk corn 4.25 128.75 0.5 1 3059 2 Autyrville soybeans 3.51 100.00 0.6 1 3059 12 Norfolk corn 4.16 128.75 0.5 1 10678 18 Norfolk soybeans 4.54 140.00 0.5 1 10678 19 Norfolk soybeans 4.59 140.00 0.5 1 10678 20 Norfolk soybeans 4.59 140.00 0.5 1. 10678 21 Norfolk soybeans 4.59 140.00 0.5 1 10678 22 Norfolk soybeans 3.86 140.00 0.5 1 10678 23 Norfolk soybeans 2.47 140.00 0.5 1 10678 24 Norfolk soybeans 1.32 140.00 0.5 1 x.total acres available during 5 day draw down (sum of column t) = 41.53 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = 0.16 inches per acre to be applied within 5 days PoA(3g.Day)2/21/00 line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul,depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) fairly wet 2. Date and amount of last rainfall event? DATE: 06/20/16 AMOUNT: inches 3. Dates of last waste application event per field: 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line"n"at appropriate seasonal (i.e. winter) application rates within 5 days? yes 5. Irrigation schedule for next 5 days-include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate daily with 2 reels moving as needed. PoA(5 Day)2/21/00