HomeMy WebLinkAboutNOI 32083_Emails RE Permit Not Needed_20201214Selkane, Aziza
From: Matt Williams < MWilliams@mcdonaldyork.com >
Sent: Monday, December 14, 2020 3:17 PM
To: Selkane, Aziza
Cc: Morman, Alaina
Subject: RE: [External] RE: Construction Stormwater eN01 Status - Payment Instructions
NCC204333
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
No we do not,
Thankyou
Matt Williams
Project Engineer
McDonald York Building Company
801 Oberlin Rd, Suite 235 1 Raleigh, NC 27605
d:(919) 277-1049 c:(919) 200-3247
McDonplffork
Join Our Team
From: Selkane, Aziza <aziza.selkane@ncdenr.gov>
Sent: Monday, December 14, 2020 3:10 PM
To: Matt Williams <MWilliams@mcdonaldyork.com>; Nathan Swiggett <NSwiggett@mcdonaldyork.com>
Cc: Morman, Alaina <alaina.morman@ncdenr.gov>; mattwilliamsnc3@gmail.com
Subject: RE: [External] RE: Construction Stormwater eNCI Status - Payment Instructions NCC204333
What do you mean by closing it?
Do you still need the permit or not?
Aziza Selkane
Stormwater Program Billing Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3710
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
1
D- E
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
From: Matt Williams [mailto:MWilliams@mcdonaldvork.com]
Sent: Monday, December 14, 2020 3:03 PM
To: Selkane, Aziza <aziza.selkane@ncdenr.gov>; Nathan Swiggett <NSwiggett@mcdonaldvork.com>
Cc: Morman, Alaina <alaina.morman@ncdenr.gov>; mattwilliamsnc3@gmail.com
Subject: [External] RE: Construction Stormwater eNOI Status - Payment Instructions NCC204333
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
You can close this file.
It was already taken care of by the engineer.
Thank you,
Matt Williams
Project Engineer
McDonald York Building Company
801 Oberlin Rd, Suite 235 1 Raleigh, NC 27605
d:(919) 277-1049 c:(919) 200-3247
111 McDonaldY rk
Join Our Team
From: Selkane, Aziza <aziza.selkane@ncdenr.gov>
Sent: Monday, December 14, 2020 2:52 PM
To: Nathan Swiggett <NSwiggett@mcdonaldvork.com>
Cc: Morman, Alaina <alaina.morman@ncdenr.gov>; mattwilliamsnc3@gmail.com; Matt Williams
<MWilliams@mcdonaldvork.com>
Subject: RE: Construction Stormwater eNOI Status - Payment Instructions NCC204333
Good morning,
As of today, we have not yet received a payment for the Construction Stormwater Permit below. The payment is past
due as of November 10th, 2020.
Failure to pay within 30 days results in the application being terminated.
I will hold this application open for an additional 5 business days. If payment is not received by Friday, December 18th,
2020, the application will be rejected at payment verification terminating the application, and a NEW application will
need to be processed if this project is still going forward.
Thank you.
Aziza Selkane
Stormwater Program Billing Specialist
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
1612 Mail Service Center, Raleigh, NC 27699-1612
919-707-3710
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Before printing this email, please consider your budget and the environment.
From: laserfiche@ncdenr.gov [mailto:laserfiche@ncdenr.gov]
Sent: Tuesday, September 29, 2020 4:28 PM
To: Nswiggett@mcdonaldvork.com
Cc: Morman, Alaina <alaina.morman@ncdenr.gov>; mattwilliamsnc3@gmail.com; mwilliams@mcdonaldvork.com
Subject: Construction Stormwater eNOI Status - Payment Instructions
Dear Construction Stormwater Permit Applicant:
We have reviewed the eNOI that you submitted for Codina Lemur Medicine & Research Center submitted
on 9/26/2020 and found it to be complete.
Your Certificate of Coverage (COC) number: NCC204333
Project Name: Codina Lemur Medicine & Research Center
Permittee Name: McDonald York Building Company
After we receive payment of the $100 annual permit fee, we will e-mail you the COC for this project. Failure
to pay the annual fee in 30 days will result in your application being terminated.
You have two options for paying the $100 fee:
1. Use our NCGO 1 e-Payment System to pay by credit card or e-check. You will need to enter the COC
number above, as well as the names of the project and permittee.
2. Mail a $100 check made payable to "DEMLR Stormwater Program." After we receive the check in the
Raleigh Central Office, it will take 1-2 business days for us to e-mail your COC.
No matter which method of payment you choose, you must mail the original signed NOI Certification Form
to:
DEMLR Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
If you have any questions contact the Stormwater Program Assistant at suzanne.mccoy@ncdenr.gov or (919)
707-3640.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor (640K), 1612 Mail Service Center, Raleigh, NC 27699-
1612
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.