HomeMy WebLinkAboutNCC190513_Annual Fee NOD Letter_20201214ROY COOPER
cm
MICHAEL S. REGAIN
Serrilary
BRIAN WRENN
opme G1'
Glen Oaks -South, LLC
Attn: Brian Massengill
1903 Harrison Ave, Suite 101
Cary, NC 27513
d. .
NORTH CAROLINA
EnOr inerdal Quality
Subject: Notice of Deficiency- Failure to Pay Annual Fee
Invoice No. NCC190513-2020
Dear Permittee:
You are receiving a Notice of Deficiency for failure to pay the annual permit fee per the requirements of N.C. General Statute
143-215.3D(a)(4). You are receiving this notice because the annual fee of $100.00 for coverage under NPDES General
Stormwater Permit NCGO10000 for Construction Activities has not been paid. The annual fee was billed on 10/27/2020 and was
due on 11/27/2020.
The annual permit fee applies to the following construction site:
Glen Oaks Subdivision - Phase 1
North of Richland Hills Subdivision, East of US 1, Wake Forest, NC
Franklin County
Certificate of Coverage No. NCC190513
If the project was closed out prior to the invoice date, you must submit a Notice of Termination on-line, and DEQ will determine if
waiving the fee is appropriate. Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice
of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. Should you
have any questions or concerns, please contact Aziza Selkane at (919) 707-3710 or me at (919) 707-3639. Thank you for your
attention to this matter.
Sincerely,
Annette Lucas
Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
NC Reference No. NCG01-2019-0513
Nun Carolina Qeparl menergy t of EnAmnmenral Qpalliy I BIvlslnn of En, Mnera ll and Land Resources
Sit Nanh SalleburyStreet 1 1612Mall ServkeUnter I Ralelgh Nanh Carolina 27699-1612
914-707-9290