LETTER OF APPROVAL
January 14, 2020
David Vogel
David Vogel Revocable Trust
505 South Flagler Dr., Ste. 900
West Palm Beach, FL 33461
Dear Mr. Vogel,
Nathan Pennington, CFM
i'l anning Director
NOTICE —This is not a permit
This office has reviewed the Stormwater Plan submitted for the project listed below. We
find the plan to be acceptable and hereby issue this Letter of Approval.
The approval of a stormwater plan is conditioned on the applicant's compliance with federal
and state water quality laws, regulations, and rules. All other applicable county permits and
reviews must be completed prior to issuance of the stormwater permit and the beginning any
land disturbing activity.
The approval of the stormwater permit shall require an enforceable restriction on property
usage that runs with the land, such as recorded deed restrictions or protective covenants, to
ensure that future development and redevelopment maintains the site consistent with the
approved project plans.
The Buncombe County Stormwater Management Ordinance is a performance oriented
program requiring protection of the natural resources and adjoining properties. If, following
commencement of this project, it is determined that the plan is inadequate, this office may
require revisions to the plan and its implementation.
You must acquire a stormwater permit from this office. Submit a surety performance
bond as described in Division 5 Section 26-382 of the Stormwater Management
Ordinance and a permit will be issued. The amount of surety required for this project
is $100,000.000
David Vogel
Page 2 of 2
This letter gives the notice required by Chapter 26, Environment, Article VII,
Division 2,Section 26-3220)(1) of our right of periodic inspection to insure
compliance with the approved plan.
This approval shall become null and void if you have not made progress on the site within
six months after the date of approval. A one time six month extension can be granted for
good cause shown upon receiving a written request from you before the expiration of the
approved plan.
Please inform this office of the construction start date. We look forward to working with
you on this project.
Sincerely,
Mike Goodson, PE, CPESC
Stormwater Administrator
Project name: Vogel Estate Phase 3
Project No.: STW2019-00058
Location: Emmas Grove Road
Date received: January 8, 2020 (Resubmittal)
Date disapproved: January 14, 2020
Person financially responsible: David Vogel
Cc: Advantage Civil Engineering
Buncombe County Erosion Control