Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820123_Waste Utilization Plan_20190930
RECEIVED DEQJWR Waste Utilization Plan OCT 07 2019 Producer: Ronnie Brewer County: Sampson Name of Farm: Brewer Hog Farm 9-11 opo5 Location: 1801 Panhandle Rd. Faison NC 28341 PAYETTEWUF +�)I L0" )CE Phone: 910-533-3978 Type of Operation: Feed-Finish Number of Animal: 3564 Storage Structure: Anaerobic Lagoon Method of Application: ' Aerway Amount of waste produced per year: ' 6772 ton/year Amount of plant available N (PAN)produced/year: 8197 lbs./year The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater.The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient.Waste should be analyzed before each application cycle.Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in the implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates,leaching potentials, cation exchange capacities,and available water holding capacities. 3. Normally waste shall not be applied to land eroding at more than 5 tons per acre per year.Waste may be applied to land eroding at 5 or more tons per acre annually,but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils,when it is raining,or when the surface is frozen. Either of these conditions may in runoff to the surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crops production and to reduce the potential for pollution,the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy.Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above.If you choose to change methods in the future,you need to revise this plan. Nutrient levels for different applications methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility.Acreage requirements should be based on the waste analysis report from your waste management facility. In some cases you may want to have plant analysis made,which • Brewer Hog Farm 9-11 Page 2 could allow additional waste to be applied.Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and the crop type. Lime must be applied to maintain pH in the optimum range for specific crop production.This , waste utilization plan,if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. YOUR WASTE UTILIZATION PLAN IS BASED ON THE FOLLOWING: Tract No. Pull No. Soil Type Crop Yield/Ac Lbs. N - . Acres ' Lbs N - Month to - Lbs. N Code unit Used Apply Per Ac. • 6669 1A,2A- NoA CB/Hay 6.4 46 , 9.30 2725 MAR-SEP 293 6669 1A,2A - NoA SG/Hay 1 50 9.30 465 OCT-MAR 50 6669 1B,2B WaB CB/Hay 5.4 • 49 9.60 2534 MAR-SEP 264 6669 1B,2B WaB SG/Hay 1 50 9.60 480 OCT-MAR 50 _ 6669 3A OrB CB/Hay 6.4 46 4.80 " " '1406 MAR-SEP 293 " 6669 3A OrB SG/Hay 1 50 - 4.80 240 OCT-MAR 50 6669 3B,4 WaB CB/Hay 5.4 49 9.60 2534 MAR-SEP 264 6669 3B,4 - WaB SG/Hay 1 50 9.60 480 OCT-MAR 50 • 6669 6 OrB CB/Hay 6.4 46 ' 3.20 938 MAR-SEP 293 6669 6 OrB SG/Hay 1 50 , 3.20 160 . 00T-MAR 50 36.50 11963 lbs. Available Nitrogen 8197 lbs. Surplus or deficit " -3766 lbs. Applying the above amount of waste is a big job.You should plan time and have appropriate equipment to apply the waste in a timely manner. • • • • Brewer Hog Farm 9-11 Page 3 The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients.This plan only addresses nitrogen. In interplanted fields(i.e.small grain,etc.interseeded in bermudagrass),forage must be removed through grazing,hay and/or silage.Where grazing,plants should be grazed when they reach a height of six to nine inches.Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain etc.is to be removed for hay or silage,care should be exercised not to let small grain to reach maturity, especially late in the season(i.e.April or May)Shading may result if small grain gets too high and this will definitely interfere with the stand of bermudagrass.This loss of stand will result in reduced yields and less nitrogen being utilized.Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier.You may want to consider harvesting hay or silage two to three times during the season,depending on the time small grain is planted in the fall. The ideal time to interplant small grain,etc.is late September or early October.Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Caution must be exercised in grazing or haying summer annuals under stressed conditions. Nitrate poisoning may occur in livestock.Sampling forage or hay for nitrate levels'is recommended. Acres shown in the tables are considered to be the usable acres excluding required buffers,filters strips along ditches,odd areas unable to be irrigated,and perimeter areas not receiving full application rates due to equipment limitations.Actual total acres in the field listed may,and most likely will be,more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements.Your production facility will produce approximately 2117 lbs.of plant available nitrogen per year in the sludge. If you remove sludge every 5 years you will have approximately 10585 lbs.of PAN to utilize.Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 lbs/acre you will need 35 acres of land.If you apply the sludge to corn at the rate of 125 lbs.of nitrogen per acre you will need 85 acres of land.Please be aware that these are only estimates of the PAN and the land needed.Actual requirements could vary by 25%depending on the sludge waste analysis,soil types, realistic yields,and application methods. APPLICATION OF WASTE BY AERWAY The aerway application rate should not exceed the intake rate of the soil at the time of application such that runoff or ponding occurs.This rate is limited by initial soil moisture content,soil structure,soil texture,water droplet size,and organic solids.The application amount should not exceed the available water holding capacity Brewer Hog Farm 9-11 Page 4 of the soil at the time of aerway application nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If the aerway system is the method of land application for this plan,it is the responsibility of the producer and aerway designer to ensure that the aerway system is installed to properly apply the acres shown in tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. - Tract No. Pull No. Soil Type Crop Applic. Applic. Code Rate(in/hr) Amount 6669 1A,2A NoA CB/Hay 0.5 1.0 6669 1A,2A NoA SG/Hay 0.5 1.0 6669 1B,2B WaB CB/Hay• 0.5 1.0 6669 1B,2B WaB SG/Hay 0.5 1.0 6669 3A OrB CB/Hay 0.5 1.0 6669 3A OrB SG/Hay 0.5 1.0 6669 3B,4 WaB CB/Hay 0.5 1.0 ' 6669 3B,4 WaB SG/Hay 0.5 1.0 6669 6 OrB CB/Hay 0.5 1.0 6669 6 OrB SG/Hay 0.5 1.0 Brewer Hog Farm 9-11 Page 5 This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many•situations the application amount shown cannot be applied because of the nitrogen limitations.The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instances should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the eventof the 25 year 24 hour storm. It is the responsibility of the producer and the waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you have receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Brewer Hog Farm 9-11 Page 6 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff,drift,manmade conveyances,direct application,or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply waste. If the producer does not own adequate land to properly dispose of waste,he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity,allowing him/her the use of the land for waste application: It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals,method of utilization,or available land. 3. Animal waste shall be applied to meet,but not exceed,the nitrogen needs for realistic crop yields based on soil type,available moisture,historical data,climatic conditions,and level of management,unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year.Waste may be applied to land that is eroding at 5 or more tons,but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field.(See FOTG standard 393-Filter Strip). 5. Odors can be reduced by injecting the waste or disking after waste application.Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding,it will be soil incorporated on conventionally tilled cropland.When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding.(See"Weather and Climate in North Carolina"for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate that runoff does not occur offsite or to the surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils,during rainfall events,or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth.The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching.Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients.Waste shall not be applied more than 30 days prior to planting of the crop or forages,breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter,of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river(other than an irrigation ditch or canal.Animal waste other than swine waste from facilities sited on or after October 1, 1995),shall not be applied closer than 25 feet to perennial waters. (See Standard 393-Filter Strips). Brewer Hog Farm 9-11 Page 7 REQUIRED SPECIFICATIONS (continued) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by he landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters,drainage ways,or wetlands by discharge or by over-spraying.Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a"technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses,and on other grassed waterways,waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from wash down facilities,showers,toilets,sinks,etc.,shall not be discharged into the animal waste management system. 17. A-protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments,berms,pipe runs,etc.). Areas shall be fenced as necessary to protect the vegetation.Vegetation such as trees,shrubs,and other woody species,etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidences of erosion,leakage or discharge. 18. If animal production at the facility is to be suspended or terminated,the owner is responsible for obtaining and implementing a"closure plan"which will eliminate the possibility of an illegal discharge,pollution and erosion. 19. Waste handling structures,piping pumps,reels,etc.,should be inspected on a regular basis to prevent breakdowns,leaks and spills.A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetation and other crops for direct human consumption.However,if animal waste is used on crops for direct human consumption it should only be applied pre-plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and the bottom elevations of the temporary storage(pumping volume)of all waste treatment lagoons.Pumping shall be managed to maintain the liquid level between the markers.A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied.Nitrogen shall be the rate-determining element.Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metal approach excessive levels.pH shall be adjusted for optimum crop production and maintained.Soil and waste analysis records shall be kept for five(5)years. Poultry dry waste application records shall be maintained for three(3) years.Waste application records for all other waste shall be maintained for five(5)years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page 8 WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Brewer Hog Farm 9-11 Owner/Manager Agreement Ronnie Brewer I(we)understand and will follow and implement the specifications and the operation and maintenance proce- dures established in the approved animal waste utilization plan for the farm named above. I (we)know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the North Carolina Division of Water Quality before the new animals are stocked. I (we)also understand that there must be no discharge of animal waste from this system to the surface waters of the state from a storm event less severe than the 25-year,24 hour storm.The approved plan will be filed on-site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Ronnie Brewer Signature: Rep-ypvtAA' /A), g/to4.4/-e.7 Date:9_3)—/ Name of Manager(If different from owner) Signature: Date: Name of Person Preparing Plan: G.Glenn Clifton Affiliation: Prestage Farms, Inc. Phone: 910-596-5749 Address: P.O. Box 438 Clinton,NC 28329 11 Signature: t+-. Date: 19)5011, RECEIVED Waste Utilization Plan ®EQ/DIA R Producer: Ronnie Brewer County: Sampson OCT 0 7 2019 Name of Farm: - Brewer Hog Farm 9-11 Location: 1801 Panhandle Rd. Faison NC 28341 WOR08 Phone: 910-533-3978 FAY TTEVIL ERE £aN;461416: Type of Operation: Feed-Finish Number of Animal: 3564 Storage Structure: Anaerobic Lagoon Method of Application: Irrigation Amount of waste produced per year: 6772 ton/year Amount of plant available N(PAN)produced/year: 8197 lbs./year The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater.The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the-crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient.Waste should be analyzed before each application cycle.Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. • Several factors are important in the implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. 1. Always apply waste based on the•needs of the crop to be grown and the nutrient content of the waste.Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates,leaching potentials, cation exchange capacities,and available water holding capacities. 3. Normally waste shall not be applied to land eroding at more than 5 tons per acre per year.Waste may be applied to land eroding at 5 or more tons per acre annually,but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils,when it is raining,or when the surface is frozen.Either of these conditions may in runoff to the surface waters which is not, allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crops production and to reduce the potential for pollution,the waste should be applied to a growing crop•or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on the waste application method shown above. If you choose to change methods in the future,you need to revise this plan.Nutrient levels for different applications methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility.Acreage requirements should be based on the waste analysis report from your waste management facility.In some cases you may want to have plant analysis made,which Brewer Hog Farm 9-11 Page 2 could allow additional waste to be applied.Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and the crop type. Lime must be applied to maintain pH in the optimum range for specific crop production.This waste utilization plan,if carried out,meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. YOUR WASTE UTILIZATION PLAN IS BASED ON THE FOLLOWING: Tract No. Pull No. Soil Type Crop Yield/Ac Lbs.N Acres Lbs N• Month to Lbs.N Code " unit Used Apply Per Ac. 6669 1A NoB CB/Hay 6.4 46 4.88 1430 MAR-SEP 293 6669 1A NoB SG/Hay 1 50 4.88 244 OCT-MAR 50 6669 1B WaB CB/Hay 5.4 49 4.18 1104 MAR-SEP 264 6669 1B WaB SG/Hay - 1 50 4.18 209 OCT-MAR 50 6669 2A NoB CB/Hay 6.4 46 3.79 1110 MAR-SEP 293 6669 2A NoB SG/Hay 1 50 3.79 190 OCT-MAR 50 6669 2B WaB CB/Hay 5.4 49. 4.22 1114 MAR-SEP s 264 6669 2B WaB SG/Hay 1 50 . 4.22 211 OCT-MAR 50 6669 3A OrB CB/Hay 6.4 46 3.58 1049 MAR-SEP 293 6669 3A OrB SG/Hay 1 50 3.58 179 OCT-MAR 50 6669 3B WaB CB/Hay 5.4 49 4.25 1122 MAR-SEP 264 6669 3B WaB SG/Hay 1 50 4.25 213 OCT-MAR 50 6669 4 WaB CB/Hay 5.4 49 3.90 1030 MAR-SEP 264 6669 4 WaB SG/Hay . 1 , 50 3.90 195 OCT-MAR 50. 6669 6 OrB CB/Hay 6.4 46 2.95 864 MAR-SEP 293 6669 6 OrB SG/Hay 1 50 2.95 148 OCT-MAR 50 Total - 31.75 10410 lbs. Available Nitrogen 8197 lbs. ' / Surplus or deficit -2213 lbs. Applying the above amount of waste is a big job:You should plan time and have appropriate equipment to apply the waste in a timely manner. 'J Brewer Hog Farm 9-11 Page 3 The applicator is cautioned that P and K may be over applied while meeting the N requirements.In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients.This plan only addresses nitrogen. In interplanted fields:(i.e.small grain,etc.interseeded in bermudagrass),forage must be removed through grazing,hay and/or silage.Where grazing,plants should be grazed when they reach a height of six to nine inches.Cattle should be removed when plants are grazed to a height of four inches.In fields where small grain etc.is to be removed for hay or silage,care should be exercised not to let small grain to reach maturity, especially late in the season(i.e.April or May)Shading may result if small grain gets too high and this will definitely interfere with the stand of bermudagrass.This loss of stand will result in reduced yields and less nitrogen being utilized.Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier.You may want to consider harvesting hay or silage two to three times during the season,depending on the time small grain is planted in the fall. The ideal time to interplant small grain,etc.is late September or early October.Drilling is recommended over broadcasting. Bermudagrass should be grazed or mowed to a height of about two inches before drilling for best results. Caution must be exercised in grazing or haying summer annuals under stressed conditions.Nitrate poisoning may occur in livestock.Sampling forage or hay for nitrate levels is recommended. Acres shown in the tables are considered to be the usable acres excluding required buffers,filters strips along ditches,odd areas unable to be irrigated,and perimeter areas not receiving full application rates due to equipment limitations.Actual total acres in the field listed may,and most likely will be,more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. SLUDGE APPLICATION: The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements.Your production facility will produce approximately 1283 lbs.of plant available nitrogen per year in the sludge. If you remove sludge every 5 years you will have approximately 6415 lbs.of PAN to utilize.Assuming you apply this PAN to hybrid bermudagrass hayland at the rate of 300 lbs/acre you will need 21 acres of land.If you apply the sludge to corn at the rate of 125 lbs.of nitrogen per acre you will need 51 acres of land.Please be aware that these are only estimates of the PAN and the land needed.Actual requirements could vary by 25%depending on the sludge waste analysis,soil types,realistic yields,and application methods. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs.This rate is limited by initial soil moisture content,soil structure,soil texture,water droplet size,and organic solids.The application amount should not exceed the available water holding capacity a Brewer Hog Farm 9-11 Page 4 of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan,it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. Tract No. Field No. Soil Type Crop Applic. Applic. Code Rate(in/hr) Amount 6669 - 1A NoB CB/Hay 0.5 - 1.0 I 6669 1A , NoB SG/Hay 0.5' " 1.0 6669 1B. ' WaB' CB/Hay 0.5 1.0 6669 . 1B WaB SG/Hay 0.5 1.0 ' 6669 2A NoB CB/Hay 0.5 1.0 - 6669 '2A NoB SG/Hay 0.5 1.0 6669 '2B WaB CB/Hay 0.5 1.0 6669 2B WaB SG/Hay 0.5 1.0 6669 3A OrB CB/Hay' 0.5 . 1.0 6669 3A OrB • SG/Hay 0.5 1.0 6669 3B WaB CB/Hay 0.5 • 1.0 6669 3B WaB SG/Hay 0.5 1.0 6669 4 WaB CB/Hay 0.5 1.0 6669 4 WaB . SG/Hay 0.5 1.0 6669 6 OrB CB/Hay 0.5 1.0 6669 6 OrB SG/Hay 0.5 1.0 Brewer Hog Farm 9-11 Page 5 This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied.In many situations the application amount shown cannot be applied because of the nitrogen limitations.The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months.In no instances should the volume of the waste be stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and the waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates shown in the tables.Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you have receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application rate prior to applying the waste. NARRATIVE OF OPERATION Brewer Hog Farm 9-11 Page 6 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff,drift,manmade conveyances,direct application,or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply waste.If the producer does not own adequate land to properly dispose of waste,he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity,allowing him/her the use of the land for waste application.It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation,' increase in the number of animals,method of utilization,or available land. 3. Animal waste shall be applied to meet,but not exceed,the nitrogen needs for realistic crop yields based on soil type,available moisture,historical data,climatic conditions,and level of management,unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year.Waste may be applied to land that is eroding at 5 or more tons,but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field.(See FOTG standard 393-Filter Strip). 5. Odors can be reduced by injecting the waste,or disking after waste application.Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding,it will be soil incorporated on conventionally tilled cropland.When applied to conservation tilled crops or grassland, . the waste may be broadcast provided the application does not occur during a season prone to flooding.(See"Weather and Climate in North Carolina"for guidance.) 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate that runoff does not occur offsite or to the surface waters and in a method which does not cause drift from the site during application.No ponding should occur in order to control odor or flies. 8. Animal waste shall not be applied to saturated soils,during rainfall events,or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth.The potential for salt damage from animal waste should also be considered. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching.Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients.Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river(other than an irrigation ditch or canal.Animal waste other than swine waste from facilities sited on or after October 1,1995),shall not be applied closer than 25 feet to perennial waters.(See Standard 393-Filter Strips). Brewer Hog Farm 9-11 Page 7 REQUIRED SPECIFICATIONS (continued) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by he landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 15. Animal waste shall not be discharged into surface waters,drainage ways,or wetlands by discharge or by over-spraying.Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a"technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses,'and on other grassed waterways,waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from wash down facilities,showers,toilets,sinks,etc.,shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments,berms,pipe runs,etc.). Areas shall be fenced as necessary to protect the vegetation.Vegetation such as trees,shrubs,and other woody species,etc., are limited to areas where considered appropriate.Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidences of erosion,leakage or discharge. 18. If animal production at the facility is to be suspended or terminated,the owner is responsible for obtaining and implementing a"closure plan"which will eliminate the possibility of an illegal discharge,pollution and erosion. 19. Waste handling structures,piping pumps,reels,etc.,should be inspected on a regular basis to prevent breakdowns,leaks and spills.A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetation and other crops for direct human consumption. However,if animal waste is used on crops for direct human consumption it should only be applied pre-plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and the bottom elevations of the 'temporary storage(pumping volume)of all waste treatment lagoons.Pumping shall be managed to maintain the liquid level between the markers.A marker will be required to mark the maximum storage volume for waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied.Nitrogen shall be the rate-determining element.Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metal approach excessive levels.pH shall be adjusted for optimum crop production and maintained.Soil and waste analysis records shall be kept for five(5)years.Poultry dry waste application records shall be maintained for three(3) years.Waste application records for all other waste shall be maintained for five(5)years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. Page 8 WASTE UTILIZATION PLAN AGREEMENT Name of Farm: Brewer Hog Farm 9-11 Owner/Manager Agreement Ronnie Brewer I(we)understand and will follow and implement the specifications and the operation and maintenance proce- dures established in the approved animal waste utilization plan for the farm named above.I(we)know that any - expansion to the existing design capacity of the waste treatment and storage system or construction of new. facilities will require a new certification to be submitted to the North Carolina Division of Water Quality before the new animals are stocked.I(we)also understand that there must be no discharge of animal waste from this system to the surface waters of the state from a storm event less severe than the 25-year,24 hour storm.The approved plan will be filed on-site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Ronnie Brewer Signature: ��yc �✓ ��C4�-I. Date:9.3U Name of Manager(If different from owner) - Signature: Date: Name of Person Preparing Plan: G.Glenn Clifton Affiliation: Prestage Farms,Inc. Phone: 910-596-5749 Address: P.O. Box 438 Clinton,NC 28329 Signature: czik. aftj,;r Date:4130 I 9 Hard Hose Traveling Gun System Land owner: Ronnie Brewer 9-11 Facility Number: 82-123 Irrigation System Designation: X Existing Irrigation System X. New/Expanding Irrigation System Wetted Diameter:. 290 feet 70% Spacing: 200 feet Hydrant Layout: X Multiple Hydrants Single Hydrant Pull Lane Pull Location Start Stop Total Number Spacing Length Ext/Int Middle End End Acres 1A 200 745 Ext 4.19 0.69 4.88 1B 200 775 Ext 3.56 0.62 4.18 2A 200 690 Int 3.17 0.62" .3.79 2B 200 785 Int 3.60 . 0.62 4.22 3A 200 645 Int 2.96 0.62 3.58 3B 200 790 Int 3.63 0.62 4.25 4 200 570 Ext 3.21 0.69 3.90 6 Single 390 Single 2.34 0.61 2.95 L Total . 31.74 Computed By: 6. Guru') CLucam A IRRIGATION SYSTEM PARAMETERS Land Owner: Ronnie Brewer - Date: 9/30/2019 Address: 1801 Panhandle Rd Faison NC 28341 Facility No. 82-123 Telephone: 910-533-3978 County: Sampson TABLE 1- Field Specifications Maximum Maximum Maximum Application Field No. Usable and/or Size of Application per Irrigation Slope Rate Cycle Pull No. Field Soil Type (%) Crop(s) (in/hr) (inches) 1A 4.88 NoB 2-6ay 1B 4.18 WaB 0-6 CB/SG/Hay 0.5 1.0 2A 3.79 NoB 2-6 CB/SG/Hay 0.5 1.0 2B 4.22 WaB 0-6 CB/SG/Hay 0.5 1.0 3A 3.58 OrB 2-6 CB/SG/Hay 0.5 1.0 3B 4.25 WaB 0-6 CB/SG/Hay 0.5 1.0 4 3.90 WaB 0-6 CB/SG/Hay 0.5 1.0 6 2.95 OrB 2-6 V CB/SG/Hay 0.5 1.0 Computed By: 6.6gNt , O L I FJ'ou4 U , t t: > .. t ,--yr, ", r Br' e.r Half ern' _ - "4' ,.+ .. v. ? ' `. �' 4. M Y - ers s✓ r";- "'' n +'F# � ;_x/C.T • 4-p " yy .,,r.,--r-"'r^r^+!.,, l �` • ri,+•`,' r-,M ti., :17A 'ny ,,, '`" :: : � f-7 le te0' . s- �.•"'''' its - *s yt' e {�.A,�. .«a ' _ `^s -:`.:�= „ts •r _.5 ,, ,, , , h ,... _r^" r�u- .`,tc.,}ly £i ,-kcYA `i+" ;.t�i t �r Y,- W t h t , t ' -d r "�-- s _ ,-: _ a ''" W t :- ,,�.:%,,-u.-. ,,•„}.' f ` ,: t t! t't4f''' '*s ; r--` - ,Y, _ - _- y, �Y` _Y �'' J r. -xJ.,y . x .r `r t f n „i 5 " �"t' 4}N ,6 rt"'-'£- w. '_-. _fern-• �,y - .�x r to ¢�j xr'}1-1t 9?yy. f„y �xY'bn +.^_'..—.-_. — .4 + j z 7 `,. ,, ,, h `7S- . ,s +') .. i��. . :: _..1 - :�« - • -- a.: Pulls_16 2B - .. >. s'.t r'tst� '`4' 4 =f - ,:,- „;,-, 'r' '-y0 Pulis°1A,2A, . r ,r i ii - o r 4ti kk t`- rt � r :3acies;+ a' r � - i1 J � v, ,•/; 1 .i '-:•":.^ �:3 - _ • ,.«. -4 - r; .`_Fop',,° ',. w., y 1177"' •+,- i "..t- ["' ¢ F it,,,, ' f fie•"' ,^ r.... .', ."3-h "'x- - vt .:'. a I. a ,,, . — _-;<,,,,-, it ,-- - �•_ ,a_ -. _, s r i , ',` - �` .,`'. �..a. ?� + .,-- - ti _ {: i k - hf ft„ - - Pull3A _ , _ - y �\ 4.8 acres - _ - .v• .L _. <J:; _ -i. �; , -F r •- r' �', -,i, - `Pulls 3B,4 : ti "+S • A' - 9.6 acres '�� y' • ,'� 7 _ •. ` - am _ -y , :L+. • :l , 1,., :-3\,,.‘i, ___...........-- -;. , �{ +y, J, �^�, �, r/ - r,` , 3i r i <,fJt�4 ,� , . •4 �4• . !L+^ . i. " = _--" '; i �,, rye ?!ri ff rY,, �[�L,,-, kr 'W ,: _ '; 7`t5 .114. , 4, f,E„ „ .,,4''r1 I'•�. 1 p; ,.,i• x - 1 ✓ ;'�: .^� au•, -;,- _ tic " - y a �+ (� %�' y +r� ,, t t• i}5 +{ .I Pull 6 ,f % i > i o „ t - f• - • N�'. .N` ,.Y,.Y �rt+M.k.- /.s +;�a"t- .t - 1t ;rw r ) ��; 3.2 acres K`� t. .,,k • rid ``. n / ;`N �f g i 9 `t q, ,,?I' � S',+ r,'"A��' '< S r t^u �, + ", ~ u .0 .�• �SII yy 1'} f tt } � I i i y'!'r::. �'f �„ "=�__ '•'.r '!+ �4A,. 'y..p Ft 3' 'r `� �t''.' ''' , n • 4' .'g t,•7 � 4**,•s i{ '"',col !, • t x � + ?Q 'U�,� �k 3"' L t'. t L•I+G�r 'M�: '-'4'-e, t:;3r, +,\i.t X 4 .N•A' «.+,F,',Jif„. +^,,'- y�'"r jw -,y, + ''h � ; . � .ayf*1 r Itt ,_,,,,,,,,,icy(_,.,_*, i !'r N' r'x" -" . _ - '4t.' s. ;+s+:, r is 14 a"•� •s'.�"` � t 1tr F", ' {�. r� i�+TM -q 4R ' •: •-/ * .+.LLB s' 'y . �� - ,,iv / „ ,� `« '► inrrh T� 1e ' : ` •,« ,• . , , •.rams r Y _ /' x �„r q�i. S, a�. U n ':t L g „ti"' `� r'y ,e fi ',•• .,a, ;,,,, VSatHERRE•.©armin.�QOp n=treetMap�,contnbutors ofa', Or comrnunit o c }[ `fro c Ybe. s � ,4_ 4 ,y Di it'alGlo df, - - _ :',t , . ,,, e-Oye Earthntar Geo ra hi " t � ° , c,. r; -'%' is i ;�+r' " • 9 p cs.(�tnl( DG �y °NJ r °4eroGRID° ��J fln"1�.C�U� l; , 4'ta M,-..1� -i . ♦ 'Ci pk4nImunttiy` •ir.P4.et. ..P%vve; w,,'.'V.' ,TrIr:* x�, . .T- .K`.°.. ` h.r tr Lr , ty 'r-- ,«Ras.,- .,---- yZ"*-'^` ,F----1 . ' -t" a kws.. 'k'� , w"." l"+' x• '"-;:f'r ` '' ` ." r --':�^I._,mtirr 4' #'6'J• .x '•" ° r,*: ..ne Z.* ` 1 --'ate r h i y Op . �, "'r• , ' !tiro r" ��ka "may s-' ''i yam.'- i - " + , `)' • �� r - r + .; _:,_,.. , 8` elder H :44 r m 9 _ _. - �„ ; ,,a �. . •�r .E, 'V' -ems' y•xr - .5+r ,' tisS A ;t'�.,"1 f •l ss , a r,i +r,,,,4 r.. 4,-- y-,IE .,,T .. , r-: -1*""„LL ] `°"",,,g , ,fi r.y.f r ,.,5+f•' Y,.1 Y y ,.'�T !. � ..r c• r .c,,- -. ..e: r, ,r,;.. y,.yJ a I"{,` `i -- - k `.`+ ., 1,..''°" 'Sri',. '�,S'. -. ti F"' vr. .,,,A, ki 7,,, . ,ram _ � �i$. fi. .'__�ii n `-, ,ti r,? 7 9 -ht ::_*_-,::' " - s_ J4=> - :-r.'=' _ .• 'y`"",y..`"«`-- 775' _ - - _ -�N.;•Y t ,�J «+f x}r1 y 745i _ . • . N i-,,\ Y Gf 4 _ 1F aA3 - ' :: ,~, . . , - ---r7; • -- ..r.„., 1 4.,_ :- - .-r--•--6 9 0 , - = - ' 4 iy,, ,..2:8 _:— - -. - c. *: ' IA _ _. • - - `4IfL �n' : a .-r-•- • • .=:i: =,,, n a _A'. .^- ,rT .c- - _- ,. -t•T"" '{/ttfiki T • ;, . 4.4^ - -,t t , ' -R -,,-._—^f*an < , ss,. --,. `' .- '- -a1 - v4-- •" ", x.• - ...It f #t " -_ - 645' - � ` ` -_ ••ce _` { ti , - - . • -C 77 �. a �� t�'� _ } O • s " � y � � t�JL i I VI— ��a -T'�' ii frs. \\ , \ \ A , - 0 -2,_, ,_.- ..'-'"--,,-'44'at;. .' , .4 t, ..,I . , --.. - . i-,‘,;.,r r ,,- '-- :41 :�. ,Y2 } fir �. /�f 6 °" `�.' 7a , sc,�ec Iy �4 ` ;�lF9+ i �: r y ' t.' �.,--- l y i ti ro F i h F 4 l�1 r�it ,x i l p�1 t_ ,[ ��4 ` 4�1k�I �F+%�Kk r w !' t `t �k k �" r}� r!r , x ya: y` _-f--'-� 9� \ 4* _ ,.�r i',41,,I�,, t],J "141,- .411'61r i '� r .*.,•. /{'. r)>^4 *�..T,• ,k - 3 1 - ' f r YeaeN• 16, +t t•" « i r•is ```��y� 3° (' p x A f7 "1`/ '3 L, gym! -, ,r o } 0 rt{, �+ j , �, • it -� ` �>} �i~-` .-';F•.+' "f. T y�xr] V .r� x '•+ • je�,'r 9„ r f t . . •e, .t, f,i. ra, k ,� ;�. �`�. +fit• yy *� ./ ✓- '�`,-' A' ♦ ., x�yy'S',F_r IT t � wVn��Y'' -4'r �,,,, r 4. ,r N,- r..t • �' y +w1 "- '-4 y,w •a. 7• i !., ' . , �' ; • '< $�„ • ,#vP "'^T,ate r�-,i7'1 '» { r^''- ▪ � .ti,ctz""'»2'Y ,dt� .r�. ,fin ,.. .,? tf'N " ftl'F r r+5. ` - 1'`4 -.t!� f w u ,t, `. r m„• ,,.Y ! Jc.i'. •r^,,•- J �`,' ,.:.,r'' j,�r� ! , '�. r, i, �•ilt;.. 'r`' ' .;:S• , ', ,x.'_s,•-,,N . t,a• • ,47,s•• x. yy„T �1 -- ,:" • 1 'i6a ,. -,.. A �, +"tA ,v,, , , ., 'rr•7Y '-.• "Tr' h+d - t 4!� at.,•- ',1.4,t.-±rY r 4,navt�'•�"' 'ypry��r!(�' x'"r�E .-r ' •,.., nit'..: .fr, ice. 4. r •;�.' • ', . \ , ". F • a � "N�y +r. •, l f y ,HPRE rrnm,;QOO Pen= re- ap+con Mx or c„Elfool-b9GB ommunity.4 r -;rRp Digitaltinbe,; f,, , f - - :i..- , 4 'o�,•k Efl -P. ,t e o g ra o hie%CV.I`Q'�+�,i �: - u�D,,,M,,zeL° . t•} ..t..,, - { aW -�! 'F+• i s ,,. �� ' rj.� +s o [fin'OK- `,...�iY1i. .r9+'''d ' ".+ Y.Y• i -R{ r f�F,x`'"< �''t� .. C. it. ::.Al. ,4 S::: ti,. .�+-.• 5u% OP.,.i. • .kV.,`r„'S•,1i'';�n{,s„", r ,A., , C: .r r,"4�A.`•r,.. *.. 'r ill,v, .4.-.t, rr t,.,